Total Metals Completes 25 Hole, 8,408 metre Exploration Drilling Program on its Electrolode Critical Minerals Project

Original announcement by tmx on

Company
Total Metals Corp.
Ticker
TT
Exchange
TSX
Region
Northwestern Ontario
Primary commodity
Zinc
Secondary commodities
Copper, Gold, Silver
Document categories
Drill results, Resource update
Extracted
2026-08-20 23:22:24 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Total Metals Corp. has completed a 25-hole, 8,408-meter exploration drilling program at its Electrolode Critical Minerals Project in Northwestern Ontario, targeting VMS deposits. The company anticipates reporting assay results in the coming weeks. Additionally, Total Metals issued a correction to a previous news release, clarifying the unit of measurement for copper grade in a historical resource estimate for the Pick Lake Deposit.

Reasoning: Total Metals has completed a significant exploration drilling program, which is a positive step for the project, although assay results are pending. The resource update is a correction to a prior release, clarifying units for a historical estimate, which is neutral to slightly positive for transparency but not new information.

Positive factors

  • completion_of_exploration_drilling_program
  • highly_targeted_first_pass_drilling
  • correction_of_prior_error_in_resource_reporting

Negative factors

  • no_assay_results_yet_for_drilling
  • resource_estimate_is_historical_and_not_new

Facts used in scoring: 34

Atlas analysis — Total Metals Corp.: Total Metals Completes 25 Hole, 8,408 metre Exploration Drilling Program on its Electrolode Critical Minerals Project

Classification and evidence

Exploration Drillingpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The document announces the completion of a 25-hole, 8,408-meter exploration drilling program on the Electrolode Critical Minerals Project.

Evidence · text

“Total Metals Completes 25 Hole, 8,408 metre Exploration Drilling Program on its Electrolode Critical Minerals Project”

No Assay Resultsnegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The document states that drill core is at the lab and assay results are anticipated in the coming weeks, indicating no results are available in this release.

Evidence · text

“The drill core is currently at the lab being processed, we anticipate reporting the highly anticipated assay results in the coming weeks.”

Historical Estimate Onlynegative

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The resource estimate for the Pick Lake Deposit has an effective date of October 15, 2020, and is presented as a correction to a prior news release, not a new estimate.

Evidence · text

“Mineral Resources were estimated and reported with an effective date of October 15, 2020”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document includes a correction to a previously reported mineral resource estimate, clarifying grade units.

Evidence · text

“Correction to News Release dated April 16, 2026 The Company wishes to correct the Cu Grade (g/t) unit of measurement listed in its April 16, 2026 news release.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Robert Penczak, M.Sc., P.Geo (Ontario), Vice President of Exploration for the Company, is named as a Qualified Person who reviewed and approved the scientific and technical information.

Evidence · text

“Robert Penczak, M.Sc., P.Geo (Ontario), Vice President of Exploration for the Company and a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the scientific and technical information used in this news release.”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The historical mineral resource estimate for Pick Lake Deposit explicitly states a 3% Zn lower cut-off.

Evidence · text

“using 3% Zn as a lower cut-off”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The Qualified Person for the release is defined by National Instrument 43-101, implying the resource estimate adheres to this standard.

Evidence · text

“Qualified Person as defined by National Instrument 43-101”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Pick Lake Deposit resource includes an Inferred category, which is a speculative category with lower geological confidence.

Evidence · table

“Inferred”

Context: 0.27

Extracted facts

Stored fact records: 34. Some facts used in scoring do not have a stored record.

Drill Results (34)

EL-26-002Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-002
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
405 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512588
Northing
5649252
CRS
UTM
Elevation
402.5 m
Azimuth
135 °
Dip
-70 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-002”

Context: 405.00

EL-26-003Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-003
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
12 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512588
Northing
5649253
CRS
UTM
Elevation
402.6 m
Azimuth
134 °
Dip
-64 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-003”

Context: 12.00

EL-26-003AElectrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-003A
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
387 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512589
Northing
5649252
CRS
UTM
Elevation
402.6 m
Azimuth
134 °
Dip
-64 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-003A”

Context: 387.00

EL-26-004Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-004
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
411 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512531
Northing
5649226
CRS
UTM
Elevation
402.1 m
Azimuth
133 °
Dip
-66 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-004”

Context: 411.00

EL-26-005Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-005
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
120 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512828
Northing
5649207
CRS
UTM
Elevation
401 m
Azimuth
139 °
Dip
-50 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-005”

Context: 120.00

EL-26-006Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-006
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
456 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512426
Northing
5649233
CRS
UTM
Elevation
401.8 m
Azimuth
138 °
Dip
-65 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-006”

Context: 456.00

EL-26-007Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-007
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
267 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512827
Northing
5649206
CRS
UTM
Elevation
401 m
Azimuth
185 °
Dip
-64 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-007”

Context: 267.00

EL-26-008AElectrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-008A
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
165 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512896
Northing
5649292
CRS
UTM
Elevation
401 m
Azimuth
131 °
Dip
-53 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-008A”

Context: 165.00

EL-26-009Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-009
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
138 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
512896
Northing
5649293
CRS
UTM
Elevation
401.1 m
Azimuth
131 °
Dip
-62 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-009”

Context: 138.00

EL-26-010Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-010
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
132 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
513087
Northing
5649415
CRS
UTM
Elevation
400.8 m
Azimuth
140 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-010”

Context: 132.00

EL-26-013Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-013
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
516 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
508096
Northing
5645799
CRS
UTM
Elevation
390.9 m
Azimuth
154 °
Dip
-62 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-013”

Context: 516.00

EL-26-016Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-016
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
513.44 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
508157
Northing
5645850
CRS
UTM
Elevation
392.5 m
Azimuth
152 °
Dip
-59 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-016”

Context: 513.44

EL-26-019Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-019
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
528 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
508212
Northing
5645866
CRS
UTM
Elevation
390.3 m
Azimuth
158 °
Dip
-65 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-019”

Context: 528.00

EL-26-023Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-023
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
129 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
508308
Northing
5645873
CRS
UTM
Elevation
390.3 m
Azimuth
153 °
Dip
-67 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-023”

Context: 129.00

EL-26-024Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-024
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
458 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
508309
Northing
5645874
CRS
UTM
Elevation
390.6 m
Azimuth
139 °
Dip
-66 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-024”

Context: 458.00

EL-26-001Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-001
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
489 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
513131
Northing
5649164
CRS
UTM
Elevation
401 m
Azimuth
95 °
Dip
-50 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-001”

Context: 489.00

EL-26-011Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-011
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
345 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
507499
Northing
5645662
CRS
UTM
Elevation
390.2 m
Azimuth
149 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-011”

Context: 345.00

EL-26-012Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-012
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
345 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
507100
Northing
5645462
CRS
UTM
Elevation
391.5 m
Azimuth
153 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-012”

Context: 345.00

EL-26-014Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-014
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
450 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
507302
Northing
5645601
CRS
UTM
Elevation
387.8 m
Azimuth
195 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-014”

Context: 450.00

EL-26-015Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-015
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
336 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
507109
Northing
5645018
CRS
UTM
Elevation
383.7 m
Azimuth
145 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-015”

Context: 336.00

EL-26-017Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-017
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
303 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
508207
Northing
5646570
CRS
UTM
Elevation
403.2 m
Azimuth
295 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-017”

Context: 303.00

EL-26-018Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-018
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
390 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
510459
Northing
5647966
CRS
UTM
Elevation
402.1 m
Azimuth
155 °
Dip
-63 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-018”

Context: 390.00

EL-26-020Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-020
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
318 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
510747
Northing
5648113
CRS
UTM
Elevation
400.3 m
Azimuth
135 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-020”

Context: 318.00

EL-26-021Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-021
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
201 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
510834
Northing
5647965
CRS
UTM
Elevation
396.4 m
Azimuth
135 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-021”

Context: 201.00

EL-26-022Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-022
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
354 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
510949
Northing
5648280
CRS
UTM
Elevation
404.3 m
Azimuth
131 °
Dip
-45 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-022”

Context: 354.00

EL-26-025Electrolode Critical Minerals PropertyView all details
Link to this fact

Identity

Hole ID
EL-26-025
Project
Electrolode Critical Minerals Property
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Hole Depth
240 m

Classification

Program
exploration
Sample Type
drill

Location

Easting
511606
Northing
5648579
CRS
UTM
Elevation
401.2 m
Azimuth
142 °
Dip
-50 °
Loc. Confidence
high

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This fact represents the completion of a drill hole as part of an exploration program, but no assay results are available yet for interpretation.

Positive factors

  • drilling_completed

Negative factors

  • no_assay_results_yet

Evidence · table

“EL-26-025”

Context: 240.00

Fact 27Pick Lake · zincGrade: 19.2Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
zinc
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
19.2
Grade Unit
%

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a high-grade historical Indicated zinc resource, but it is not new information and is presented as a correction to a prior release.

Positive factors

  • high_grade_zinc
  • cut_off_disclosed

Negative factors

  • historical_estimate_only

Evidence · table

“19.2”

Context: 1.78

Fact 28Pick Lake · copperGrade: 0.9Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
copper
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
0.9
Grade Unit
%

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a historical Indicated copper resource, but it is not new information and is presented as a correction to a prior release.

Positive factors

  • cut_off_disclosed

Negative factors

  • historical_estimate_only

Evidence · table

“0.9”

Context: 1.78

Fact 29Pick Lake · goldGrade: 0.3Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
gold
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
0.3
Grade Unit
g/t

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a historical Indicated gold resource, but it is not new information and is presented as a correction to a prior release.

Positive factors

  • cut_off_disclosed

Negative factors

  • historical_estimate_only

Evidence · table

“0.3”

Context: 1.78

Fact 30Pick Lake · silverGrade: 36.1Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
silver
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
36.1
Grade Unit
g/t

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a historical Indicated silver resource, but it is not new information and is presented as a correction to a prior release.

Positive factors

  • cut_off_disclosed

Negative factors

  • historical_estimate_only

Evidence · table

“36.1”

Context: 1.78

Fact 31Pick Lake · zincGrade: 16.4Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
zinc
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
16.4
Grade Unit
%

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a high-grade historical Inferred zinc resource, but it is not new information and is presented as a correction to a prior release, and Inferred resources carry lower confidence.

Positive factors

  • high_grade_zinc
  • cut_off_disclosed

Negative factors

  • historical_estimate_only
  • inferred_resource

Evidence · table

“16.4”

Context: 0.27

Fact 32Pick Lake · copperGrade: 1Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
copper
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
1
Grade Unit
%

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a historical Inferred copper resource, but it is not new information and is presented as a correction to a prior release, and Inferred resources carry lower confidence.

Positive factors

  • cut_off_disclosed

Negative factors

  • historical_estimate_only
  • inferred_resource

Evidence · table

“1.0”

Context: 0.27

Fact 33Pick Lake · goldGrade: 0.3Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
gold
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
0.3
Grade Unit
g/t

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a historical Inferred gold resource, but it is not new information and is presented as a correction to a prior release, and Inferred resources carry lower confidence.

Positive factors

  • cut_off_disclosed

Negative factors

  • historical_estimate_only
  • inferred_resource

Evidence · table

“0.3”

Context: 0.27

Fact 34Pick Lake · silverGrade: 38Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pick Lake
Commodity
silver
Region
canada_on
Reported Region
Northwestern Ontario
Ticker
TT

Geometry

Grade
38
Grade Unit
g/t

Compositing

Cutoff Grade
3
Cutoff Unit
% Zn

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-10-15T00:00:00.000Z

Dates

Event date
2026-05-06T00:00:00.000Z

Reasoning: This is a historical Inferred silver resource, but it is not new information and is presented as a correction to a prior release, and Inferred resources carry lower confidence.

Positive factors

  • cut_off_disclosed

Negative factors

  • historical_estimate_only
  • inferred_resource

Evidence · table

“38.0”

Context: 0.27

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.