Mining News in Manitoba

Visionary Copper and Gold Mines Inc.
Visionary Copper and Gold Mines Inc.
VCG
Manitoba

Visionary Copper shares up 16% on Manitoba VMS permitting news

Visionary Copper has received two exploration work permits from the Province of Manitoba for its Pine Bay VMS project. These permits authorize drilling and geophysical work at the Rainbow deposit through December 2028.

View story
Visionary Copper and Gold Mines Inc.
Visionary Copper and Gold Mines Inc.
VCG.V
Manitoba

Visionary Receives Exploration Permits for Its High-Grade Copper and Gold Pine Bay Project in the Flin Flon Mining District, Manitoba

Visionary Copper and Gold Mines Inc. has received two exploration work permits from the Province of Manitoba for its Pine Bay and Alberts Lake properties, valid through December 31, 2028. These permits authorize surface diamond drilling, line cutting, geophysics, and trail clearing, allowing the company to advance planned exploration at its high-grade copper and gold project. The company also highlighted its existing Rainbow deposit resource and ongoing efforts to secure an Advanced Exploration Permit for potential early production.

View story
Visionary Copper and Gold Mines Inc.
Visionary Copper and Gold Mines Inc.
VCG
Manitoba

Visionary Copper and Gold Mines Receives Exploration Permits for Its High-Grade Copper and Gold Pine Bay Project in the Flin Flon Mining District, Manitoba

Visionary Copper and Gold Mines has received two exploration work permits from the Province of Manitoba for its Pine Bay Project, valid until the end of 2028. The permits authorize diamond drilling, geophysics, and line cutting at the Rainbow and Alberts Lake properties. The company is also awaiting an Advanced Exploration Permit (AEP) to support potential early production via a bulk sample.

View story
Minnova
Minnova
MCI
Gold
Manitoba

Minnova maps $53M restart for Manitoba gold mine

Minnova has released a Preliminary Economic Assessment (PEA) for its PL gold mine in Manitoba, outlining a $53.4 million restart plan targeting 2028 production. The study projects an 111% IRR and an annual production of 62,200 oz gold over 10 years, leveraging existing infrastructure and an initial open-pit mining phase.

View story
Minnova Corp.
Minnova Corp.
MCI
Gold
Manitoba

Minnova Announces Positive Preliminary Economic Assessment for the PL Gold Mine Restart: After-Tax NPV5% of US$181 Million and 111% IRR at US$3,000/oz Gold, Rising to US$439 Million at US$4,000/oz

Minnova Corp. announced a positive Preliminary Economic Assessment (PEA) for the restart of its PL Gold Mine, projecting an after-tax NPV5% of US$180.6 million and an IRR of 111% at a base case gold price of US$3,000/oz. The study highlights low pre-production capital of US$53.4 million, a rapid payback of 0.68 years, and a 10-year mine life producing 621.5 thousand ounces of gold. The PEA is based on a 2026 Mineral Resource Estimate that includes high-grade Measured and Indicated resources.

View story
Minnova Corp.
Minnova Corp.
MCI
Gold
Manitoba

Minnova Announces Positive Preliminary Economic Assessment for the PL Gold Mine Restart: After-Tax NPV5% of US$181 Million and 111% IRR at US$3,000/oz Gold, Rising to US$439 Million at US$4,000/oz

Minnova announced a positive Preliminary Economic Assessment (PEA) for its PL Gold Mine restart, projecting an after-tax NPV5% of US$181 million and an IRR of 111% at a base case gold price of US$3,000/oz. The study highlights low pre-production capital of US$53.4 million, a short 0.68-year payback, and estimated production of 621.5 thousand ounces of gold over a 10-year mine life. The PEA is based on a combined open-pit and underground operation, utilizing existing mill and site infrastructure, and incorporates the 2026 Mineral Resource Estimate.

View story
NiCAN Limited
NiCAN Limited
NICN
Manitoba
Drill Results

NiCAN Confirms Horseshoe Gold Zone Extends Beyond 400-Metre in Strike and Points to a Significantly Larger Opportunity to the South at Pipy Property, Thompson, Manitoba

NiCAN Limited announced drill results from its Pipy South Property in Manitoba, confirming the Horseshoe Gold Zone extends over 400 meters in strike length with broad, near-surface gold mineralization. The program also identified larger, geologically similar structures to the south, pointing to significant exploration upside. While most new intercepts show moderate to weak gold grades, a high-grade sub-interval of 8.01 g/t Au over 2.0 meters was reported, and the company plans further drilling to test extensions and new targets.

View story
NiCAN Limited
NiCAN Limited
NICN.V
Manitoba
Drill Results

NiCAN Confirms Horseshoe Gold Zone Extends Beyond 400-Metre in Strike and Points to a Significantly Larger Opportunity to the South at Pipy Property, Thompson, Manitoba

NiCAN Limited announced complete assay results from a 16-hole diamond drill program at its Pipy South Property, confirming the Horseshoe Gold Zone extends over 400 metres in strike length and remains open in all directions. The program intersected broad, near-surface gold mineralization, including a high-grade intercept of 8.01 g/t Au over 2.0 metres. Geological work also identified larger, geologically similar structures to the south, indicating significant exploration potential.

View story
NiCAN Limited
NiCAN Limited
NICN
Manitoba
Drill Results

NiCAN Confirms Horseshoe Gold Zone Extends Beyond 400-Metre in Strike and Points t...

NiCAN Limited announced complete assay results from a 16-hole diamond drill program at its Pipy South Property in Manitoba, confirming the Horseshoe Gold Zone extends over 400 metres in strike length and remains open in all directions. The program intersected broad, near-surface gold mineralization, with highlights including 8.01 g/t gold over 2.0 metres within a 30.0-metre interval of 0.90 g/t gold. Geological work also identified potentially larger, geologically similar structures to the south, indicating significant exploration upside.

View story
NiCAN Limited
NiCAN Limited
NICN
Thompson, Manitoba
Drill Results

NiCAN Confirms Horseshoe Gold Zone Extends Beyond 400-Metre in Strike and Points to a Significantly Larger Opportunity to the South at Pipy Property, Thompson, Manitoba

NiCAN Limited announced drill results from its Pipy South Property in Manitoba, confirming the Horseshoe Gold Zone extends over 400 metres in strike length and remains open in all directions. The program intersected broad, near-surface gold mineralization, with highlights including 8.01 g/t Au over 2.0 metres and 1.05 g/t Au over 28.3 metres. The company also identified potential for significantly larger, geologically similar structures to the south, which will guide future exploration.

View story