GreenLight Metals Intersects 27.72m of 1.07% Cu and 0.97 g/t Au (2.10% CuEq) including 15.65m of 1.66% Cu and 1.39 g/t Au (3.14% CuEq) at the Bend VMS Deposit in Wisconsin
GreenLight Metals has reported high-grade copper and gold drill results from the Bend VMS Project in Wisconsin. The assays from holes B26-008 and B26-010 confirm the extension of mineralization both down-dip and along strike.