Copper Mining News in Dos Amigo Mining District

ATERRA Metals Inc.
ATERRA Metals Inc.
ATC
Dos Amigo Mining District
Drill Results

ATERRA Reports Totora Cu/Au Project Drilling Returns 284 m Grading 0.64% CuEq Including 180 m at 0.71% CuEq

ATERRA Metals reported Phase I drill results from the Totora Cu/Au Project, featuring a substantial 284m intercept at 0.64% CuEq. The intercept includes a high-grade 180m section at 0.71% CuEq.

View story