WAU: Investor Presentation - Australian Gold Conference

Original announcement by asx on

Company
WA Gold Limited
Ticker
WAU
Exchange
ASX
Region
Western Australia
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Other, Drill results, Resource update
Extracted
2026-10-14 00:16:10 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

WA Gold presented its portfolio at the Australian Gold Conference, highlighting the Abercromby Gold Project's 518koz JORC resource and recent high-grade diamond drill intercepts. The company is currently conducting a 7,200m RC resource development program at Abercromby and has identified new SAM anomalies at Bullabulling.

Reasoning: Investor presentation summarizing recent diamond drill results, existing resource, and exploration progress at Abercromby and Bullabulling.

Positive factors

  • Abercromby resource of 518koz Au on granted leases
  • Recent diamond drilling confirmed continuity of eastern lode
  • High-margin scoping study outcomes
  • Bullabulling SAM survey identified new anomalies

Negative factors

  • Abercromby resource is largely Inferred (68%)

Facts used in scoring: 11

Classification and evidence

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The presentation mentions JORC compliance and refers to a Scoping Study prepared in compliance with the JORC Code.

Evidence · text

“The Scoping Study has been prepared in compliance with the JORC Code”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: A significant portion of the Abercromby resource is classified as Inferred.

Evidence · table

“6,966,000”

Context: 1.58

Extracted facts

Stored fact records: 11. Some facts used in scoring do not have a stored record.

Drill Results (1)

26ABDD007Abercromby · goldGrade: 2.9Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
26ABDD007
Project
Abercromby
Commodity
gold
Region
australia_wa
Reported Region
australia_wa
Ticker
WAU

Geometry

Grade
2.9
Grade Unit
g/t
Intercept
6 m
From
312 m
To
318 m
Intercept Depth
312 m

Classification

Sample Type
drill
Group ID
26ABDD007:312-318

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Moderate grade intercept at depth.

Evidence · text

“6m @ 2.90g/t Au from 312m 26ABDD007”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "50km from WAU’s Abercromby Gold Project For personal use only W A G O L D L I M I T E D Investment Summary Abercromby Sc"

Resource Estimates (10)

indicatedAbercromby Gold Project · goldTonnes: 4152000Grade: 1.23Grade Unit: g/tContained Metal: 165000Contained Unit: kozView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:92a82a7cdcec40830061
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
4152000
Grade
1.23
Grade Unit
g/t
Contained Metal
165000
Contained Unit
koz

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Part of the existing JORC resource.

Positive factors

  • Indicated resource component

Evidence · table

“4,152,000”

Context: 1.23

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

inferredAbercromby Gold Project · goldTonnes: 6966000Grade: 1.58Grade Unit: g/tContained Metal: 353000Contained Unit: kozView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:c384c11b18ab2bcaa858
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6966000
Grade
1.58
Grade Unit
g/t
Contained Metal
353000
Contained Unit
koz

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Large inferred portion of the resource.

Positive factors

  • Significant inferred component

Negative factors

  • Inferred resource

Evidence · table

“6,966,000”

Context: 1.58

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

inferredAbercromby Gold Project · goldTonnes: 11117000Grade: 1.45Grade Unit: g/tContained Metal: 518000Contained Unit: kozView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:5fdba38c47f9f28465b9
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
11117000
Grade
1.45
Grade Unit
g/t
Contained Metal
518000
Contained Unit
koz

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Total resource summary.

Positive factors

  • Total resource scale

Evidence · table

“11,117,000”

Context: 1.45

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

indicatedAbercromby Gold Project · goldTonnes: 3858000Grade: 1.18Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fdec034961684836b5d0
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3858000
Grade
1.18
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Part of the existing JORC resource. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource component

Evidence · table

“1.18”

Context: 3,858,000

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

indicatedAbercromby Gold Project · goldTonnes: 294000Grade: 1.94Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:9f7ac7ebaf0b7151f386
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
294000
Grade
1.94
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Part of the existing JORC resource. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource component

Evidence · table

“1.94”

Context: 294,000

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

indicatedAbercromby Gold Project · goldTonnes: 4152000Grade: 1.23Grade Unit: g/tView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:f0a304801d52a13fab66
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
4152000
Grade
1.23
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Part of the existing JORC resource. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource component

Evidence · table

“1.23”

Context: 4,152,000

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

inferredAbercromby Gold Project · goldTonnes: 5565000Grade: 1.16Grade Unit: g/tView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:d893c07c9ab1fcb5a1df
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
5565000
Grade
1.16
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Large inferred portion of the resource. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Significant inferred component

Negative factors

  • Inferred resource

Evidence · table

“1.16”

Context: 5,565,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

inferredAbercromby Gold Project · goldTonnes: 1401000Grade: 3.24Grade Unit: g/tView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:e45bf4f85d71aa877e4e
Deposit or zone
Abercromby
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1401000
Grade
3.24
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Large inferred portion of the resource. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Significant inferred component

Negative factors

  • Inferred resource

Evidence · table

“3.24”

Context: 1,401,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

inferredAbercromby Gold Project · goldTonnes: 6966000Grade: 1.58Grade Unit: g/tView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:9df83614419d1a744ad1
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6966000
Grade
1.58
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Large inferred portion of the resource. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Significant inferred component

Negative factors

  • Inferred resource

Evidence · table

“1.58”

Context: 6,966,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

inferredAbercromby Gold Project · goldTonnes: 11117000Grade: 1.45Grade Unit: g/tView all details
Link to this fact

Identity

Project
Abercromby Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
WAU

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:64bf9ff2d61424b825e2
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
11117000
Grade
1.45
Grade Unit
g/t

Prior Estimate

Resource Date
2023-04-17

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Total resource summary. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Total resource scale

Evidence · table

“1.45”

Context: 11,117,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.5 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.