Surge Continues to Encounter Robust Lithium Grades Including 31M Intercepts at 4196 PPM Li from Surface in a 640M Step Out to the SE

Original announcement by tmx on

Company
Surge Battery Metals Inc.
Ticker
NILI
Exchange
TSX
Region
Nevada
Primary commodity
Lithium
Secondary commodities
Cesium, Rubidium
Document categories
Drill results, Resource update, Metallurgy
Extracted
2026-08-22 03:19:15 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

The drill program at the Nevada North Lithium Project successfully extended high-grade lithium mineralization 640 meters to the southeast with hole NNL-037 returning 30.6 meters at 4,196 ppm Li. The program confirmed the continuity of mineralization and grades, intersecting thick claystone horizons beyond the previously established footprint. These results will support the upgrade of mineral resources and provide critical data for a planned 2026 Pre-Feasibility Study.

Reasoning: The drill program successfully extended high-grade lithium mineralization 640 meters to the southeast, confirmed continuity, and provided data for a resource upgrade and PFS, all supported by robust QA/QC.

Positive factors

  • step-out extension
  • high grade for project
  • continuity confirmed
  • resource upgrade focus
  • comprehensive QA/QC

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 60

Classification and evidence

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Hole NNL-037 is explicitly described as a '640 meters east-southeast of the nearest hole' step-out, extending mineralization beyond the known footprint.

Evidence · text

“Step-out Hole NNL-037, located 640 meters east-southeast of the nearest hole”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The release details a rigorous QA/QC protocol including systematic insertion of certified reference materials (standards), blanks, and quarter-core duplicates, with results within acceptable limits.

Evidence · text

“Surge geologists implemented a rigorous quality assurance and quality control (QA/QC) protocol. ... This included the systematic insertion of certified reference materials (MEG standards), blanks, and quarter-core duplicates.”

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The program included infill drilling to increase data density within the existing resource footprint for resource upgrades.

Evidence · text

“The infill drilling successfully increased data density within the existing resource footprint, providing the necessary information to support the upgrade of Inferred resources to Indicated and Measured classifications”

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The drilling program collected bulk samples for metallurgical test work critical to the planned 2026 Pre-Feasibility Study (PFS).

Evidence · text

“securing bulk samples for metallurgical test work critical to the planned 2026 Pre-Feasibility Study (PFS)”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The tables explicitly state a '1,250 ppm Li cutoff grade, no internal dilution' for the reported intercepts.

Evidence · table

“1,250 ppm Li cutoff grade, no internal dilution”

Context: NNL-037

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Alan J. Morris, MSc, CPG, a Qualified Person as defined under National Instrument 43-101, reviewed and approved the technical aspects of the news release.

Evidence · text

“Qualified Person: Alan J. Morris, MSc, CPG of Spring Creek, Nevada, Geological Advisor to the Company, and a Qualified Person as defined under National Instrument 43-101, has reviewed and approved the technical aspects of this news release.”

Extracted facts

Stored fact records: 60. Some facts used in scoring do not have a stored record.

Drill Results (60)

NNL-029Nevada North Lithium Project · lithiumGrade: 3989Grade Unit: ppmIntercept: 11.5 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3989
Grade Unit
ppm
Intercept
11.5 m
From
0 m
To
11.49 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:0-11.49
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3989”

Context: 11.5

NNL-029Nevada North Lithium Project · cesiumGrade: 138Grade Unit: ppmIntercept: 11.5 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
138
Grade Unit
ppm
Intercept
11.5 m
From
0 m
To
11.49 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:0-11.49
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“138”

Context: 11.5

NNL-029Nevada North Lithium Project · rubidiumGrade: 259Grade Unit: ppmIntercept: 11.5 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
259
Grade Unit
ppm
Intercept
11.5 m
From
0 m
To
11.49 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:0-11.49
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“259”

Context: 11.5

NNL-029Nevada North Lithium Project · lithiumGrade: 3000Grade Unit: ppmIntercept: 11.6 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3000
Grade Unit
ppm
Intercept
11.6 m
From
22.86 m
To
34.44 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:22.86-34.44
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3000”

Context: 11.6

NNL-029Nevada North Lithium Project · cesiumGrade: 89Grade Unit: ppmIntercept: 11.6 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
89
Grade Unit
ppm
Intercept
11.6 m
From
22.86 m
To
34.44 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:22.86-34.44
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“89”

Context: 11.6

NNL-029Nevada North Lithium Project · rubidiumGrade: 200Grade Unit: ppmIntercept: 11.6 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
200
Grade Unit
ppm
Intercept
11.6 m
From
22.86 m
To
34.44 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:22.86-34.44
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“200”

Context: 11.6

NNL-029Nevada North Lithium Project · lithiumGrade: 1775Grade Unit: ppmIntercept: 3.1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
1775
Grade Unit
ppm
Intercept
3.1 m
From
48.64 m
To
51.69 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:48.64-51.69
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“1775”

Context: 3.1

NNL-029Nevada North Lithium Project · cesiumGrade: 63Grade Unit: ppmIntercept: 3.1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
63
Grade Unit
ppm
Intercept
3.1 m
From
48.64 m
To
51.69 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:48.64-51.69
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“63”

Context: 3.1

NNL-029Nevada North Lithium Project · rubidiumGrade: 140Grade Unit: ppmIntercept: 3.1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
140
Grade Unit
ppm
Intercept
3.1 m
From
48.64 m
To
51.69 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:48.64-51.69
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“140”

Context: 3.1

NNL-029Nevada North Lithium Project · lithiumGrade: 3868Grade Unit: ppmIntercept: 12.1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3868
Grade Unit
ppm
Intercept
12.1 m
From
63.88 m
To
75.98 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:63.88-75.98
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3868”

Context: 12.1

NNL-029Nevada North Lithium Project · cesiumGrade: 88Grade Unit: ppmIntercept: 12.1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
88
Grade Unit
ppm
Intercept
12.1 m
From
63.88 m
To
75.98 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:63.88-75.98
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“88”

Context: 12.1

NNL-029Nevada North Lithium Project · rubidiumGrade: 265Grade Unit: ppmIntercept: 12.1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
265
Grade Unit
ppm
Intercept
12.1 m
From
63.88 m
To
75.98 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:63.88-75.98
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“265”

Context: 12.1

NNL-029Nevada North Lithium Project · lithiumGrade: 1335Grade Unit: ppmIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
1335
Grade Unit
ppm
Intercept
1 m
From
80.34 m
To
81.26 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:80.34-81.26
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“1335”

Context: 1.0

NNL-029Nevada North Lithium Project · cesiumGrade: 48Grade Unit: ppmIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
48
Grade Unit
ppm
Intercept
1 m
From
80.34 m
To
81.26 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:80.34-81.26
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“48”

Context: 1.0

NNL-029Nevada North Lithium Project · rubidiumGrade: 56Grade Unit: ppmIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
56
Grade Unit
ppm
Intercept
1 m
From
80.34 m
To
81.26 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:80.34-81.26
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“56”

Context: 1.0

NNL-029Nevada North Lithium Project · lithiumGrade: 1783Grade Unit: ppmIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
1783
Grade Unit
ppm
Intercept
3 m
From
97.9 m
To
100.94 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:97.9-100.94
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“1783”

Context: 3.0

NNL-029Nevada North Lithium Project · cesiumGrade: 42Grade Unit: ppmIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
42
Grade Unit
ppm
Intercept
3 m
From
97.9 m
To
100.94 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:97.9-100.94
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“42”

Context: 3.0

NNL-029Nevada North Lithium Project · rubidiumGrade: 104Grade Unit: ppmIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
104
Grade Unit
ppm
Intercept
3 m
From
97.9 m
To
100.94 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-029:97.9-100.94
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“104”

Context: 3.0

NNL-031Nevada North Lithium Project · lithiumGrade: 4468Grade Unit: ppmIntercept: 33.62 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
4468
Grade Unit
ppm
Intercept
33.62 m
From
14.54 m
To
48.16 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:14.54-48.16
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“4468”

Context: 33.62

NNL-031Nevada North Lithium Project · cesiumGrade: 159Grade Unit: ppmIntercept: 33.62 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
159
Grade Unit
ppm
Intercept
33.62 m
From
14.54 m
To
48.16 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:14.54-48.16
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“159”

Context: 33.62

NNL-031Nevada North Lithium Project · rubidiumGrade: 349Grade Unit: ppmIntercept: 33.62 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
349
Grade Unit
ppm
Intercept
33.62 m
From
14.54 m
To
48.16 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:14.54-48.16
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“349”

Context: 33.62

NNL-031Nevada North Lithium Project · lithiumGrade: 3169Grade Unit: ppmIntercept: 21.3 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3169
Grade Unit
ppm
Intercept
21.3 m
From
58.82 m
To
80.16 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:58.82-80.16
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3169”

Context: 21.3

NNL-031Nevada North Lithium Project · cesiumGrade: 98Grade Unit: ppmIntercept: 21.3 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
98
Grade Unit
ppm
Intercept
21.3 m
From
58.82 m
To
80.16 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:58.82-80.16
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“98”

Context: 21.3

NNL-031Nevada North Lithium Project · rubidiumGrade: 239Grade Unit: ppmIntercept: 21.3 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
239
Grade Unit
ppm
Intercept
21.3 m
From
58.82 m
To
80.16 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:58.82-80.16
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“239”

Context: 21.3

NNL-031Nevada North Lithium Project · lithiumGrade: 1631Grade Unit: ppmIntercept: 4.88 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
1631
Grade Unit
ppm
Intercept
4.88 m
From
102.71 m
To
107.59 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:102.71-107.59
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“1631”

Context: 4.88

NNL-031Nevada North Lithium Project · cesiumGrade: 56Grade Unit: ppmIntercept: 4.88 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
56
Grade Unit
ppm
Intercept
4.88 m
From
102.71 m
To
107.59 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:102.71-107.59
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“56”

Context: 4.88

NNL-031Nevada North Lithium Project · rubidiumGrade: 199Grade Unit: ppmIntercept: 4.88 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
199
Grade Unit
ppm
Intercept
4.88 m
From
102.71 m
To
107.59 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:102.71-107.59
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“199”

Context: 4.88

NNL-031Nevada North Lithium Project · lithiumGrade: 1982Grade Unit: ppmIntercept: 10.67 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
1982
Grade Unit
ppm
Intercept
10.67 m
From
119.78 m
To
130.45 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:119.78-130.45
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“1982”

Context: 10.67

NNL-031Nevada North Lithium Project · cesiumGrade: 71Grade Unit: ppmIntercept: 10.67 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
71
Grade Unit
ppm
Intercept
10.67 m
From
119.78 m
To
130.45 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:119.78-130.45
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“71”

Context: 10.67

NNL-031Nevada North Lithium Project · rubidiumGrade: 217Grade Unit: ppmIntercept: 10.67 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
217
Grade Unit
ppm
Intercept
10.67 m
From
119.78 m
To
130.45 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-031:119.78-130.45
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“217”

Context: 10.67

NNL-034Nevada North Lithium Project · lithiumGrade: 2061Grade Unit: ppmIntercept: 10.76 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
2061
Grade Unit
ppm
Intercept
10.76 m
From
5.79 m
To
16.55 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-034:5.79-16.55
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“2061”

Context: 10.76

NNL-034Nevada North Lithium Project · cesiumGrade: 65Grade Unit: ppmIntercept: 10.76 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
65
Grade Unit
ppm
Intercept
10.76 m
From
5.79 m
To
16.55 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-034:5.79-16.55
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“65”

Context: 10.76

NNL-034Nevada North Lithium Project · rubidiumGrade: 139Grade Unit: ppmIntercept: 10.76 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
139
Grade Unit
ppm
Intercept
10.76 m
From
5.79 m
To
16.55 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-034:5.79-16.55
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“139”

Context: 10.76

NNL-034Nevada North Lithium Project · lithiumGrade: 3425Grade Unit: ppmIntercept: 39.63 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3425
Grade Unit
ppm
Intercept
39.63 m
From
29.56 m
To
69.19 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-034:29.56-69.19
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3425”

Context: 39.63

NNL-034Nevada North Lithium Project · cesiumGrade: 99Grade Unit: ppmIntercept: 39.63 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
99
Grade Unit
ppm
Intercept
39.63 m
From
29.56 m
To
69.19 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-034:29.56-69.19
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“99”

Context: 39.63

NNL-034Nevada North Lithium Project · rubidiumGrade: 182Grade Unit: ppmIntercept: 39.63 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
182
Grade Unit
ppm
Intercept
39.63 m
From
29.56 m
To
69.19 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-034:29.56-69.19
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: This intercept confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“182”

Context: 39.63

NNL-037Nevada North Lithium Project · lithiumGrade: 3687Grade Unit: ppmIntercept: 3.7 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3687
Grade Unit
ppm
Intercept
3.7 m
From
0 m
To
3.66 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:0-3.66
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“3687”

Context: 3.7

NNL-037Nevada North Lithium Project · cesiumGrade: 97Grade Unit: ppmIntercept: 3.7 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
97
Grade Unit
ppm
Intercept
3.7 m
From
0 m
To
3.66 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:0-3.66
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“97”

Context: 3.7

NNL-037Nevada North Lithium Project · rubidiumGrade: 221Grade Unit: ppmIntercept: 3.7 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
221
Grade Unit
ppm
Intercept
3.7 m
From
0 m
To
3.66 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:0-3.66
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“221”

Context: 3.7

NNL-037Nevada North Lithium Project · lithiumGrade: 4870Grade Unit: ppmIntercept: 8.7 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
4870
Grade Unit
ppm
Intercept
8.7 m
From
10.52 m
To
19.2 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:10.52-19.2
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“4870”

Context: 8.7

NNL-037Nevada North Lithium Project · cesiumGrade: 137Grade Unit: ppmIntercept: 8.7 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
137
Grade Unit
ppm
Intercept
8.7 m
From
10.52 m
To
19.2 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:10.52-19.2
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“137”

Context: 8.7

NNL-037Nevada North Lithium Project · rubidiumGrade: 369Grade Unit: ppmIntercept: 8.7 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
369
Grade Unit
ppm
Intercept
8.7 m
From
10.52 m
To
19.2 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:10.52-19.2
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“369”

Context: 8.7

NNL-037Nevada North Lithium Project · lithiumGrade: 4353Grade Unit: ppmIntercept: 15.2 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
4353
Grade Unit
ppm
Intercept
15.2 m
From
25 m
To
40.2 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:25-40.2
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“4353”

Context: 15.2

NNL-037Nevada North Lithium Project · cesiumGrade: 111Grade Unit: ppmIntercept: 15.2 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
111
Grade Unit
ppm
Intercept
15.2 m
From
25 m
To
40.2 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:25-40.2
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“111”

Context: 15.2

NNL-037Nevada North Lithium Project · rubidiumGrade: 364Grade Unit: ppmIntercept: 15.2 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
364
Grade Unit
ppm
Intercept
15.2 m
From
25 m
To
40.2 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:25-40.2
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“364”

Context: 15.2

NNL-037Nevada North Lithium Project · lithiumGrade: 2103Grade Unit: ppmIntercept: 3.1 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
2103
Grade Unit
ppm
Intercept
3.1 m
From
50.9 m
To
53.95 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:50.9-53.95
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“2103”

Context: 3.1

NNL-037Nevada North Lithium Project · cesiumGrade: 68Grade Unit: ppmIntercept: 3.1 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
68
Grade Unit
ppm
Intercept
3.1 m
From
50.9 m
To
53.95 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:50.9-53.95
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“68”

Context: 3.1

NNL-037Nevada North Lithium Project · rubidiumGrade: 124Grade Unit: ppmIntercept: 3.1 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
124
Grade Unit
ppm
Intercept
3.1 m
From
50.9 m
To
53.95 m

Classification

Program
mixed
Sample Type
drill
Group ID
NNL-037:50.9-53.95
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: Hole NNL-037 extended high-grade lithium mineralization 640 meters to the southeast, confirming significant expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“124”

Context: 3.1

NNL-029Nevada North Lithium Project · lithiumGrade: 3306Grade Unit: ppmIntercept: 42.3 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3306
Grade Unit
ppm
Intercept
42.3 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3306”

Context: 42.3

NNL-029Nevada North Lithium Project · cesiumGrade: 96Grade Unit: ppmIntercept: 42.3 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
96
Grade Unit
ppm
Intercept
42.3 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“96”

Context: 42.3

NNL-029Nevada North Lithium Project · rubidiumGrade: 220Grade Unit: ppmIntercept: 42.3 mView all details
Link to this fact

Identity

Hole ID
NNL-029
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
220
Grade Unit
ppm
Intercept
42.3 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“220”

Context: 42.3

NNL-031Nevada North Lithium Project · lithiumGrade: 3432Grade Unit: ppmIntercept: 70.5 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3432
Grade Unit
ppm
Intercept
70.5 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3432”

Context: 70.5

NNL-031Nevada North Lithium Project · cesiumGrade: 118Grade Unit: ppmIntercept: 70.5 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
118
Grade Unit
ppm
Intercept
70.5 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“118”

Context: 70.5

NNL-031Nevada North Lithium Project · rubidiumGrade: 282Grade Unit: ppmIntercept: 70.5 mView all details
Link to this fact

Identity

Hole ID
NNL-031
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
282
Grade Unit
ppm
Intercept
70.5 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“282”

Context: 70.5

NNL-034Nevada North Lithium Project · lithiumGrade: 3134Grade Unit: ppmIntercept: 50.4 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
3134
Grade Unit
ppm
Intercept
50.4 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“3134”

Context: 50.4

NNL-034Nevada North Lithium Project · cesiumGrade: 91Grade Unit: ppmIntercept: 50.4 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
91
Grade Unit
ppm
Intercept
50.4 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“91”

Context: 50.4

NNL-034Nevada North Lithium Project · rubidiumGrade: 173Grade Unit: ppmIntercept: 50.4 mView all details
Link to this fact

Identity

Hole ID
NNL-034
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
173
Grade Unit
ppm
Intercept
50.4 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for this hole confirms the continuity of mineralization within the existing resource footprint.

Positive factors

  • continuity confirmed

Evidence · table

“173”

Context: 50.4

NNL-037Nevada North Lithium Project · lithiumGrade: 4196Grade Unit: ppmIntercept: 30.6 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
4196
Grade Unit
ppm
Intercept
30.6 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for NNL-037 represents a significant step-out with robust grades, confirming expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“4196”

Context: 30.6

NNL-037Nevada North Lithium Project · cesiumGrade: 112Grade Unit: ppmIntercept: 30.6 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
cesium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
112
Grade Unit
ppm
Intercept
30.6 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for NNL-037 represents a significant step-out with robust grades, confirming expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“112”

Context: 30.6

NNL-037Nevada North Lithium Project · rubidiumGrade: 325Grade Unit: ppmIntercept: 30.6 mView all details
Link to this fact

Identity

Hole ID
NNL-037
Project
Nevada North Lithium Project
Commodity
rubidium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Geometry

Grade
325
Grade Unit
ppm
Intercept
30.6 m

Classification

Program
mixed
Sample Type
drill
Mining Method
open_pit

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
blanks, standards, duplicates

Compositing

Cutoff Grade
1250
Cutoff Unit
ppm
Dilution Disclosed
Yes
Max Dilution
0 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-17T00:00:00.000Z

Reasoning: The cumulative mineralization for NNL-037 represents a significant step-out with robust grades, confirming expansion potential.

Positive factors

  • step-out extension
  • high grade for project

Evidence · table

“325”

Context: 30.6

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.