Taranis Discovers New Area of Epithermal Mineralization at Thor 1.4 km Southeast of Thor Epithermal Deposit

Original announcement by tmx on

Company
Taranis Resources Inc.
Ticker
TRO
Exchange
TSX
Region
Colorado
Primary commodity
Gold
Secondary commodities
Silver, Zinc, Lead, Sulfur, Antimony, Tin, Cadmium
Document categories
Drill results, Other
Extracted
2026-08-24 07:55:23 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Taranis Resources has announced a new discovery of epithermal mineralization at the 'Borr' area, located 1.4 km southeast of the existing Thor deposit. Drill hole Thor-256 intersected silver, gold, lead, and zinc mineralization in metasedimentary and metavolcaniclastic rocks.

Reasoning: Discovery of a new mineralized area (Borr) 1.4km from the existing Thor deposit, representing a significant step-out exploration success.

Positive factors

  • Step-Out Extension
  • QA/QC Disclosed
  • Virgin discovery

Negative factors

  • Deleterious Elements Present

Facts used in scoring: 24

Atlas analysis — Taranis Resources Inc.: Taranis Discovers New Area of Epithermal Mineralization at Thor 1.4 km Southeast of Thor Epithermal Deposit. 766 ppb over 0.52 m; 50 ppb over 0.87 m; 18 ppb over 1 m

Extracted facts

Stored fact records: 24. Some facts used in scoring do not have a stored record.

Drill Results (24)

Thor-256Thor · silverGrade: 75.2Grade Unit: g/tIntercept: 0.87 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
silver
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
75.2
Grade Unit
g/t
Intercept
0.87 m
From
24.13 m
To
25 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:24.13-25.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Silver grade of 75.2 g/t in a new discovery zone.

Positive factors

  • Step-Out Extension
Thor-256Thor · goldGrade: 50Grade Unit: ppbIntercept: 0.87 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
gold
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
50
Grade Unit
ppb
Intercept
0.87 m
From
24.13 m
To
25 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:24.13-25.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Gold grade of 50 ppb in a new discovery zone.

Thor-256Thor · leadGrade: 4.23Grade Unit: %Intercept: 0.87 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
lead
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
4.23
Grade Unit
%
Intercept
0.87 m
From
24.13 m
To
25 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:24.13-25.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Lead grade of 4.23% in a new discovery zone.

Thor-256Thor · zincGrade: 1.65Grade Unit: %Intercept: 0.87 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
zinc
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
1.65
Grade Unit
%
Intercept
0.87 m
From
24.13 m
To
25 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:24.13-25.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Zinc grade of 1.65% in a new discovery zone.

Thor-256Thor · silverGrade: 23.8Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
silver
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
23.8
Grade Unit
g/t
Intercept
1 m
From
25 m
To
26 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:25.00-26.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Silver grade of 23.8 g/t.

Thor-256Thor · goldGrade: 9Grade Unit: ppbIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
gold
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
9
Grade Unit
ppb
Intercept
1 m
From
25 m
To
26 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:25.00-26.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Gold grade of 9 ppb.

Thor-256Thor · leadGrade: 1.43Grade Unit: %Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
lead
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
1.43
Grade Unit
%
Intercept
1 m
From
25 m
To
26 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:25.00-26.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Lead grade of 1.43%.

Thor-256Thor · zincGrade: 1.59Grade Unit: %Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
zinc
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
1.59
Grade Unit
%
Intercept
1 m
From
25 m
To
26 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:25.00-26.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Zinc grade of 1.59%.

Thor-256Thor · silverGrade: 19.8Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
silver
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
19.8
Grade Unit
g/t
Intercept
1 m
From
26 m
To
27 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:26.00-27.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Silver grade of 19.8 g/t.

Thor-256Thor · goldGrade: 18Grade Unit: ppbIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
gold
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
18
Grade Unit
ppb
Intercept
1 m
From
26 m
To
27 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:26.00-27.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Gold grade of 18 ppb.

Thor-256Thor · leadGrade: 1.22Grade Unit: %Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
lead
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
1.22
Grade Unit
%
Intercept
1 m
From
26 m
To
27 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:26.00-27.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Lead grade of 1.22%.

Thor-256Thor · zincGrade: 2.72Grade Unit: %Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
zinc
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
2.72
Grade Unit
%
Intercept
1 m
From
26 m
To
27 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:26.00-27.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Zinc grade of 2.72%.

Thor-256Thor · silverGrade: 5Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
silver
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
5
Grade Unit
g/t
Intercept
1 m
From
27 m
To
28 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:27.00-28.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Silver grade of 5 g/t.

Thor-256Thor · goldGrade: 2Grade Unit: ppbIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
gold
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
2
Grade Unit
ppb
Intercept
1 m
From
27 m
To
28 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:27.00-28.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Gold grade of 2 ppb.

Thor-256Thor · leadGrade: 0.07Grade Unit: %Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
lead
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
0.07
Grade Unit
%
Intercept
1 m
From
27 m
To
28 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:27.00-28.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Lead grade of 0.07%.

Thor-256Thor · zincGrade: 3.76Grade Unit: %Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
zinc
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
3.76
Grade Unit
%
Intercept
1 m
From
27 m
To
28 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:27.00-28.00

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Zinc grade of 3.76%.

Thor-256Thor · silverGrade: 2.8Grade Unit: g/tIntercept: 0.86 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
silver
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
2.8
Grade Unit
g/t
Intercept
0.86 m
From
28 m
To
28.86 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.00-28.86

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Silver grade of 2.8 g/t.

Thor-256Thor · goldGrade: 9Grade Unit: ppbIntercept: 0.86 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
gold
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
9
Grade Unit
ppb
Intercept
0.86 m
From
28 m
To
28.86 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.00-28.86

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Gold grade of 9 ppb.

Thor-256Thor · leadGrade: 0.18Grade Unit: %Intercept: 0.86 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
lead
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
0.18
Grade Unit
%
Intercept
0.86 m
From
28 m
To
28.86 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.00-28.86

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Lead grade of 0.18%.

Thor-256Thor · zincGrade: 0.56Grade Unit: %Intercept: 0.86 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
zinc
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
0.56
Grade Unit
%
Intercept
0.86 m
From
28 m
To
28.86 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.00-28.86

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Zinc grade of 0.56%.

Thor-256Thor · silverGrade: 11.2Grade Unit: g/tIntercept: 0.52 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
silver
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
11.2
Grade Unit
g/t
Intercept
0.52 m
From
28.86 m
To
29.38 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.86-29.38

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Silver grade of 11.2 g/t.

Thor-256Thor · goldGrade: 766Grade Unit: ppbIntercept: 0.52 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
gold
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
766
Grade Unit
ppb
Intercept
0.52 m
From
28.86 m
To
29.38 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.86-29.38

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: High gold grade of 766 ppb in a new discovery zone.

Thor-256Thor · leadGrade: 0.19Grade Unit: %Intercept: 0.52 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
lead
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
0.19
Grade Unit
%
Intercept
0.52 m
From
28.86 m
To
29.38 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.86-29.38

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Lead grade of 0.19%.

Thor-256Thor · zincGrade: 1.02Grade Unit: %Intercept: 0.52 mView all details
Link to this fact

Identity

Hole ID
Thor-256
Project
Thor
Commodity
zinc
Region
usa_co
Reported Region
Colorado
Ticker
TRO

Geometry

Grade
1.02
Grade Unit
%
Intercept
0.52 m
From
28.86 m
To
29.38 m

Classification

Program
exploration
Sample Type
drill
Group ID
Thor-256:28.86-29.38

QA/QC

Laboratory
Actlabs
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-10-27T00:00:00.000Z

Reasoning: Zinc grade of 1.02%.

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.