Defense Metals Resource Upgrade Drilling Intersects 2.33% TREO over 153 Metres at the Wicheeda Rare Earth Project
Defense Metals announced final assay results from ten core drill holes at its Wicheeda Rare Earth Project, totaling 1,702 metres. The resource infill drilling successfully intersected significant widths of moderate to high-grade rare earth element mineralization, with several holes exceeding predicted inferred block model grades. These results are expected to positively contribute to an uplift in resource classification from Inferred to Indicated or better.