Green Bridge Metals Corporation
Drill Results
Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target
Green Bridge Metals announced final assay results from its Phase 1 diamond drill program at the Titac Project in Minnesota, highlighted by a 195.0m intercept grading 0.25% Cu and 10.18% TiO2 in hole TS26-004a. An exploratory step-out hole, TS26-007, successfully confirmed mineralization at a previously untested geophysical target, validating the company's 3D VTEM inversion modelling. These positive results have increased confidence in the geological model and led to the acceleration of a Phase 2 drilling program focused on resource expansion and copper integration.