Unaudited Interim Results

Original announcement by lse on

Company
Kavango Resources PLC
Ticker
KAV
Exchange
LSE
Region
Zimbabwe
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Resource update, Metallurgy, Other
Extracted
2026-09-23 08:35:54 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Kavango Resources PLC announced unaudited interim results for H1 2026, reporting a significant reduction in operating loss and increased revenue. Operational highlights include maiden JORC-compliant Mineral Resource Estimates for the Bill's Luck and Nightshift gold mines in Zimbabwe, totaling 33,900 oz and 19,000 oz of gold respectively. Metallurgical test work for Hillside ore samples indicated high gold recoveries of 90-93%, supporting the commissioning of a 50 tpd CIL plant.

Reasoning: The company reported maiden JORC-compliant gold resource estimates for two projects and positive metallurgical test work results, alongside improved financial performance with reduced losses and successful fundraises.

Positive factors

  • Maiden Mineral Resource Estimates
  • JORC Compliant Reporting
  • High Gold Recoveries
  • Reduced Operating Losses
  • Successful Equity Raises
  • QP/CP Signed

Negative factors

  • Continued Net Loss
  • Material Uncertainty Regarding Future Funding
  • High Gold Price Assumption for Resource Estimates
  • Significant Inferred Component in MREs

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 6

Classification and evidence

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The Bill's Luck Mineral Resource Estimate is the Company's maiden Mineral Resource Estimate for the deposit.

Evidence · text

“These results directly underpinned the maiden JORC Mineral Resource Estimate for Bill's Luck. The Bill's Luck Mineral Resource Estimate set out below is the Company's maiden Mineral Resource Estimate for the deposit”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Bill's Luck Mineral Resource Estimate is reported in accordance with the JORC Code (2012 Edition).

Evidence · text

“The Bill's Luck Mineral Resource Estimate set out below is the Company's maiden Mineral Resource Estimate for the deposit and is reported in accordance with the JORC Code (2012 Edition).”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Competent Person responsible for the Bill's Luck Mineral Resource Estimate was Mr Stephen John Savage of S. J. Savage Consulting CC.

Evidence · text

“The Competent Person responsible for the Mineral Resource Estimate in that announcement was Mr Stephen John Savage of S. J. Savage Consulting CC.”

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The Bill's Luck MRE includes a Measured category of 24,000 tonnes at 3.30 g/t Au.

Evidence · table

“Measured”

Context: 24,000

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Bill's Luck MRE includes an Indicated category of 154,000 tonnes at 2.70 g/t Au.

Evidence · table

“Indicated”

Context: 154,000

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Bill's Luck MRE includes an Inferred category of 215,000 tonnes at 2.60 g/t Au.

Evidence · table

“Inferred”

Context: 215,000

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: Resources for Bill's Luck are reported at a cut-off grade of 0.5 g/t.

Evidence · text

“Resources are reported at a cut-off grade of 0.5 g/t”

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The Nightshift Mineral Resource Estimate is the Company's maiden Mineral Resource Estimate for the deposit.

Evidence · text

“The Nightshift Mineral Resource Estimate set out below is the Company's maiden Mineral Resource Estimate for the deposit”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Nightshift Mineral Resource Estimate is reported in accordance with the JORC Code (2012 Edition).

Evidence · text

“The Nightshift Mineral Resource Estimate set out below is the Company's maiden Mineral Resource Estimate for the deposit and is reported in accordance with the JORC Code (2012 Edition).”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Competent Person responsible for the Nightshift Mineral Resource Estimate was Mr Stephen John Savage of S. J. Savage Consulting CC.

Evidence · text

“The Competent Persons responsible for the information in that announcement were: Mr Stephen John Savage of S. J. Savage Consulting CC, in respect of the Mineral Resource Estimate”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Nightshift MRE includes an Indicated category of 421,000 tonnes at 0.78 g/t Au.

Evidence · table

“Indicated”

Context: 421,000

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Nightshift MRE includes an Inferred category of 273,000 tonnes at 0.98 g/t Au.

Evidence · table

“Inferred”

Context: 273,000

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: Resources for Nightshift are reported at a cut-off grade of 0.5 g/t.

Evidence · text

“Resources are reported at a cut-off grade of 0.5 g/t”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Metallurgical test work indicated expected operating recoveries of approximately 90 – 93% for gold.

Evidence · text

“Test work indicated expected operating recoveries of approximately 90 – 93%.”

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: The 50 tonnes-per-day proof of concept carbon-in-leach gold processing plant has commenced commissioning.

Evidence · text

“Commissioning commenced at Hillside following successful processing plant installation”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The metallurgical test work is for a carbon-in-leach gold processing plant.

Evidence · text

“carbon-in-leach gold processing plant”

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Resource Estimates (5)

measuredHillside Gold Project · goldTonnes: 24000Grade: 3.3Grade Unit: g/tContained Metal: 2600Contained Unit: ozView all details
Link to this fact

Identity

Project
Hillside Gold Project
Commodity
gold
Region
zimbabwe
Reported Region
Zimbabwe
Ticker
KAV

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Stephen John Savage
Resource group id
resource:1394c12326769ce56a68
Deposit or zone
Bill's Luck Gold Mine
Mining method
combined

Resource Data

Category
measured
Tonnes
24000
Grade
3.3
Grade Unit
g/t
Contained Metal
2600
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-01-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Highest confidence category (Measured) for a maiden resource estimate, providing a strong foundation for the project, though based on a high gold price assumption.

Positive factors

  • Measured Resource
  • Maiden Resource
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • High Gold Price Assumption for Resource Estimates

Evidence · table

“24,000”

Context: Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedHillside Gold Project · goldTonnes: 154000Grade: 2.7Grade Unit: g/tContained Metal: 13400Contained Unit: ozView all details
Link to this fact

Identity

Project
Hillside Gold Project
Commodity
gold
Region
zimbabwe
Reported Region
Zimbabwe
Ticker
KAV

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Stephen John Savage
Resource group id
resource:ac02d4fa2b79258df3b5
Deposit or zone
Bill's Luck Gold Mine
Mining method
combined

Resource Data

Category
indicated
Tonnes
154000
Grade
2.7
Grade Unit
g/t
Contained Metal
13400
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-01-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Good confidence category (Indicated) for a maiden resource estimate, contributing significantly to the overall resource, but based on a high gold price assumption.

Positive factors

  • Indicated Resource
  • Maiden Resource
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • High Gold Price Assumption for Resource Estimates

Evidence · table

“154,000”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredHillside Gold Project · goldTonnes: 215000Grade: 2.6Grade Unit: g/tContained Metal: 18000Contained Unit: ozView all details
Link to this fact

Identity

Project
Hillside Gold Project
Commodity
gold
Region
zimbabwe
Reported Region
Zimbabwe
Ticker
KAV

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Stephen John Savage
Resource group id
resource:0ba1eb4fdc6252e9c5e2
Deposit or zone
Bill's Luck Gold Mine
Mining method
combined

Resource Data

Category
inferred
Tonnes
215000
Grade
2.6
Grade Unit
g/t
Contained Metal
18000
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-01-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Lowest confidence category (Inferred) for a maiden resource estimate, representing a significant portion of the total resource, and based on a high gold price assumption.

Positive factors

  • Maiden Resource
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • High Gold Price Assumption for Resource Estimates

Evidence · table

“215,000”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedHillside Gold Project · goldTonnes: 421000Grade: 0.78Grade Unit: g/tContained Metal: 11000Contained Unit: ozView all details
Link to this fact

Identity

Project
Hillside Gold Project
Commodity
gold
Region
zimbabwe
Reported Region
Zimbabwe
Ticker
KAV

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Stephen John Savage
Resource group id
resource:952c215a39b0ecdc8edb
Deposit or zone
Nightshift
Mining method
combined

Resource Data

Category
indicated
Tonnes
421000
Grade
0.78
Grade Unit
g/t
Contained Metal
11000
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2025-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Good confidence category (Indicated) for a maiden resource estimate, though with a lower grade than Bill's Luck, and based on a high gold price assumption.

Positive factors

  • Indicated Resource
  • Maiden Resource
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • High Gold Price Assumption for Resource Estimates

Evidence · table

“421,000”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredHillside Gold Project · goldTonnes: 273000Grade: 0.98Grade Unit: g/tContained Metal: 9000Contained Unit: ozView all details
Link to this fact

Identity

Project
Hillside Gold Project
Commodity
gold
Region
zimbabwe
Reported Region
Zimbabwe
Ticker
KAV

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Stephen John Savage
Resource group id
resource:693100e2e5874255c7cd
Deposit or zone
Nightshift
Mining method
combined

Resource Data

Category
inferred
Tonnes
273000
Grade
0.98
Grade Unit
g/t
Contained Metal
9000
Contained Unit
oz
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2025-09-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Lowest confidence category (Inferred) for a maiden resource estimate, with lower grade, and based on a high gold price assumption.

Positive factors

  • Maiden Resource
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • High Gold Price Assumption for Resource Estimates

Evidence · table

“273,000”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Metallurgical Results (1)

carbon-in-leachHillside Gold Project · goldRecovery: 90 %View all details
Link to this fact

Identity

Project
Hillside Gold Project
Commodity
gold
Region
zimbabwe
Reported Region
Zimbabwe
Ticker
KAV

Test Work

Program Status
detailed
Test Type
carbon-in-leach
Processing Route
carbon-in-leach gold processing plant
Sample
multiple Hillside ore samples

Recovery

Recovery
90 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-23T00:00:00.000Z

Reasoning: Metallurgical test work indicated high expected operating recoveries of 90-93% for gold using a carbon-in-leach plant, which is a key input for plant design and future upgrades.

Positive factors

  • High Recovery
  • Pilot Scale Complete
  • Mill Route

Evidence · text

“Test work indicated expected operating recoveries of approximately 90 – 93%. This test work is a key input for the 50 tonnes-per-day proof of concept carbon-in-leach gold processing plant”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.