Hydrogen Mining News in Quebec

Quebec Innovative Materials Corp.
Quebec Innovative Materials Corp.
QIMC
Hydrogen
Quebec

QIMC launches 78-km natural hydrogen survey

Quebec Innovative Materials Corp. (QIMC) has launched a 78-km 2D seismic survey across Quebec and Nova Scotia to map subsurface structures related to hydrogen anomalies. The campaign aims to guide future drilling and pilot production efforts, following a record 30.0% H2 reading in a previous Nova Scotia hole.

View story
HPQ Silicon Inc.
HPQ Silicon Inc.
HPQ.V
Québec
Metallurgical Results

HPQ Silicon's Novacium to Present HyDRAS(TM) Research on Hydrogen Production and Aluminum Waste Valorization at COM 2026

HPQ Silicon's partner, Novacium, will present research at COM 2026 regarding its HyDRAS™ process, which produces hydrogen from aluminum industry waste. The research demonstrates that using bauxite residue can more than double hydrogen yield and increase production flowrates.

View story
Québec Innovative Materials Corp.
Québec Innovative Materials Corp.
QIMC
Québec

QIMC Reports Multiple Elevated Hydrogen Mud-Gas Readings Over 100m-250m Interval of DDH-26-04, Including a Peak Hydrogen Reading of 16.0%, Two Hydrogen Readings of 13.5%, and Nine Readings at or Above 5% Hydrogen

Québec Innovative Materials Corp. reported preliminary mud-gas geochemical results from diamond drill hole DDH-26-04. The 100m-250m interval showed multiple elevated hydrogen readings, including a peak of 16.0%, while methane and carbon dioxide levels remained very low.

View story
Québec Innovative Materials Corp.
Québec Innovative Materials Corp.
QIMC
Hydrogen
Québec

QIMC Details Multiple Shallow Hydrogen-Bearing Zones in Drill Hole 26-02 and Advances Integrated Interpretation of Holes 1 and 2; Drill Hole 2 to be Extended to 700 Metres; Drill Mobilized for Hole 3

Québec Innovative Materials Corp. has reported preliminary results from drill hole 26-02, identifying multiple shallow hydrogen-bearing zones. The company is also advancing the integrated interpretation of holes 1 and 2 and has mobilized drilling for hole 3.

View story