WIN: WIN Metals - Investor Presentation October 2026

Original announcement by asx on

Company
WIN Metals
Ticker
WIN
Exchange
ASX
Region
Western Australia
Primary commodity
Gold
Secondary commodities
Nickel, Lithium, Rubidium
Document categories
Other, Permitting, Metallurgy, Resource update
Extracted
2026-10-21 01:05:26 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

WIN Metals presented an investor update outlining its three-pillar Western Australian gold strategy, centered on the Radio Gold Project, Butchers Creek, and Mt Edwards. The company highlighted the completion of the Radio Gold Re-Start Study with strong economics, the lodging of key restart permits, and confirmed high gold recoveries. Additionally, the presentation noted successful rubidium extraction testwork at the Faraday Critical Minerals Project and the completion of a strategic deal with Astral Resources.

Reasoning: The presentation provides a positive overview of WIN Metals' strategy and project advancements, highlighting recent milestones in permitting, metallurgy, and corporate transactions, despite some project-specific risks.

Positive factors

  • Radio Gold Project restart study complete with positive economics (A$18m NPV8, 84% IRR, 11-month payback)
  • Key restart permits lodged for Radio Gold
  • High gold recovery confirmed for Radio Gold (95%+ combined gravity and leach)
  • Strategic consolidation around Radio Gold (Princess Royal acquired, Stumpy Doodle option)
  • Successful rubidium extraction (up to 96.7%) at Faraday Critical Minerals Project
  • Astral deal completed, securing gold rights and funding
  • Diversified project portfolio with gold, nickel, and critical minerals

Negative factors

  • Radio Gold Re-Start Study is preliminary, with 14% Inferred Mineral Resources
  • Peak pre-finance funding of ~A$19m not yet secured for Radio Gold
  • Mt Edwards Nickel Project is in care and maintenance

Facts used in scoring: 15

Classification and evidence

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Extracted facts

Stored fact records: 13. Some facts used in scoring do not have a stored record.

Resource Estimates (11)

indicatedRadio Gold Project · goldTonnes: 200000Grade: 4Grade Unit: g/tContained Metal: 25500Contained Unit: ozView all details
Link to this fact

Identity

Project
Radio Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:cb9709739f556834a36b

Resource Data

Category
indicated
Tonnes
200000
Grade
4
Grade Unit
g/t
Contained Metal
25500
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-06-02

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The indicated resource for the Radio Gold Project is presented as part of an updated JORC MRE, contributing to the overall project economics.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Evidence · table

“4.00”

Context: 200,000

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

inferredRadio Gold Project · goldTonnes: 166000Grade: 4.5Grade Unit: g/tContained Metal: 24100Contained Unit: ozView all details
Link to this fact

Identity

Project
Radio Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:4e2032d17c04a9c4827d

Resource Data

Category
inferred
Tonnes
166000
Grade
4.5
Grade Unit
g/t
Contained Metal
24100
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-06-02

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The inferred resource for the Radio Gold Project is presented as part of an updated JORC MRE, but carries a lower level of geological confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“4.50”

Context: 166,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource category is Inferred, which is a speculative category with limited drilling.

Evidence · table

“Inferred”

Context: 166,000

indicatedButchers Creek Gold Project · goldTonnes: 3580000Grade: 2.24Grade Unit: g/tContained Metal: 258000Contained Unit: ozView all details
Link to this fact

Identity

Project
Butchers Creek Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8ab213eae8d1914db219

Resource Data

Category
indicated
Tonnes
3580000
Grade
2.24
Grade Unit
g/t
Contained Metal
258000
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2025-04-16

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The indicated resource for the Butchers Creek Gold Project is presented as part of a JORC resource update, providing scale and optionality.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Evidence · table

“2.24”

Context: 3.58

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated April 16, 2025.

Evidence · text

“WIN advances Butchers Creek development with resource update” dated 16 April 2025.”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

inferredButchers Creek Gold Project · goldTonnes: 1650000Grade: 1.18Grade Unit: g/tContained Metal: 63000Contained Unit: ozView all details
Link to this fact

Identity

Project
Butchers Creek Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:1184549ac66f798b0cf9

Resource Data

Category
inferred
Tonnes
1650000
Grade
1.18
Grade Unit
g/t
Contained Metal
63000
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2025-04-16

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The inferred resource for the Butchers Creek Gold Project is presented as part of a JORC resource update, but carries a lower level of geological confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“1.18”

Context: 1.65

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated April 16, 2025.

Evidence · text

“WIN advances Butchers Creek development with resource update” dated 16 April 2025.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource category is Inferred, which is a speculative category with limited drilling.

Evidence · table

“Inferred”

Context: 1.65

inferredButchers Creek Gold Project · goldTonnes: 400000Grade: 3.1Grade Unit: g/tContained Metal: 38000Contained Unit: ozView all details
Link to this fact

Identity

Project
Butchers Creek Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:b20f77cb88515a7c8724
Deposit or zone
Golden Crown

Resource Data

Category
inferred
Tonnes
400000
Grade
3.1
Grade Unit
g/t
Contained Metal
38000
Contained Unit
oz
Cutoff Grade
0.8
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2021-06-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The inferred resource for Golden Crown is presented as part of a JORC resource, but is an older estimate and carries a lower level of geological confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“3.10”

Context: 0.40

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated April 16, 2025, which includes this older Golden Crown estimate.

Evidence · text

“WIN advances Butchers Creek development with resource update” dated 16 April 2025.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource category is Inferred, which is a speculative category with limited drilling.

Evidence · table

“Inferred”

Context: 0.40

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 5.4 years before this release

indicatedFaraday Critical Minerals Project · lithiumTonnes: 550000Grade: 0.75Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Faraday Critical Minerals Project
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8895e0d0baf4f5879757
Deposit or zone
Faraday

Resource Data

Category
indicated
Tonnes
550000
Grade
0.75
Grade Unit
% Li2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2023-11-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The indicated resource for the Faraday deposit is presented as part of a JORC MRE, contributing to the critical minerals portfolio.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Evidence · table

“550”

Context: 0.75

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated November 8, 2023.

Evidence · text

“375% Growth in Faraday-Trainline Lithium Mineral Resource” dated 8 November 2023.”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredFaraday Critical Minerals Project · lithiumTonnes: 220000Grade: 0.61Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Faraday Critical Minerals Project
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:47e9d91d0b777852ab13
Deposit or zone
Faraday

Resource Data

Category
inferred
Tonnes
220000
Grade
0.61
Grade Unit
% Li2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2023-11-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The inferred resource for the Faraday deposit is presented as part of a JORC MRE, but carries a lower level of geological confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“220”

Context: 0.61

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated November 8, 2023.

Evidence · text

“375% Growth in Faraday-Trainline Lithium Mineral Resource” dated 8 November 2023.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource category is Inferred, which is a speculative category with limited drilling.

Evidence · table

“220”

Context: 0.61

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

indicatedFaraday Critical Minerals Project · lithiumTonnes: 780000Grade: 0.69Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Faraday Critical Minerals Project
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:87bc8c10e6909e506f74
Deposit or zone
Trainline

Resource Data

Category
indicated
Tonnes
780000
Grade
0.69
Grade Unit
% Li2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2023-11-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The indicated resource for the Trainline deposit is presented as part of a JORC MRE, contributing to the critical minerals portfolio.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Evidence · table

“780”

Context: 0.69

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated November 8, 2023.

Evidence · text

“375% Growth in Faraday-Trainline Lithium Mineral Resource” dated 8 November 2023.”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredFaraday Critical Minerals Project · lithiumTonnes: 160000Grade: 0.63Grade Unit: % Li2OView all details
Link to this fact

Identity

Project
Faraday Critical Minerals Project
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:d2b09f28cc32d69a05ac
Deposit or zone
Trainline

Resource Data

Category
inferred
Tonnes
160000
Grade
0.63
Grade Unit
% Li2O
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2023-11-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The inferred resource for the Trainline deposit is presented as part of a JORC MRE, but carries a lower level of geological confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“160”

Context: 0.63

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated November 8, 2023.

Evidence · text

“375% Growth in Faraday-Trainline Lithium Mineral Resource” dated 8 November 2023.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource category is Inferred, which is a speculative category with limited drilling.

Evidence · table

“160”

Context: 0.63

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

indicatedMt Edwards Nickel Project · nickelTonnes: 5410000Grade: 1.45Grade Unit: %Contained Metal: 174540Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Edwards Nickel Project
Commodity
nickel
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:53693a0dd35fecc7f6f7

Resource Data

Category
indicated
Tonnes
5410000
Grade
1.45
Grade Unit
%
Contained Metal
174540
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% Ni

Prior Estimate

Resource Date
2026-09-28

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The indicated resource for the Mt Edwards Nickel Project is presented as part of a JORC MRE, but the project is currently in care and maintenance.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Care and Maintenance

Evidence · table

“5.41”

Context: 1.45

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated September 28, 2026.

Evidence · text

“estimates of Nickel Mineral Resources for the Mt Edwards Project, and the tenure rationalisation transaction with Astral Resources, has been extracted from the Company’s ASX Announcements titled “$9m of Funding Through Tenure Rationalisation Transaction” dated 28 September 2026”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

inferredMt Edwards Nickel Project · nickelTonnes: 6920000Grade: 1.38Grade Unit: %Contained Metal: 174540Contained Unit: tView all details
Link to this fact

Identity

Project
Mt Edwards Nickel Project
Commodity
nickel
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:f3b0a54b0415aae22342

Resource Data

Category
inferred
Tonnes
6920000
Grade
1.38
Grade Unit
%
Contained Metal
174540
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% Ni

Prior Estimate

Resource Date
2026-09-28

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: The inferred resource for the Mt Edwards Nickel Project is presented as part of a JORC MRE, but the project is in care and maintenance and this category carries lower confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Care and Maintenance

Evidence · table

“6.92”

Context: 1.38

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The resource estimate is from an update dated September 28, 2026.

Evidence · text

“estimates of Nickel Mineral Resources for the Mt Edwards Project, and the tenure rationalisation transaction with Astral Resources, has been extracted from the Company’s ASX Announcements titled “$9m of Funding Through Tenure Rationalisation Transaction” dated 28 September 2026”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource category is Inferred, which is a speculative category with limited drilling.

Evidence · table

“6.92”

Context: 1.38

Metallurgical Results (2)

gravity/leach testworkRadio Gold Project · goldRecovery: 98.6 %View all details
Link to this fact

Identity

Project
Radio Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Test Work

Program Status
detailed
Test Type
gravity/leach testwork
Processing Route
gravity and leach
Grind P80
75 µm
Leach Time
24 hours

Recovery

Recovery
98.6 %
Recovery Basis
actual_test

Lab

Laboratory
Fremantle Metallurgy

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: Exceptional gold recovery rates of 98.6–99.0% were confirmed from gravity/leach testwork, indicating strong metallurgical performance for the Radio Gold Project.

Positive factors

  • High Recovery
  • Mill Route
  • QP/CP Signed

Evidence · text

“98.6–99.0% extraction at P80=75μm in 24-hour gravity/leach testwork”

Tags used in scoring

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

Fact 2Faraday Critical Minerals Project · rubidiumRecovery: 96.7 %View all details
Link to this fact

Identity

Project
Faraday Critical Minerals Project
Commodity
rubidium
Region
australia_wa
Reported Region
Western Australia
Ticker
WIN

Test Work

Program Status
preliminary

Recovery

Recovery
96.7 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-21T00:00:00.000Z

Reasoning: Successful extraction of up to 96.7% rubidium in testwork at the Faraday Critical Minerals Project indicates strong potential for this critical mineral.

Positive factors

  • High Recovery
  • QP/CP Signed

Evidence · text

“Up to 96.7% rubidium extraction in testwork”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.