BMC: BMC Extends Polymetallic Mineralization at Rhyolite Peak
BMC Minerals Ltd. announced high-grade polymetallic drill results from nine holes at its Rhyolite Peak prospect, part of the Kudz Ze Kayah Project in Yukon, Canada. Key intercepts include 5.2m (5.1m true width) at 233g/t Ag, 9.0% Zn, 1.7g/t Au, 0.4% Cu, 2.6% Pb, and 4.0m (2.6m true width) at 264g/t Ag, 9.0% Zn, 2.9g/t Au, 0.6% Cu, 4.3% Pb. These results extend the known mineralization at Rhyolite Peak, which is located approximately 1,200m from the proposed ABM Mine.