VIZSLA COPPER INTERSECTS HIGH-GRADE SILVER AND GOLD MINERALIZATION AT THE PALMER PROJECT, SOUTHEAST ALASKA
Original announcement by cnw on
- Company
- Vizsla Copper Corp.
- Ticker
- VCU
- Exchange
- Unavailable
- Region
- Southeast Alaska
- Primary commodity
- Silver
- Secondary commodities
- Gold, Zinc, Copper, Lead
- Document categories
- Drill results, Resource update
- Extracted
- 2026-10-01 13:58:38 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Vizsla Copper has reported high-grade silver, gold, and zinc intercepts from drill hole CMR26-213 at the AG deposit within the Palmer Project in Alaska. The results include an exceptional 6.1m interval grading 320.2 g/t silver and 2.48 g/t gold, supporting the project's VMS geological model.
Reasoning: The release reports high-grade silver and gold intercepts at the AG deposit, including a bonanza-grade silver interval, which supports the existing geological model and provides significant new data for the infill program.
Positive factors
- exceptional silver grades
- strong gold grades
- infill drilling confirming high-grade zones
- QA/QC disclosed
Negative factors
- assays for two holes still pending
Facts used in scoring: 30
Classification and evidence
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: The 6.1m interval at 320.2 g/t silver and 4.8 g/t gold is exceptionally high grade.
Evidence · text
“992 g/t silver and 4.8 g/t gold from 135.5 to 136.1 meters”
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: The release details sampling, analytical methods, and QA/QC protocols including blanks and standards.
Evidence · text
“The Company maintains a robust QA/QC program that includes the collection and analysis of duplicate samples and the insertion of blanks and standards”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The AG deposit is stated as an Inferred Mineral Resource.
Evidence · text
“The AG deposit hosts an Inferred Mineral Resource”
Extracted facts
Stored fact records: 30. Some facts used in scoring do not have a stored record.
Drill Results (25)
CMR26-213Palmer · zincGrade: 1.6Grade Unit: %Intercept: 30.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- zinc
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 1.6
- Grade Unit
- %
- Intercept
- 30.6 m
- From
- 134.3 m
- To
- 164.9 m
- Intercept Depth
- 134.3 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:134.3-164.9
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.96
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Standard zinc grade for a VMS deposit.
Evidence · table
“1.60”
Context: 30.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · copperGrade: 0.05Grade Unit: %Intercept: 30.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- copper
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.05
- Grade Unit
- %
- Intercept
- 30.6 m
- From
- 134.3 m
- To
- 164.9 m
- Intercept Depth
- 134.3 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:134.3-164.9
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.96
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Trace copper grade.
Evidence · table
“0.05”
Context: 30.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · leadGrade: 0.47Grade Unit: %Intercept: 30.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- lead
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.47
- Grade Unit
- %
- Intercept
- 30.6 m
- From
- 134.3 m
- To
- 164.9 m
- Intercept Depth
- 134.3 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:134.3-164.9
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.96
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Trace lead grade.
Evidence · table
“0.47”
Context: 30.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · silverGrade: 96.6Grade Unit: g/tIntercept: 30.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- silver
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 96.6
- Grade Unit
- g/t
- Intercept
- 30.6 m
- From
- 134.3 m
- To
- 164.9 m
- Intercept Depth
- 134.3 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:134.3-164.9
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.96
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Solid silver grade for this deposit type.
Evidence · table
“96.6”
Context: 30.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · goldGrade: 0.92Grade Unit: g/tIntercept: 30.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- gold
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.92
- Grade Unit
- g/t
- Intercept
- 30.6 m
- From
- 134.3 m
- To
- 164.9 m
- Intercept Depth
- 134.3 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:134.3-164.9
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.96
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Strong gold grade for a VMS deposit.
Evidence · table
“0.92”
Context: 30.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · silverGrade: 255.3Grade Unit: g/tIntercept: 10.4 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- silver
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 255.3
- Grade Unit
- g/t
- Intercept
- 10.4 m
- From
- 135.1 m
- To
- 145.5 m
- Intercept Depth
- 135.1 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.1-145.5
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 6.91
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: High-grade silver intercept.
Evidence · table
“255.3”
Context: 10.4
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · zincGrade: 2.49Grade Unit: %Intercept: 10.4 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- zinc
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 2.49
- Grade Unit
- %
- Intercept
- 10.4 m
- From
- 135.1 m
- To
- 145.5 m
- Intercept Depth
- 135.1 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.1-145.5
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 6.91
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Strong zinc grade.
Evidence · table
“2.49”
Context: 10.4
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · silverGrade: 320.2Grade Unit: g/tIntercept: 6.1 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- silver
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 320.2
- Grade Unit
- g/t
- Intercept
- 6.1 m
- From
- 135.5 m
- To
- 141.6 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-141.6
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 8.02
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Exceptional silver grade.
Positive factors
- Bonanza Intercept
Evidence · table
“320.2”
Context: 6.1
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · zincGrade: 2.63Grade Unit: %Intercept: 6.1 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- zinc
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 2.63
- Grade Unit
- %
- Intercept
- 6.1 m
- From
- 135.5 m
- To
- 141.6 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-141.6
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 8.02
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Strong zinc grade.
Evidence · table
“2.63”
Context: 6.1
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · silverGrade: 992Grade Unit: g/tIntercept: 0.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- silver
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 992
- Grade Unit
- g/t
- Intercept
- 0.6 m
- From
- 135.5 m
- To
- 136.1 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-136.1
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 20.07
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Extremely high silver grade.
Positive factors
- Bonanza Intercept
Evidence · table
“992.0”
Context: 0.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · goldGrade: 4.77Grade Unit: g/tIntercept: 0.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- gold
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 4.77
- Grade Unit
- g/t
- Intercept
- 0.6 m
- From
- 135.5 m
- To
- 136.1 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-136.1
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 20.07
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Exceptional gold grade for this deposit type.
Positive factors
- Bonanza Intercept
Evidence · table
“4.77”
Context: 0.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · silverGrade: 12.7Grade Unit: g/tIntercept: 4.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- silver
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 12.7
- Grade Unit
- g/t
- Intercept
- 4.6 m
- From
- 229.2 m
- To
- 233.8 m
- Intercept Depth
- 229.2 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:229.2-233.8
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.43
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Low grade silver intercept.
Evidence · table
“12.7”
Context: 4.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · zincGrade: 4.52Grade Unit: %Intercept: 4.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- zinc
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 4.52
- Grade Unit
- %
- Intercept
- 4.6 m
- From
- 229.2 m
- To
- 233.8 m
- Intercept Depth
- 229.2 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:229.2-233.8
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.43
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Strong zinc grade.
Evidence · table
“4.52”
Context: 4.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · goldGrade: 0.07Grade Unit: g/tIntercept: 4.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- gold
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.07
- Grade Unit
- g/t
- Intercept
- 4.6 m
- From
- 229.2 m
- To
- 233.8 m
- Intercept Depth
- 229.2 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:229.2-233.8
- Mining Method
- underground
Location
- Loc. Confidence
- high
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.43
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Low gold grade.
Evidence · table
“0.07”
Context: 4.6
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · copperGrade: 0.06Grade Unit: %Intercept: 10.4 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- copper
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.06
- Grade Unit
- %
- Intercept
- 10.4 m
- From
- 135.1 m
- To
- 145.5 m
- Intercept Depth
- 135.1 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.1-145.5
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 6.91
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 0.06 % copper is below against the default band [2.5, 1, 0.5, 0.25] %. Grade×width 0.6 %·m is below.
Negative factors
- 0.06 % copper is below the weak threshold (0.25 %) on the default band.
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“0.06”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · leadGrade: 1.15Grade Unit: %Intercept: 10.4 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- lead
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 1.15
- Grade Unit
- %
- Intercept
- 10.4 m
- From
- 135.1 m
- To
- 145.5 m
- Intercept Depth
- 135.1 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.1-145.5
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 6.91
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 1.15 % lead is weak against the default band [10, 6, 3, 1] %. Grade×width 12.0 %·m is weak.
Negative factors
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“1.15”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · goldGrade: 2.39Grade Unit: g/tIntercept: 10.4 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- gold
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 2.39
- Grade Unit
- g/t
- Intercept
- 10.4 m
- From
- 135.1 m
- To
- 145.5 m
- Intercept Depth
- 135.1 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.1-145.5
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 6.91
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 2.39 g/t gold is weak against the underground mining band [15, 7, 4, 2.5] g/t. Grade×width 24.9 g/t·m is weak (grade alone is below; the better of the two is used).
Negative factors
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“2.39”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · copperGrade: 0.06Grade Unit: %Intercept: 6.1 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- copper
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.06
- Grade Unit
- %
- Intercept
- 6.1 m
- From
- 135.5 m
- To
- 141.6 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-141.6
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 8.02
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 0.06 % copper is below against the default band [2.5, 1, 0.5, 0.25] %. Grade×width 0.4 %·m is below.
Negative factors
- 0.06 % copper is below the weak threshold (0.25 %) on the default band.
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“0.06”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · leadGrade: 1.42Grade Unit: %Intercept: 6.1 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- lead
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 1.42
- Grade Unit
- %
- Intercept
- 6.1 m
- From
- 135.5 m
- To
- 141.6 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-141.6
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 8.02
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 1.42 % lead is weak against the default band [10, 6, 3, 1] %. Grade×width 8.7 %·m is below (grade alone is weak; the better of the two is used).
Negative factors
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“1.42”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · goldGrade: 2.48Grade Unit: g/tIntercept: 6.1 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- gold
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 2.48
- Grade Unit
- g/t
- Intercept
- 6.1 m
- From
- 135.5 m
- To
- 141.6 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-141.6
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 8.02
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 2.48 g/t gold is weak against the underground mining band [15, 7, 4, 2.5] g/t. Grade×width 15.1 g/t·m is weak (grade alone is below; the better of the two is used).
Negative factors
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“2.48”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · copperGrade: 0.18Grade Unit: %Intercept: 0.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- copper
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.18
- Grade Unit
- %
- Intercept
- 0.6 m
- From
- 135.5 m
- To
- 136.1 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-136.1
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 20.07
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 0.18 % copper is below against the default band [2.5, 1, 0.5, 0.25] %. Grade×width 0.1 %·m is below.
Negative factors
- 0.18 % copper is below the weak threshold (0.25 %) on the default band.
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“0.18”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · zincGrade: 3.79Grade Unit: %Intercept: 0.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- zinc
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 3.79
- Grade Unit
- %
- Intercept
- 0.6 m
- From
- 135.5 m
- To
- 136.1 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-136.1
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 20.07
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 3.79 % zinc is weak against the default band [18, 10, 5, 2] %. Grade×width 2.3 %·m is below (grade alone is weak; the better of the two is used).
Negative factors
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“3.79”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · leadGrade: 1.67Grade Unit: %Intercept: 0.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- lead
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 1.67
- Grade Unit
- %
- Intercept
- 0.6 m
- From
- 135.5 m
- To
- 136.1 m
- Intercept Depth
- 135.5 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:135.5-136.1
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 20.07
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 1.67 % lead is weak against the default band [10, 6, 3, 1] %. Grade×width 1.0 %·m is below (grade alone is weak; the better of the two is used).
Negative factors
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“1.67”
Context: Including
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · copperGrade: 0.13Grade Unit: %Intercept: 4.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- copper
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.13
- Grade Unit
- %
- Intercept
- 4.6 m
- From
- 229.2 m
- To
- 233.8 m
- Intercept Depth
- 229.2 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:229.2-233.8
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.43
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 0.13 % copper is below against the default band [2.5, 1, 0.5, 0.25] %. Grade×width 0.6 %·m is below.
Negative factors
- 0.13 % copper is below the weak threshold (0.25 %) on the default band.
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“0.13”
Context: CMR26-213
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
CMR26-213Palmer · leadGrade: 0.1Grade Unit: %Intercept: 4.6 mView all detailsHide details
Identity
- Hole ID
- CMR26-213
- Project
- Palmer
- Commodity
- lead
- Region
- usa_ak
- Reported Region
- usa_ak
- Ticker
- VCU
Geometry
- Grade
- 0.1
- Grade Unit
- %
- Intercept
- 4.6 m
- From
- 229.2 m
- To
- 233.8 m
- Intercept Depth
- 229.2 m
Classification
- Sample Type
- drill
- Group ID
- CMR26-213:229.2-233.8
- Mining Method
- underground
QA/QC
- Laboratory
- ALS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Metal Equivalent
- Metal Eq. Grade
- 2.43
- Metal Eq. Unit
- % Cu-Eq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Expanded from assay table. 0.1 % lead is below against the default band [10, 6, 3, 1] %. Grade×width 0.5 %·m is below.
Negative factors
- 0.1 % lead is below the weak threshold (1 %) on the default band.
- Scored from rubric bands during table expansion, not from document context.
Evidence · table
“0.10”
Context: CMR26-213
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Resource Estimates (5)
inferredcopperTonnes: 5350000Grade: 0.15Grade Unit: %View all detailsHide details
Identity
- Commodity
- copper
- Region
- usa_ak
- Reported Region
- Southeast Alaska
- Ticker
- VCU
Resource scope
- Estimate type
- resource
- Effective date
- 2025-01-13T00:00:00.000Z
- Reporting standards
- ni_43_101
- Resource group id
- resource:b1c48d5c565da1cd4990
- Deposit or zone
- AG Deposit
- Material type
- sulphide
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 5350000
- Grade
- 0.15
- Grade Unit
- %
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Resource baseline.
Evidence · text
“5.35 million tonnes grading 0.15% copper”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredzincTonnes: 5350000Grade: 3.88Grade Unit: %View all detailsHide details
Identity
- Commodity
- zinc
- Region
- usa_ak
- Reported Region
- Southeast Alaska
- Ticker
- VCU
Resource scope
- Estimate type
- resource
- Effective date
- 2025-01-13T00:00:00.000Z
- Reporting standards
- ni_43_101
- Resource group id
- resource:b1c48d5c565da1cd4990
- Deposit or zone
- AG Deposit
- Material type
- sulphide
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 5350000
- Grade
- 3.88
- Grade Unit
- %
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Resource baseline.
Evidence · text
“3.88% zinc”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredleadTonnes: 5350000Grade: 0.8Grade Unit: %View all detailsHide details
Identity
- Commodity
- lead
- Region
- usa_ak
- Reported Region
- Southeast Alaska
- Ticker
- VCU
Resource scope
- Estimate type
- resource
- Effective date
- 2025-01-13T00:00:00.000Z
- Reporting standards
- ni_43_101
- Resource group id
- resource:b1c48d5c565da1cd4990
- Deposit or zone
- AG Deposit
- Material type
- sulphide
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 5350000
- Grade
- 0.8
- Grade Unit
- %
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Resource baseline.
Evidence · text
“0.80% lead”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredsilverTonnes: 5350000Grade: 110.6Grade Unit: g/tView all detailsHide details
Identity
- Commodity
- silver
- Region
- usa_ak
- Reported Region
- Southeast Alaska
- Ticker
- VCU
Resource scope
- Estimate type
- resource
- Effective date
- 2025-01-13T00:00:00.000Z
- Reporting standards
- ni_43_101
- Resource group id
- resource:b1c48d5c565da1cd4990
- Deposit or zone
- AG Deposit
- Material type
- sulphide
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 5350000
- Grade
- 110.6
- Grade Unit
- g/t
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Reasoning: Resource baseline.
Evidence · text
“110.6 g/t silver”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredgoldTonnes: 5350000Grade: 0.41Grade Unit: g/tView all detailsHide details
Identity
- Commodity
- gold
- Region
- usa_ak
- Reported Region
- Southeast Alaska
- Ticker
- VCU
Resource scope
- Estimate type
- resource
- Effective date
- 2025-01-13T00:00:00.000Z
- Reporting standards
- ni_43_101
- Resource group id
- resource:b1c48d5c565da1cd4990
- Deposit or zone
- AG Deposit
- Material type
- sulphide
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 5350000
- Grade
- 0.41
- Grade Unit
- g/t
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-01T00:00:00.000Z
Evidence · text
“0.41 g/t gold”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.