Copper Mining News in New Brunswick

Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE
New Brunswick
Drill Results

MARKETS LIVE: Nasdaq leads Wall Street higher as investors brace for Meta, Tesla

Nine Mile Metals Ltd. reported high-grade copper equivalent intercepts at its Wedge VMS project in New Brunswick. The results include an 11.65 metre intercept at 7.13% CuEq, with significant high-grade sub-intervals.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE
New Brunswick

Nine Mile rallies on New Brunswick VMS drilling results

Nine Mile Metals reported high-grade VMS drill results at the Wedge project in New Brunswick, highlighted by a 7.13% CuEq intercept over 11.65 metres. The results extend the known mineralization footprint and include significant silver and gold credits.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE.CN
New Brunswick
Drill Results

Nine Mile Metals DDH WD-26-18 Intersects A High Grade VMS Lens, Returning 7.13% Cu-Eq Over 11.65 M Including 9.93% Cu-Eq Over 6.70 M And 10.46% Cu-Eq Over 4.80 M, With An Additional Upper 31.50m Copper Stringer Zone

Nine Mile Metals announced high-grade copper-equivalent drill results from hole WD-26-18 at its Wedge VMS Project in New Brunswick. The main intercept returned 7.13% Cu-Eq over 11.65 meters, including bonanza-grade sub-intervals of 9.93% Cu-Eq over 6.70 meters and 10.46% Cu-Eq over 4.80 meters. An additional upper copper stringer zone intersected 0.40% Cu-Eq over 31.50 meters, successfully extending the known mineralization footprint.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE
New Brunswick

Nine Mile Metals DDH WD-26-15 Intersects (2) VMS Zones Returning 4.88% Cu-Eq Over 7.6m and Acquires 14.42 km² of New Strategic Claims at Its Nine Mile Brook Project

Nine Mile Metals reported high-grade VMS drill results from hole WD-26-15 at the Wedge Mine, including 4.88% Cu-Eq over 7.6m. Additionally, the company has expanded its Nine Mile Brook Project through the acquisition of two strategic claim blocks totaling 14.42 km².

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE
New Brunswick

Nine Mile Metals DDH WD-26-15 Intersects (2) VMS Zones Returning 4.88% Cu-Eq Over 7.6m and Acquires 14.42 km² of New Strategic Claims at Its Nine Mile Brook Project

Nine Mile Metals reported high-grade assay results from drill hole WD-26-15 at the Wedge Mine, featuring a 7.6m intercept of 4.88% Cu-Eq. The company also announced the acquisition of two strategic claim blocks at its Nine Mile Brook Project, expanding its regional footprint.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE.CN
New Brunswick

Nine Mile Metals DDH WD-26-15 Intersects (2) VMS Zones Returning 4.88% Cu-Eq Over 7.6m and Acquires 14.42 km² of New Strategic Claims at Its Nine Mile Brook Project

Nine Mile Metals reported high-grade VMS drill results from hole WD-26-15 at the Wedge Mine, including a 7.6m intercept at 4.88% Cu-Eq. The company also announced the acquisition of 14.42 km² of strategic claims at its Nine Mile Brook Project.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE
New Brunswick

Nine Mile Metals Mobilizes Second Drill Rig to the Tribag-West Wedge Target Area to Test High-Priority TDEM VMS Targets

Nine Mile Metals has mobilized a second drill rig to the Tribag-West Wedge target area to test high-priority VMS targets identified via TDEM surveys. This expansion allows for simultaneous drilling at the Tribag-West targets and the existing Wedge Mine as part of the company's 10,000-metre 2026 program.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE.CN
New Brunswick

Nine Mile Metals Mobilizes Second Drill Rig to the Tribag-West Wedge Target Area to Test High-Priority TDEM VMS Targets

Nine Mile Metals has mobilized a second drill rig to the Tribag-West Wedge target area to test high-priority TDEM VMS targets. This allows exploration to proceed at Tribag while Phase 3 drilling continues at the Wedge Mine as part of the company's 10,000-metre 2026 program.

View story
Raptor Metals Ltd
Raptor Metals Ltd
RAP
New Brunswick, Canada

RAP: Annual Report to shareholders

Raptor Metals Ltd's annual report for FY2026 details a transformational year, including a strategic shift to Canadian copper and polymetallic projects. The company completed a maiden 19-hole drill program at its flagship Chester Copper Project, reporting high-grade copper and polymetallic intersections that confirmed and extended mineralization. It also acquired the Coyote and Foghorn projects, expanding its regional footprint, and commenced metallurgical test work at Chester.

View story
Nine Mile Metals Ltd.
Nine Mile Metals Ltd.
NINE.CN
New Brunswick
Drill Results

Nine Mile Metals DDH Wd-26-14 Intersects 5.09% Cu-Eq Over 14.15m Including 6.35% Cu-Eq Over 9m and 7.45% Cu-Eq Over 6m

Nine Mile Metals announced high-grade polymetallic drill results from hole DDH WD-26-14 at its Wedge Mine in New Brunswick, intersecting 5.09% Cu-Eq over 14.15m true width, including higher-grade sub-intervals. The VMS mineralization shows increasing grades with depth, and the company plans further drilling guided by BHEM surveys to characterize the depth and lateral extent of the lenses.

View story