# WC8: Wildcat Investor Presentation - Mining Forum Americas 2026

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03145882

Publisher: asx

Original announcement: 2026-09-29T23:05:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-09-30T00:22:05.526Z

Atlas analysis updated: 2026-09-30T00:22:05.526Z

- Company: Wildcat Resources Limited

- Ticker: WC8

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Lithium

- Secondary commodities: Tantalum, Iron ore

- Document categories: Resource update, Other

- Extracted: 2026-09-30 00:22:06 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Wildcat Resources presented an update on the Tabba Tabba Lithium Project, highlighting a 74.1 Mt maiden resource at 1.0% Li2O and a 46.3 Mt maiden ore reserve at 0.99% Li2O. The presentation also emphasizes the Bolt Cutter discovery and strong PFS economics with a post-tax NPV8 of ~A$3.2bn at US$1,384/t spodumene.

Reasoning: Investor presentation summarizing existing project status, resource/reserve figures, and PFS economics rather than announcing new results.

- Positive factor: Large maiden resource with high Indicated component

- Positive factor: Strong PFS economics and cash balance

- Positive factor: Significant exploration upside at Bolt Cutter

- Negative factor: Low novelty as it is a re-presentation of existing resource and reserve data

Facts used in scoring: 14

## Classification and evidence

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The presentation explicitly refers to the Tabba Tabba maiden resource.

Evidence · text

> TABBA TABBA - MAIDEN RESOURCE

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource contains a significant Indicated component \(70.0 Mt\).

Evidence · table

> 70.0

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The project has reported maiden ore reserves in the Probable category.

Evidence · table

> 46.3

## Extracted facts

Stored fact records: 14. Some facts used in scoring do not have a stored record.

## Resource Estimates (14)

### Fact 1

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-0)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Headline resource figure for the Tabba Tabba project.

- Positive factor: Large scale resource

Evidence · text

> 74.1Mt @ 1.0% Li2O

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 2

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-1)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Gold resource mention in corporate snapshot.

Evidence · text

> 770,000 oz @ 1.1g/t Au

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 3

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-2)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Indicated lithium grade from the MRE table.

Evidence · table

> 1.01

Context: 70.0

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 4

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-3)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Indicated tantalum grade from the MRE table.

Evidence · table

> 53

Context: 70.0

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 5

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-4)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Indicated iron grade from the MRE table.

Evidence · table

> 0.64

Context: 70.0

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 6

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-5)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Inferred lithium grade from the MRE table.

Evidence · table

> 0.76

Context: 4.1

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 7

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-6)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Inferred tantalum grade from the MRE table.

Evidence · table

> 65

Context: 4.1

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 8

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-7)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Inferred iron grade from the MRE table.

Evidence · table

> 0.88

Context: 4.1

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 9

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-8)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Probable open pit lithium grade from the Ore Reserve table.

Evidence · table

> 1.00

Context: 36.8

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 10

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-9)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Probable open pit tantalum grade from the Ore Reserve table.

Evidence · table

> 62.4

Context: 36.8

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 11

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-10)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Probable open pit iron grade from the Ore Reserve table.

Evidence · table

> 1.06

Context: 36.8

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 12

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-11)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Probable underground lithium grade from the Ore Reserve table.

Evidence · table

> 0.94

Context: 9.5

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 13

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-12)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Probable underground tantalum grade from the Ore Reserve table.

Evidence · table

> 51.9

Context: 9.5

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Fact 14

[Link to this fact](https://atlas-staging.minestarters.com/news/wc8-wildcat-investor-presentation-mining-forum-americas-2026--cc7e53e3-9754-4a83-96f5-cb48db60ab5d#fact-resource-facts-13)

#### Identity

- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: WC8

#### Resource scope

- Reporting standards: jorc
- Mining method: combined
- Ownership percent: 9 %

#### Resource Data

- Cutoff Grade: 0.45
- Cutoff Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Probable underground iron grade from the Ore Reserve table.

Evidence · table

> 0.86

Context: 9.5

#### Tags used in scoring

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
