Spanish Mountain Gold Expands Mineralization Intersecting 252.3 Meters of 0.82 g/t Gold Including 93.5 Meters of 1.32 g/t Gold as Part of Its Feasibility Study Drill Program
Original announcement by tmx on
- Company
- Spanish Mountain Gold Ltd.
- Ticker
- SPA
- Exchange
- TSX
- Region
- British Columbia, Canada
- Primary commodity
- Gold
- Secondary commodities
- None reported
- Document categories
- Drill results, Other
- Extracted
- 2026-08-26 10:33:37 UTC
Analysis by Minestarters Atlas
Minestarters Atlas analysis
Summary
Spanish Mountain Gold Ltd. announced assay results from ten drill holes as part of its 2026 Feasibility Study Drill Program at the Spanish Mountain Gold project in British Columbia, Canada. Highlights include 26-DH-1390 intersecting 252.30 meters of 0.82 g/t gold, including 93.50 meters of 1.32 g/t gold, and 26-DH-1386 with 93.0 meters of 0.60 g/t gold. The program aims to expand and infill gold mineralization for the Main Deposit, supporting the feasibility study targeted for completion by early 2028.
Reasoning: The drill program is part of a feasibility study, with results indicating expansion of gold mineralization and long intercepts, including some high-grade zones, which is positive for the project's economics. However, the lack of true thickness determination introduces some uncertainty.
Positive factors
- Feasibility study drilling
- Expansion of mineralization
- Long intercepts
- High-grade sub-intervals
- Detailed QA/QC
Negative factors
- True thickness not determined
Facts used in scoring: 37
Classification and evidence
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: The release includes a detailed section on Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC), mentioning blanks, certified reference materials, duplicates, and chain of custody.
Evidence · text
“Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)”
QP/CP Signedpositive · Story-specific tag
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Dr. Mathew Ball, Ph.D., P.Geo., Mine Exploration Manager for Spanish Mountain Gold, is named as the Qualified Person who reviewed and approved the technical information.
Evidence · text
“Dr. Mathew Ball, Ph.D., P.Geo., Mine Exploration Manager for Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.”
Infill Drillingneutral
Confirmatory drilling to raise resource confidence, not new discovery.
Why it applies: The drill program is explicitly stated to be 'targeting infill drilling'.
Evidence · text
“targeting infill drilling and gold mineralization expansion for the Main Deposit”
Step-Out Extensionpositive
Mineralization extended beyond the previously known limit.
Why it applies: The drill program is explicitly stated to be 'targeting... gold mineralization expansion'.
Evidence · text
“targeting infill drilling and gold mineralization expansion for the Main Deposit”
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: The table explicitly states '*True thickness is not determined.' for all reported intercepts.
Evidence · table
“*True thickness is not determined.”
Context: *True thickness is not determined.
Extracted facts
Stored fact records: 37. Some facts used in scoring do not have a stored record.
Drill Results (37)
26-DH-1381Spanish Mountain Gold project · goldGrade: 0.36Grade Unit: g/tIntercept: 346.7 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1381
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.36
- Grade Unit
- g/t
- Intercept
- 346.7 m
- From
- 23.2 m
- To
- 369.9 m
- Hole Depth
- 386 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1381:23.2-369.9
- Mining Method
- open_pit
Location
- Easting
- 604242
- Northing
- 5827778
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1172 m
- Azimuth
- 120 °
- Dip
- -63 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of moderate grade gold, supporting the feasibility study. However, the lack of true width determination and the grade being moderate for open pit gold temper the positive impact.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Moderate grade
Evidence · table
“0.36”
Context: 346.70
26-DH-1381Spanish Mountain Gold project · goldGrade: 0.5Grade Unit: g/tIntercept: 21.8 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1381
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.5
- Grade Unit
- g/t
- Intercept
- 21.8 m
- From
- 23.2 m
- To
- 45 m
- Hole Depth
- 386 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1381:23.2-369.9
- Mining Method
- open_pit
Location
- Easting
- 604242
- Northing
- 5827778
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1172 m
- Azimuth
- 120 °
- Dip
- -63 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval within a longer intercept, contributing positively to the overall resource definition for the feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.50”
Context: 21.80
26-DH-1381Spanish Mountain Gold project · goldGrade: 0.61Grade Unit: g/tIntercept: 66 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1381
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.61
- Grade Unit
- g/t
- Intercept
- 66 m
- From
- 121 m
- To
- 187 m
- Hole Depth
- 386 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1381:23.2-369.9
- Mining Method
- open_pit
Location
- Easting
- 604242
- Northing
- 5827778
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1172 m
- Azimuth
- 120 °
- Dip
- -63 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.61”
Context: 66.00
26-DH-1381Spanish Mountain Gold project · goldGrade: 0.71Grade Unit: g/tIntercept: 14 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1381
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.71
- Grade Unit
- g/t
- Intercept
- 14 m
- From
- 227 m
- To
- 241 m
- Hole Depth
- 386 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1381:23.2-369.9
- Mining Method
- open_pit
Location
- Easting
- 604242
- Northing
- 5827778
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1172 m
- Azimuth
- 120 °
- Dip
- -63 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.71”
Context: 14.00
26-DH-1381Spanish Mountain Gold project · goldGrade: 0.66Grade Unit: g/tIntercept: 70.9 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1381
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.66
- Grade Unit
- g/t
- Intercept
- 70.9 m
- From
- 299 m
- To
- 369.9 m
- Hole Depth
- 386 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1381:23.2-369.9
- Mining Method
- open_pit
Location
- Easting
- 604242
- Northing
- 5827778
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1172 m
- Azimuth
- 120 °
- Dip
- -63 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.66”
Context: 70.90
26-DH-1382Spanish Mountain Gold project · goldGrade: 0.33Grade Unit: g/tIntercept: 276.4 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1382
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.33
- Grade Unit
- g/t
- Intercept
- 276.4 m
- From
- 9 m
- To
- 285.4 m
- Hole Depth
- 321 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1382:9.0-285.4
- Mining Method
- open_pit
Location
- Easting
- 604398
- Northing
- 5827495
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -58 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of weak grade gold, supporting the feasibility study. The length is positive, but the grade is at the lower end of economic viability for open pit.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.33”
Context: 276.40
26-DH-1382Spanish Mountain Gold project · goldGrade: 0.91Grade Unit: g/tIntercept: 45.95 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1382
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.91
- Grade Unit
- g/t
- Intercept
- 45.95 m
- From
- 41.65 m
- To
- 87.6 m
- Hole Depth
- 321 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1382:9.0-285.4
- Mining Method
- open_pit
Location
- Easting
- 604398
- Northing
- 5827495
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -58 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A good width of moderate grade gold, enhancing the overall mineralization for the feasibility study.
Positive factors
- Moderate grade
- Strong continuity width
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.91”
Context: 45.95
26-DH-1382Spanish Mountain Gold project · goldGrade: 0.97Grade Unit: g/tIntercept: 5.4 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1382
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.97
- Grade Unit
- g/t
- Intercept
- 5.4 m
- From
- 106.6 m
- To
- 112 m
- Hole Depth
- 321 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1382:9.0-285.4
- Mining Method
- open_pit
Location
- Easting
- 604398
- Northing
- 5827495
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -58 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval, but its narrow width limits its individual materiality, though it contributes to the overall resource.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
- Narrow intercept
Evidence · table
“0.97”
Context: 5.40
26-DH-1382Spanish Mountain Gold project · goldGrade: 0.63Grade Unit: g/tIntercept: 14 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1382
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.63
- Grade Unit
- g/t
- Intercept
- 14 m
- From
- 201 m
- To
- 215 m
- Hole Depth
- 321 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1382:9.0-285.4
- Mining Method
- open_pit
Location
- Easting
- 604398
- Northing
- 5827495
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -58 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.63”
Context: 14.00
26-DH-1383Spanish Mountain Gold project · goldGrade: 0.31Grade Unit: g/tIntercept: 176.4 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1383
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.31
- Grade Unit
- g/t
- Intercept
- 176.4 m
- From
- 99.2 m
- To
- 275.6 m
- Hole Depth
- 342 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1383:99.2-275.6
- Mining Method
- open_pit
Location
- Easting
- 604181
- Northing
- 5827801
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1170 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of weak grade gold, supporting the feasibility study. The length is positive, but the grade is at the lower end of economic viability for open pit.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.31”
Context: 176.40
26-DH-1383Spanish Mountain Gold project · goldGrade: 0.48Grade Unit: g/tIntercept: 93.6 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1383
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.48
- Grade Unit
- g/t
- Intercept
- 93.6 m
- From
- 182 m
- To
- 275.6 m
- Hole Depth
- 342 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1383:99.2-275.6
- Mining Method
- open_pit
Location
- Easting
- 604181
- Northing
- 5827801
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1170 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.48”
Context: 93.60
26-DH-1384Spanish Mountain Gold project · goldGrade: 0.33Grade Unit: g/tIntercept: 64.5 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1384
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.33
- Grade Unit
- g/t
- Intercept
- 64.5 m
- From
- 6 m
- To
- 70.5 m
- Hole Depth
- 351 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1384:6.0-70.5
- Mining Method
- open_pit
Location
- Easting
- 604153
- Northing
- 5827576
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1231 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long intercept of weak grade gold, contributing to the overall resource definition for the feasibility study.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.33”
Context: 64.50
26-DH-1384Spanish Mountain Gold project · goldGrade: 1.08Grade Unit: g/tIntercept: 10.9 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1384
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 1.08
- Grade Unit
- g/t
- Intercept
- 10.9 m
- From
- 188 m
- To
- 198.9 m
- Hole Depth
- 351 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1384:188.0-198.9
- Mining Method
- open_pit
Location
- Easting
- 604153
- Northing
- 5827576
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1231 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade intercept that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“1.08”
Context: 10.90
26-DH-1385Spanish Mountain Gold project · goldGrade: 0.36Grade Unit: g/tIntercept: 23.6 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1385
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.36
- Grade Unit
- g/t
- Intercept
- 23.6 m
- From
- 92.2 m
- To
- 115.8 m
- Hole Depth
- 318 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1385:92.2-115.8
- Mining Method
- open_pit
Location
- Easting
- 604106
- Northing
- 5827703
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1210 m
- Azimuth
- 120 °
- Dip
- -65 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A weak grade intercept that contributes to the overall resource definition for the feasibility study.
Positive factors
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.36”
Context: 23.60
26-DH-1385Spanish Mountain Gold project · goldGrade: 0.36Grade Unit: g/tIntercept: 13 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1385
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.36
- Grade Unit
- g/t
- Intercept
- 13 m
- From
- 171 m
- To
- 184 m
- Hole Depth
- 318 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1385:171.0-184.0
- Mining Method
- open_pit
Location
- Easting
- 604106
- Northing
- 5827703
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1210 m
- Azimuth
- 120 °
- Dip
- -65 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A weak grade intercept that contributes to the overall resource definition for the feasibility study.
Positive factors
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.36”
Context: 13.00
26-DH-1385Spanish Mountain Gold project · goldGrade: 0.24Grade Unit: g/tIntercept: 34.4 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1385
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.24
- Grade Unit
- g/t
- Intercept
- 34.4 m
- From
- 225.6 m
- To
- 260 m
- Hole Depth
- 318 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1385:225.6-260.0
- Mining Method
- open_pit
Location
- Easting
- 604106
- Northing
- 5827703
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1210 m
- Azimuth
- 120 °
- Dip
- -65 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A weak grade intercept that contributes to the overall resource definition for the feasibility study, but is below the typical economic threshold for open pit gold.
Positive factors
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.24”
Context: 34.40
26-DH-1386Spanish Mountain Gold project · goldGrade: 0.6Grade Unit: g/tIntercept: 93 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1386
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.6
- Grade Unit
- g/t
- Intercept
- 93 m
- From
- 213 m
- To
- 306 m
- Hole Depth
- 330 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1386:213.0-306.0
- Mining Method
- open_pit
Location
- Easting
- 604107
- Northing
- 5827682
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1210 m
- Azimuth
- 120 °
- Dip
- -59 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long intercept of moderate grade gold, supporting the feasibility study and contributing to resource expansion.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.60”
Context: 93.00
26-DH-1386Spanish Mountain Gold project · goldGrade: 0.96Grade Unit: g/tIntercept: 18 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1386
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.96
- Grade Unit
- g/t
- Intercept
- 18 m
- From
- 236 m
- To
- 254 m
- Hole Depth
- 330 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1386:213.0-306.0
- Mining Method
- open_pit
Location
- Easting
- 604107
- Northing
- 5827682
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1210 m
- Azimuth
- 120 °
- Dip
- -59 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.96”
Context: 18.00
26-DH-1386Spanish Mountain Gold project · goldGrade: 2.19Grade Unit: g/tIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1386
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 2.19
- Grade Unit
- g/t
- Intercept
- 10 m
- From
- 296 m
- To
- 306 m
- Hole Depth
- 330 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1386:213.0-306.0
- Mining Method
- open_pit
Location
- Easting
- 604107
- Northing
- 5827682
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1210 m
- Azimuth
- 120 °
- Dip
- -59 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A strong grade sub-interval that significantly enhances the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Strong grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“2.19”
Context: 10.00
26-DH-1387Spanish Mountain Gold project · goldGrade: 0.34Grade Unit: g/tIntercept: 141.5 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1387
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.34
- Grade Unit
- g/t
- Intercept
- 141.5 m
- From
- 8.5 m
- To
- 150 m
- Hole Depth
- 357 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1387:8.5-150.0
- Mining Method
- open_pit
Location
- Easting
- 604165
- Northing
- 5827531
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of weak grade gold, supporting the feasibility study. The length is positive, but the grade is at the lower end of economic viability for open pit.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.34”
Context: 141.50
26-DH-1387Spanish Mountain Gold project · goldGrade: 0.7Grade Unit: g/tIntercept: 45.6 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1387
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.7
- Grade Unit
- g/t
- Intercept
- 45.6 m
- From
- 8.5 m
- To
- 54.1 m
- Hole Depth
- 357 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1387:8.5-150.0
- Mining Method
- open_pit
Location
- Easting
- 604165
- Northing
- 5827531
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A good width of moderate grade gold, enhancing the overall mineralization for the feasibility study.
Positive factors
- Moderate grade
- Strong continuity width
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.70”
Context: 45.60
26-DH-1387Spanish Mountain Gold project · goldGrade: 0.62Grade Unit: g/tIntercept: 11 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1387
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.62
- Grade Unit
- g/t
- Intercept
- 11 m
- From
- 79 m
- To
- 90 m
- Hole Depth
- 357 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1387:8.5-150.0
- Mining Method
- open_pit
Location
- Easting
- 604165
- Northing
- 5827531
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.62”
Context: 11.00
26-DH-1387Spanish Mountain Gold project · goldGrade: 0.41Grade Unit: g/tIntercept: 16 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1387
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.41
- Grade Unit
- g/t
- Intercept
- 16 m
- From
- 134 m
- To
- 150 m
- Hole Depth
- 357 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1387:8.5-150.0
- Mining Method
- open_pit
Location
- Easting
- 604165
- Northing
- 5827531
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1238 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.41”
Context: 16.00
26-DH-1388Spanish Mountain Gold project · goldGrade: 0.35Grade Unit: g/tIntercept: 279 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1388
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.35
- Grade Unit
- g/t
- Intercept
- 279 m
- From
- 7 m
- To
- 298 m
- Hole Depth
- 336 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1388:7.0-298.0
- Mining Method
- open_pit
Location
- Easting
- 604125
- Northing
- 5827683
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1212 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of weak grade gold, supporting the feasibility study. The length is positive, but the grade is at the lower end of economic viability for open pit.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.35”
Context: 279.00
26-DH-1388Spanish Mountain Gold project · goldGrade: 0.97Grade Unit: g/tIntercept: 22 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1388
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.97
- Grade Unit
- g/t
- Intercept
- 22 m
- From
- 153 m
- To
- 175 m
- Hole Depth
- 336 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1388:7.0-298.0
- Mining Method
- open_pit
Location
- Easting
- 604125
- Northing
- 5827683
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1212 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.97”
Context: 22.00
26-DH-1388Spanish Mountain Gold project · goldGrade: 0.75Grade Unit: g/tIntercept: 69 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1388
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.75
- Grade Unit
- g/t
- Intercept
- 69 m
- From
- 217 m
- To
- 286 m
- Hole Depth
- 336 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1388:7.0-298.0
- Mining Method
- open_pit
Location
- Easting
- 604125
- Northing
- 5827683
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1212 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.75”
Context: 69.00
26-DH-1389Spanish Mountain Gold project · goldGrade: 0.28Grade Unit: g/tIntercept: 322.35 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1389
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.28
- Grade Unit
- g/t
- Intercept
- 322.35 m
- From
- 8.3 m
- To
- 330.65 m
- Hole Depth
- 354 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1389:8.3-330.65
- Mining Method
- open_pit
Location
- Easting
- 604204
- Northing
- 5827553
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1235 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of weak grade gold, supporting the feasibility study. The length is positive, but the grade is below the typical economic threshold for open pit gold.
Positive factors
- Long intercept
- Feasibility study drilling
Negative factors
- Apparent width only
- Weak grade
Evidence · table
“0.28”
Context: 322.35
26-DH-1389Spanish Mountain Gold project · goldGrade: 0.51Grade Unit: g/tIntercept: 76.7 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1389
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.51
- Grade Unit
- g/t
- Intercept
- 76.7 m
- From
- 8.3 m
- To
- 85 m
- Hole Depth
- 354 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1389:8.3-330.65
- Mining Method
- open_pit
Location
- Easting
- 604204
- Northing
- 5827553
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1235 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.51”
Context: 76.70
26-DH-1389Spanish Mountain Gold project · goldGrade: 0.6Grade Unit: g/tIntercept: 5.25 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1389
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.6
- Grade Unit
- g/t
- Intercept
- 5.25 m
- From
- 128.75 m
- To
- 134 m
- Hole Depth
- 354 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1389:8.3-330.65
- Mining Method
- open_pit
Location
- Easting
- 604204
- Northing
- 5827553
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1235 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval, but its narrow width limits its individual materiality, though it contributes to the overall resource.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
- Narrow intercept
Evidence · table
“0.60”
Context: 5.25
26-DH-1389Spanish Mountain Gold project · goldGrade: 1.64Grade Unit: g/tIntercept: 11 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1389
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 1.64
- Grade Unit
- g/t
- Intercept
- 11 m
- From
- 178 m
- To
- 189 m
- Hole Depth
- 354 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1389:8.3-330.65
- Mining Method
- open_pit
Location
- Easting
- 604204
- Northing
- 5827553
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1235 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A strong grade sub-interval that significantly enhances the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Strong grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“1.64”
Context: 11.00
26-DH-1389Spanish Mountain Gold project · goldGrade: 0.43Grade Unit: g/tIntercept: 8.55 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1389
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.43
- Grade Unit
- g/t
- Intercept
- 8.55 m
- From
- 286.85 m
- To
- 295.4 m
- Hole Depth
- 354 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1389:8.3-330.65
- Mining Method
- open_pit
Location
- Easting
- 604204
- Northing
- 5827553
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1235 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.43”
Context: 8.55
26-DH-1389Spanish Mountain Gold project · goldGrade: 4.88Grade Unit: g/tIntercept: 1.95 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1389
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 4.88
- Grade Unit
- g/t
- Intercept
- 1.95 m
- From
- 328.7 m
- To
- 330.65 m
- Hole Depth
- 354 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1389:8.3-330.65
- Mining Method
- open_pit
Location
- Easting
- 604204
- Northing
- 5827553
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1235 m
- Azimuth
- 120 °
- Dip
- -66 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A strong grade sub-interval, but its very narrow width limits its individual materiality, though it contributes to the overall resource.
Positive factors
- Strong grade
- Feasibility study drilling
Negative factors
- Apparent width only
- Narrow intercept
Evidence · table
“4.88”
Context: 1.95
26-DH-1390Spanish Mountain Gold project · goldGrade: 0.82Grade Unit: g/tIntercept: 252.3 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1390
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.82
- Grade Unit
- g/t
- Intercept
- 252.3 m
- From
- 75.5 m
- To
- 327.8 m
- Hole Depth
- 399 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1390:75.5-327.8
- Mining Method
- open_pit
Location
- Easting
- 604284
- Northing
- 5827616
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1208 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A very long intercept of moderate grade gold, which is highly material for the feasibility study and resource expansion.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.82”
Context: 252.30
26-DH-1390Spanish Mountain Gold project · goldGrade: 1.32Grade Unit: g/tIntercept: 93.5 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1390
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 1.32
- Grade Unit
- g/t
- Intercept
- 93.5 m
- From
- 75.5 m
- To
- 169 m
- Hole Depth
- 399 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1390:75.5-327.8
- Mining Method
- open_pit
Location
- Easting
- 604284
- Northing
- 5827616
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1208 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that significantly enhances the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“1.32”
Context: 93.50
26-DH-1390Spanish Mountain Gold project · goldGrade: 1.16Grade Unit: g/tIntercept: 19.5 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1390
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 1.16
- Grade Unit
- g/t
- Intercept
- 19.5 m
- From
- 186 m
- To
- 205.5 m
- Hole Depth
- 399 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1390:75.5-327.8
- Mining Method
- open_pit
Location
- Easting
- 604284
- Northing
- 5827616
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1208 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“1.16”
Context: 19.50
26-DH-1390Spanish Mountain Gold project · goldGrade: 0.55Grade Unit: g/tIntercept: 106.9 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1390
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 0.55
- Grade Unit
- g/t
- Intercept
- 106.9 m
- From
- 220.9 m
- To
- 327.8 m
- Hole Depth
- 399 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1390:75.5-327.8
- Mining Method
- open_pit
Location
- Easting
- 604284
- Northing
- 5827616
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1208 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A long, moderate grade sub-interval that adds to the overall mineralization, supporting the ongoing feasibility study.
Positive factors
- Long intercept
- Moderate grade
- Feasibility study drilling
Negative factors
- Apparent width only
Evidence · table
“0.55”
Context: 106.90
26-DH-1390Spanish Mountain Gold project · goldGrade: 3.23Grade Unit: g/tIntercept: 5.2 mView all detailsHide details
Identity
- Hole ID
- 26-DH-1390
- Project
- Spanish Mountain Gold project
- Commodity
- gold
- Region
- canada_bc
- Reported Region
- British Columbia, Canada
- Ticker
- SPA
Geometry
- Grade
- 3.23
- Grade Unit
- g/t
- Intercept
- 5.2 m
- From
- 194.8 m
- To
- 200 m
- Hole Depth
- 399 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- 26-DH-1390:75.5-327.8
- Mining Method
- open_pit
Location
- Easting
- 604284
- Northing
- 5827616
- CRS
- UTM NAD83 Zone 10N
- Elevation
- 1208 m
- Azimuth
- 120 °
- Dip
- -60 °
- Loc. Confidence
- high
QA/QC
- Laboratory
- MSALABS
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- blanks, standards, duplicates, check_assays
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-27T00:00:00.000Z
Reasoning: A strong grade sub-interval, but its narrow width limits its individual materiality, though it contributes to the overall resource.
Positive factors
- Strong grade
- Feasibility study drilling
Negative factors
- Apparent width only
- Narrow intercept
Evidence · text
“5.2 m of 3.23 g/t gold from 194.8 m”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.