Global Gold Mining
Metallurgical Results
GGM: Sturec Metallurgical Tests Achieve up to 91.4% Gold Recovery
Global Gold Mining announced highly encouraging metallurgical test results for its Sturec Gold deposit in Slovakia, achieving gold recoveries of up to 91.4% to flotation concentrate from Fresh and Channel composites. These results will inform the Pre-feasibility Study and support a simple flotation flowsheet. The testwork was conducted at ALS Metallurgy under the supervision of Mining One Consultants and is JORC compliant.