GreenLight Metals Intersects 52.18m of 1.12 g/t Au (1.28% CuEq) Including 10.82m of 2.49 g/t Au (2.75% CuEq) at the Bend VMS Deposit in Wisconsin
GreenLight Metals has reported drill results from the Bend VMS Project in Wisconsin, featuring a 52.18m intercept of 1.12 g/t Au. The results demonstrate down-dip extension of gold-bearing mineralization.