SMI: Investor Presentation - Precious Metals Summit Beaver Creek

Original announcement by asx on

Company
Santana Minerals Limited
Ticker
SMI
Exchange
ASX
Region
Central Otago
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Resource update, Other
Extracted
2026-09-22 22:09:45 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Santana Minerals presented an investor update for the Bendigo-Ophir Gold Project in Central Otago, New Zealand. The project features 1.2 Moz of gold reserves at 2.6 g/t and is advancing through the permitting process with a final decision expected in January 2027.

Reasoning: The presentation summarizes existing Pre-Feasibility Study (PFS) results for the Bendigo-Ophir project, highlighting strong reserves and advanced permitting, though it offers little new geological data.

Positive factors

  • Strong reserve figures (1.2 Moz @ 2.6 g/t)
  • High-margin economics (AISC US$1,680/oz)
  • Advanced permitting status with draft decision expected Nov 2026
  • Significant M&I ratio (93% Indicated)

Negative factors

  • Low novelty (presentation of existing PFS data)
  • Financing requirement of A$277 million noted

Facts used in scoring: 3

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The presentation references a Pre-Feasibility Study and JORC compliance, which is the standard for such reporting in this jurisdiction.

Evidence · text

“The reports were issued in accordance with the 2012 Edition of the JORC Australasian Code”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The report explicitly names Kerrin Allwood as a Competent Person (CP) and member of AusIMM.

Evidence · text

“based on work completed by Mr Kerrin Allwood, a Competent Person (CP) who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM).”

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Resource Estimates (3)

probableBendigo-Ophir Gold Project · goldGrade: 2.6Grade Unit: g/tContained Metal: 1200000Contained Unit: ozView all details
Link to this fact

Identity

Project
Bendigo-Ophir Gold Project
Commodity
gold
Region
central otago
Reported Region
Central Otago
Ticker
SMI

Resource scope

Estimate type
reserve
Effective date
2025-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:8d081789e4743e69b8f4
Deposit or zone
Bendigo-Ophir
Mining method
combined

Resource Data

Category
probable
Grade
2.6
Grade Unit
g/t
Contained Metal
1200000
Contained Unit
oz

Prior Estimate

Resource Date
2025-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-22T00:00:00.000Z

Reasoning: High-grade reserve reported as part of the PFS.

Positive factors

  • Strong grade and scale

Evidence · text

“Reserve of 1.2 M oz @ 2.6 g/t Gold”

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBendigo-Ophir Gold Project · goldGrade: 2.3Grade Unit: g/tContained Metal: 1.6Contained Unit: mozView all details
Link to this fact

Identity

Project
Bendigo-Ophir Gold Project
Commodity
gold
Region
central otago
Reported Region
Central Otago
Ticker
SMI

Resource scope

Estimate type
resource
Effective date
2025-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:19988ccba269ce9a87df
Deposit or zone
Indicated Resource
Mining method
combined

Resource Data

Category
indicated
Grade
2.3
Grade Unit
g/t
Contained Metal
1.6
Contained Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-22T00:00:00.000Z

Reasoning: Indicated resource component of the total mineral resource.

Positive factors

  • Large indicated resource

Evidence · text

“1.6Moz @ 2.3g/t Au”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBendigo-Ophir Gold Project · goldGrade: 4.3Grade Unit: g/tContained Metal: 0.3Contained Unit: mozView all details
Link to this fact

Identity

Project
Bendigo-Ophir Gold Project
Commodity
gold
Region
central otago
Reported Region
Central Otago
Ticker
SMI

Resource scope

Estimate type
resource
Effective date
2025-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:d2d4197f6474e62d816a
Deposit or zone
Inferred Resource
Mining method
combined

Resource Data

Category
inferred
Grade
4.3
Grade Unit
g/t
Contained Metal
0.3
Contained Unit
moz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-22T00:00:00.000Z

Reasoning: Inferred resource component with lower confidence.

Positive factors

  • High grade in inferred category

Negative factors

  • Low geological confidence

Evidence · text

“0.3Moz @ 4.3g/t Au”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.