Aton Reports the First Results from its Abu Marawat RC Infill Drill Programme, Including 17.13 g/t Gold, 307 g/t Silver, 0.82% Copper and 5.50% Zinc Over a 9 Metre Interval
Aton Resources has reported exceptional infill drill results from its Abu Marawat project, including 21.85 g/t gold, 178 g/t silver, 0.55% copper, and 5.21% zinc over 20 metres, and 17.13 g/t gold, 307 g/t silver, 0.82% copper, and 5.50% zinc over 9 metres. These high-grade polymetallic intercepts, part of a program to upgrade resources to the Indicated category, significantly exceed prior best grade-thickness values for the project. The company also confirmed that metallurgical testwork indicates successful recovery of all four metals and plans to release an updated mineral resource statement for the entire Abu Marawat Concession later this year.