XRA: Annual Report to shareholders

Original announcement by asx on

Company
Xenora Minerals Ltd
Ticker
XRA
Exchange
ASX
Region
Unavailable
Primary commodity
Lithium
Secondary commodities
Zinc, Copper, Lead, Silver
Document categories
Resource update, Capital raise, Agreement transaction
Extracted
2026-09-23 08:12:35 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Xenora Minerals Ltd (XRA) released its Annual Report for the year ended 30 June 2026, detailing exploration activities at its lithium projects in South Australia and Canada, and reporting a historical Mineral Resource Estimate for the Mt Hardy Project. The company completed capital raises totaling $3.03 million during the year and advanced its earn-in at the Dudley Lithium Project, with drilling planned for later in 2026. The report includes an unchanged Inferred Mineral Resource Estimate for the Mt Hardy Project's Hendrix deposit, effective 10 July 2019, for zinc, copper, lead, and silver.

Reasoning: Xenora Minerals Ltd's annual report highlights successful capital raises and progress on its Dudley Lithium Project earn-in, with drilling planned. However, the reported Mt Hardy Mineral Resource Estimate is historical and entirely in the Inferred category, limiting its current materiality.

Positive factors

  • Funding Secured
  • Project Advancement

Negative factors

  • Stale Estimate
  • All Inferred

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 45

Classification and evidence

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document includes an 'Annual Mineral Resources and Reserves' section with a detailed table for the Hendrix Inferred Mineral Resource Estimate.

Evidence · text

“Annual Mineral Resources and Reserves”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The entire Hendrix Mineral Resource Estimate is classified as 'Inferred'.

Evidence · table

“Inferred”

Context: 2,700,000

All Inferrednegative

100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The Hendrix Mineral Resource Statement explicitly lists all reported tonnage under the 'Inferred' category, with no Measured or Indicated resources.

Evidence · table

“Inferred”

Context: 2,700,000

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The report states that the Mineral Resource Estimate is based on information compiled by Andrew Thompson and approved by Sam Ekins, both members of relevant professional bodies.

Evidence · text

“The information in this report that relates to the Inferred Hendrix Mineral Resource is based on information compiled by Andrew Thompson, who is an employee of S2 Resources and was carrying out work for Trinex Minerals under a Shared Services Agreement between the companies. Mr Thompson is a member of the Australian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience of relevance to the style of mineralisation and the types of deposits under consideration, and to the activities undertaken, to quality as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasia Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. This Resources Statement remains materially unchanged and is consistent with the Mineral Resource Estimation announced by the Company on 10 July 2019. The re-listing of the resources statement as a whole has been approved by Sam Ekins, who is a Non-Executive Director of Xenora Minerals Limited. Mr. Ekins is a Member of the Australian Institute of Mining and Metallurgy. Mr. Ekins consents to the inclusion of the Mineral Resources Statement in this annual report in the form and context in which it appears.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource Estimate is stated to be in accordance with the JORC Code (2012 Edition).

Evidence · text

“to quality as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasia Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.”

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: The Mineral Resource Estimate is stated to be unchanged since 10 July 2019, making it over two years old at the reporting date of 30 June 2026.

Evidence · text

“There has been no change in the Hendrix Inferred Mineral Resource since 10 July 2019.”

Extracted facts

Stored fact records: 45. Some facts used in scoring do not have a stored record.

Resource Estimates (45)

inferredMt Hardy Project · zincTonnes: 2700000Grade: 6.5Grade Unit: %Contained Metal: 176000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:cb42797f42e05015055b
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2700000
Grade
6.5
Grade Unit
%
Contained Metal
176000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.3
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.7 Mt at 6.5% Zn at a 0.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“6.5”

Context: 2,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2700000Grade: 0.9Grade Unit: %Contained Metal: 23200Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:cb42797f42e05015055b
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2700000
Grade
0.9
Grade Unit
%
Contained Metal
23200
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.3
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.7 Mt at 0.9% Cu at a 0.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2700000Grade: 1.5Grade Unit: %Contained Metal: 40000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:cb42797f42e05015055b
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2700000
Grade
1.5
Grade Unit
%
Contained Metal
40000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.3
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.7 Mt at 1.5% Pb at a 0.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.5”

Context: 2,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2700000Grade: 34Grade Unit: g/tContained Metal: 3000000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:cb42797f42e05015055b
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2700000
Grade
34
Grade Unit
g/t
Contained Metal
3000000
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.3
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.7 Mt at 34 g/t Ag at a 0.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“34”

Context: 2,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2600000Grade: 6.6Grade Unit: %Contained Metal: 175000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
6.6
Grade Unit
%
Contained Metal
175000
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.4
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 6.6% Zn at a 1.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“6.6”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2600000Grade: 0.9Grade Unit: %Contained Metal: 22700Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
0.9
Grade Unit
%
Contained Metal
22700
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.4
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 0.9% Cu at a 1.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2600000Grade: 1.5Grade Unit: %Contained Metal: 40000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
1.5
Grade Unit
%
Contained Metal
40000
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.4
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 1.5% Pb at a 1.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.5”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2600000Grade: 34Grade Unit: g/tContained Metal: 2900000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
34
Grade Unit
g/t
Contained Metal
2900000
Contained Unit
oz
Cutoff Grade
1
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.4
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 34 g/t Ag at a 1.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“34”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2600000Grade: 6.7Grade Unit: %Contained Metal: 175000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
6.7
Grade Unit
%
Contained Metal
175000
Contained Unit
t
Cutoff Grade
1.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 6.7% Zn at a 1.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“6.7”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2600000Grade: 0.9Grade Unit: %Contained Metal: 22500Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
0.9
Grade Unit
%
Contained Metal
22500
Contained Unit
t
Cutoff Grade
1.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 0.9% Cu at a 1.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2600000Grade: 1.5Grade Unit: %Contained Metal: 40000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
1.5
Grade Unit
%
Contained Metal
40000
Contained Unit
t
Cutoff Grade
1.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 1.5% Pb at a 1.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.5”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2600000Grade: 35Grade Unit: g/tContained Metal: 2900000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:c4406af2b215a7d93d7d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2600000
Grade
35
Grade Unit
g/t
Contained Metal
2900000
Contained Unit
oz
Cutoff Grade
1.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.6 Mt at 35 g/t Ag at a 1.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“35”

Context: 2,600,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2500000Grade: 6.8Grade Unit: %Contained Metal: 173000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
6.8
Grade Unit
%
Contained Metal
173000
Contained Unit
t
Cutoff Grade
2
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 6.8% Zn at a 2.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“6.8”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2500000Grade: 0.9Grade Unit: %Contained Metal: 22000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
0.9
Grade Unit
%
Contained Metal
22000
Contained Unit
t
Cutoff Grade
2
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 0.9% Cu at a 2.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2500000Grade: 1.6Grade Unit: %Contained Metal: 40000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
1.6
Grade Unit
%
Contained Metal
40000
Contained Unit
t
Cutoff Grade
2
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 1.6% Pb at a 2.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.6”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2500000Grade: 35Grade Unit: g/tContained Metal: 2900000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
35
Grade Unit
g/t
Contained Metal
2900000
Contained Unit
oz
Cutoff Grade
2
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 35 g/t Ag at a 2.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“35”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2500000Grade: 7Grade Unit: %Contained Metal: 172000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
7
Grade Unit
%
Contained Metal
172000
Contained Unit
t
Cutoff Grade
2.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.8
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 7.0% Zn at a 2.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“7.0”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2500000Grade: 0.9Grade Unit: %Contained Metal: 21500Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
0.9
Grade Unit
%
Contained Metal
21500
Contained Unit
t
Cutoff Grade
2.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.8
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 0.9% Cu at a 2.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2500000Grade: 1.6Grade Unit: %Contained Metal: 39000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
1.6
Grade Unit
%
Contained Metal
39000
Contained Unit
t
Cutoff Grade
2.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.8
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 1.6% Pb at a 2.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.6”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2500000Grade: 35Grade Unit: g/tContained Metal: 2800000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:fd3e0686eb26ff56f5d3
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2500000
Grade
35
Grade Unit
g/t
Contained Metal
2800000
Contained Unit
oz
Cutoff Grade
2.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
10.8
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.5 Mt at 35 g/t Ag at a 2.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“35”

Context: 2,500,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2400000Grade: 7.1Grade Unit: %Contained Metal: 170000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:d864d28e128b7b10ea26
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2400000
Grade
7.1
Grade Unit
%
Contained Metal
170000
Contained Unit
t
Cutoff Grade
3
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.4 Mt at 7.1% Zn at a 3.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“7.1”

Context: 2,400,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2400000Grade: 0.9Grade Unit: %Contained Metal: 21100Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:d864d28e128b7b10ea26
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2400000
Grade
0.9
Grade Unit
%
Contained Metal
21100
Contained Unit
t
Cutoff Grade
3
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.4 Mt at 0.9% Cu at a 3.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,400,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2400000Grade: 1.6Grade Unit: %Contained Metal: 38000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:d864d28e128b7b10ea26
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2400000
Grade
1.6
Grade Unit
%
Contained Metal
38000
Contained Unit
t
Cutoff Grade
3
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.4 Mt at 1.6% Pb at a 3.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.6”

Context: 2,400,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2400000Grade: 36Grade Unit: g/tContained Metal: 2800000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:d864d28e128b7b10ea26
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2400000
Grade
36
Grade Unit
g/t
Contained Metal
2800000
Contained Unit
oz
Cutoff Grade
3
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.4 Mt at 36 g/t Ag at a 3.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“36”

Context: 2,400,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2300000Grade: 7.2Grade Unit: %Contained Metal: 167000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:dcbce59af563870bd3c9
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2300000
Grade
7.2
Grade Unit
%
Contained Metal
167000
Contained Unit
t
Cutoff Grade
3.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.2
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.3 Mt at 7.2% Zn at a 3.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“7.2”

Context: 2,300,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2300000Grade: 0.9Grade Unit: %Contained Metal: 20600Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:dcbce59af563870bd3c9
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2300000
Grade
0.9
Grade Unit
%
Contained Metal
20600
Contained Unit
t
Cutoff Grade
3.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.2
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.3 Mt at 0.9% Cu at a 3.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,300,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2300000Grade: 1.6Grade Unit: %Contained Metal: 37000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:dcbce59af563870bd3c9
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2300000
Grade
1.6
Grade Unit
%
Contained Metal
37000
Contained Unit
t
Cutoff Grade
3.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.2
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.3 Mt at 1.6% Pb at a 3.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.6”

Context: 2,300,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2300000Grade: 36Grade Unit: g/tContained Metal: 2700000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:dcbce59af563870bd3c9
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2300000
Grade
36
Grade Unit
g/t
Contained Metal
2700000
Contained Unit
oz
Cutoff Grade
3.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.2
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.3 Mt at 36 g/t Ag at a 3.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“36”

Context: 2,300,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2200000Grade: 7.5Grade Unit: %Contained Metal: 162000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:6d03a8f57b72d1ce149d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2200000
Grade
7.5
Grade Unit
%
Contained Metal
162000
Contained Unit
t
Cutoff Grade
4
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.2 Mt at 7.5% Zn at a 4.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“7.5”

Context: 2,200,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2200000Grade: 0.9Grade Unit: %Contained Metal: 19900Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:6d03a8f57b72d1ce149d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2200000
Grade
0.9
Grade Unit
%
Contained Metal
19900
Contained Unit
t
Cutoff Grade
4
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.2 Mt at 0.9% Cu at a 4.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“0.9”

Context: 2,200,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2200000Grade: 1.6Grade Unit: %Contained Metal: 35000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:6d03a8f57b72d1ce149d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2200000
Grade
1.6
Grade Unit
%
Contained Metal
35000
Contained Unit
t
Cutoff Grade
4
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.2 Mt at 1.6% Pb at a 4.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.6”

Context: 2,200,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2200000Grade: 37Grade Unit: g/tContained Metal: 2600000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:6d03a8f57b72d1ce149d
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2200000
Grade
37
Grade Unit
g/t
Contained Metal
2600000
Contained Unit
oz
Cutoff Grade
4
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
11.5
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.2 Mt at 37 g/t Ag at a 4.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“37”

Context: 2,200,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 2000000Grade: 7.8Grade Unit: %Contained Metal: 153000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:0331daede4b4a9d357a0
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2000000
Grade
7.8
Grade Unit
%
Contained Metal
153000
Contained Unit
t
Cutoff Grade
4.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.0 Mt at 7.8% Zn at a 4.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“7.8”

Context: 2,000,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 2000000Grade: 1Grade Unit: %Contained Metal: 18800Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:0331daede4b4a9d357a0
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2000000
Grade
1
Grade Unit
%
Contained Metal
18800
Contained Unit
t
Cutoff Grade
4.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.0 Mt at 1.0% Cu at a 4.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.0”

Context: 2,000,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 2000000Grade: 1.7Grade Unit: %Contained Metal: 34000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:0331daede4b4a9d357a0
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2000000
Grade
1.7
Grade Unit
%
Contained Metal
34000
Contained Unit
t
Cutoff Grade
4.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.0 Mt at 1.7% Pb at a 4.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.7”

Context: 2,000,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 2000000Grade: 39Grade Unit: g/tContained Metal: 2400000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:0331daede4b4a9d357a0
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
2000000
Grade
39
Grade Unit
g/t
Contained Metal
2400000
Contained Unit
oz
Cutoff Grade
4.5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 2.0 Mt at 39 g/t Ag at a 4.5% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“39”

Context: 2,000,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · zincTonnes: 1700000Grade: 8.2Grade Unit: %Contained Metal: 142000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:8029edb0bba55bdae3c8
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
1700000
Grade
8.2
Grade Unit
%
Contained Metal
142000
Contained Unit
t
Cutoff Grade
5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 1.7 Mt at 8.2% Zn at a 5.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“8.2”

Context: 1,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · copperTonnes: 1700000Grade: 1Grade Unit: %Contained Metal: 17300Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:8029edb0bba55bdae3c8
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
1700000
Grade
1
Grade Unit
%
Contained Metal
17300
Contained Unit
t
Cutoff Grade
5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 1.7 Mt at 1.0% Cu at a 5.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.0”

Context: 1,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · leadTonnes: 1700000Grade: 1.8Grade Unit: %Contained Metal: 32000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:8029edb0bba55bdae3c8
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
1700000
Grade
1.8
Grade Unit
%
Contained Metal
32000
Contained Unit
t
Cutoff Grade
5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 1.7 Mt at 1.8% Pb at a 5.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“1.8”

Context: 1,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

inferredMt Hardy Project · silverTonnes: 1700000Grade: 41Grade Unit: g/tContained Metal: 2300000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Hardy Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
XRA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Andrew Thompson, Sam Ekins
Resource group id
resource:8029edb0bba55bdae3c8
Deposit or zone
Hendrix

Resource Data

Category
inferred
Tonnes
1700000
Grade
41
Grade Unit
g/t
Contained Metal
2300000
Contained Unit
oz
Cutoff Grade
5
Cutoff Unit
% ZnEq

Prior Estimate

Resource Date
2019-07-10

Metal Equivalent

Metal Eq. Grade
12.7
Metal Eq. Unit
% ZnEq

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2019-07-10T00:00:00.000Z

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: This Inferred Mineral Resource Estimate for the Hendrix deposit, unchanged since 2019, reports 1.7 Mt at 41 g/t Ag at a 5.0% ZnEq cut-off, indicating early-stage geological confidence and is historical.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • All Inferred
  • Stale Estimate

Evidence · table

“41”

Context: 1,700,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 7.2 years before this release

Fact 41View all details
Link to this fact

Identity

Ticker
XRA

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: The company successfully completed the second tranche of a capital raising, securing $0.93 million through the issuance of 3.716 billion shares to sophisticated investors, which is material for funding operations.

Positive factors

  • Funding Secured

Negative factors

  • Dilution

Evidence · text

“The Company completed the second tranche of the capital raising announced on 15 May 2025, issuing 3.716 billion shares on 2 July 2025 to sophisticated investors and raising $0.93 million before costs.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 42View all details
Link to this fact

Identity

Ticker
XRA

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: The company completed Tranche 1 of a capital raising, issuing 11.67 million shares at $0.16 per share to raise $1.87 million, providing significant funding for its activities.

Positive factors

  • Funding Secured

Negative factors

  • Dilution

Evidence · text

“Tranche 1: 11,670,360 were issued on 13 October 2025 to raise $1,867,258 before costs.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 43View all details
Link to this fact

Identity

Ticker
XRA

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: The company completed Tranche 2 of a capital raising, issuing 1.45 million shares to Directors at $0.16 per share to raise $0.23 million, contributing to the company's funding.

Positive factors

  • Funding Secured

Negative factors

  • Dilution

Evidence · text

“Tranche 2: 1,454,640 were issued to Directors on 3 December 2025 following shareholder approval at the Annual General Meeting ('AGM') on 27 November 2025, to raise $232,742 before costs.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 44Dudley Lithium ProjectView all details
Link to this fact

Identity

Project
Dudley Lithium Project
Region
australia_sa
Reported Region
South Australia
Ticker
XRA

Resource scope

Resource group id
resource:be7f0199eda399c8f138

Prior Estimate

Resource Date
2026-01-09

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: The company elected to proceed with Stage 1b of the Dudley Lithium Project earn-in, involving a cash payment and share issuance, demonstrating continued commitment and progress on the project.

Positive factors

  • Project Advancement

Evidence · text

“On 9 January 2026, the Company elected to proceed with Stage 1b of the earn-in for the Dudley Lithium Project. In accordance with the earn-in terms, the Company paid $37,500 and issued 393,701 fully paid ordinary shares, representing an agreed value of $100,000.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 45Mount Hardy ProjectView all details
Link to this fact

Identity

Project
Mount Hardy Project
Ticker
XRA

Resource scope

Resource group id
resource:0f06eaeaddcca40634d4

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Rehabilitation activities at the Mount Hardy Project are ongoing, aiming to complete required works and recover environmental bonds, indicating responsible environmental management.

Positive factors

  • Environmental Compliance

Evidence · text

“Rehabilitation activities were undertaken at the Mount Hardy Project during the year, with the objective of completing the required works and facilitating the return of the associated cash-backed environmental bonds.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.