ReeXploration Reports Downhole Gamma Results Supporting an Extensive Uranium System at Eureka in Namibia

Original announcement by jmn on

Company
ReeXploration Inc.
Ticker
REE
Exchange
TSXV
Region
Namibia
Primary commodity
Uranium
Secondary commodities
None reported
Document categories
Drill results
Extracted
2026-10-06 12:41:26 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

ReeXploration Inc. reported downhole gamma results from its Phase 1 drilling program at the Eureka Project in Namibia, confirming widespread equivalent uranium oxide (eU₃O₈) responses within leucogranite intrusions and their contacts. The program identified two distinct uranium exploration opportunities: leucogranite-hosted bedrock mineralization and shallow secondary uranium in calcrete. The results, including intercepts such as 16.7 metres averaging 79.2 ppm eU₃O₈ in SU26-08, support the geological model and warrant further exploration.

Reasoning: The document reports widespread, albeit low-grade, uranium mineralization from downhole gamma surveys, which is a positive step for early-stage exploration, confirming the geological model and identifying future targets. However, the preliminary nature of the gamma-derived grades and lack of true width information temper the overall significance.

Positive factors

  • Widespread uranium mineralization confirmed over a large area
  • Supports the geological model for a leucogranite-hosted system
  • Identification of two distinct target types (bedrock and shallow calcrete) for follow-up
  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information
  • Reconnaissance drilling successfully identified zones of interest

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds
  • Historical resource estimate is not NI 43-101 compliant and cannot be relied upon

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 92

Classification and evidence

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The release explicitly states that 'Lengths are nominal downhole lengths, not true widths' and 'true widths have not been determined'.

Evidence · text

“Lengths are nominal downhole lengths, not true widths.”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The release mentions the use of a calibrated gamma probe, corrections for detector dead time and borehole-water attenuation, and a repeat log for comparison, indicating QA/QC procedures were followed.

Evidence · text

“The downhole surveys used a calibrated LIM DEV gamma probe, serial number 1620. Gamma measurements were reported at 0.1-metre depth increments. Raw counts were corrected for detector dead time, using a four-microsecond parameter, and borehole-water attenuation where applicable, before conversion to eU₃O₈. A repeat log of SU26-05 was provided for comparison with the original survey.”

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: The document clearly states the compositing rules: 'Composites use a 50 ppm lower cut-off and allow gaps of up to 1.0 metre of lower readings within an interval'.

Evidence · text

“Composites use a 50 ppm lower cut-off and allow gaps of up to 1.0 metre of lower readings within an interval ("internal dilution").”

Exploration Drillingneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The drilling program is described as a 'reconnaissance drilling program' and aims to 'warrant targeted follow-up exploration' and 'exploring new uranium targets'.

Evidence · text

“11-hole, 1,729-metre reconnaissance drilling program ("Phase 1")”

Radiometric Estimatenegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The grades are explicitly stated as 'eU₃O₈ is estimated from gamma radiation, not a direct chemical measurement of uranium' and 'represent radiometric estimates rather than direct chemical measurements'.

Evidence · text

“eU₃O₈ is estimated from gamma radiation, not a direct chemical measurement of uranium.”

Low Gradenegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The highest average grade reported is 242.7 ppm eU₃O₈ over 1.0 meter, which is below the 'weak' threshold of 300 ppm for uranium.

Evidence · table

“242.7”

Context: 1.0

Extracted facts

Stored fact records: 92. Some facts used in scoring do not have a stored record.

Drill Results (92)

SU26-01Eureka · uraniumGrade: 51.1Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.1
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
1.25 m
To
1.45 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:1.25-1.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.1”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 59.2Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
59.2
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
35.35 m
To
35.75 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:35.35-35.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“59.2”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 74.5Grade Unit: ppm eU₃O₈Intercept: 0.9 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
74.5
Grade Unit
ppm eU₃O₈
Intercept
0.9 m
From
43.05 m
To
43.95 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:43.05-43.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“74.5”

Context: 0.9

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 73.1Grade Unit: ppm eU₃O₈Intercept: 1.8 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
73.1
Grade Unit
ppm eU₃O₈
Intercept
1.8 m
From
45.25 m
To
47.05 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:45.25-47.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“73.1”

Context: 1.8

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 149.7Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
149.7
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
45.35 m
To
45.55 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:45.35-45.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“149.7”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 65.2Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
65.2
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
50.25 m
To
50.45 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:50.25-50.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“65.2”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 58.6Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
58.6
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
91.95 m
To
92.35 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:91.95-92.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“58.6”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 64.4Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
64.4
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
96.15 m
To
96.85 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:96.15-96.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“64.4”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 69.8Grade Unit: ppm eU₃O₈Intercept: 1.3 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
69.8
Grade Unit
ppm eU₃O₈
Intercept
1.3 m
From
106.85 m
To
108.15 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:106.85-108.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“69.8”

Context: 1.3

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 65.5Grade Unit: ppm eU₃O₈Intercept: 3.5 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
65.5
Grade Unit
ppm eU₃O₈
Intercept
3.5 m
From
110.35 m
To
113.85 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:110.35-113.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“65.5”

Context: 3.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 50.6Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
50.6
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
118.55 m
To
118.65 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:118.55-118.65
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“50.6”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 51.9Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.9
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
119.45 m
To
119.55 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:119.45-119.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.9”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 51.7Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.7
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
120.05 m
To
120.75 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:120.05-120.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.7”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 141.1Grade Unit: ppm eU₃O₈Intercept: 1.7 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
141.1
Grade Unit
ppm eU₃O₈
Intercept
1.7 m
From
124.25 m
To
125.95 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:124.25-125.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“141.1”

Context: 1.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 151.2Grade Unit: ppm eU₃O₈Intercept: 1.5 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
151.2
Grade Unit
ppm eU₃O₈
Intercept
1.5 m
From
124.35 m
To
125.85 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:124.35-125.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“151.2”

Context: 1.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 187.3Grade Unit: ppm eU₃O₈Intercept: 1.5 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
187.3
Grade Unit
ppm eU₃O₈
Intercept
1.5 m
From
138.05 m
To
139.55 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:138.05-139.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“187.3”

Context: 1.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 242.7Grade Unit: ppm eU₃O₈Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
242.7
Grade Unit
ppm eU₃O₈
Intercept
1 m
From
138.45 m
To
139.45 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:138.45-139.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“242.7”

Context: 1.0

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 55.6Grade Unit: ppm eU₃O₈Intercept: 0.3 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
55.6
Grade Unit
ppm eU₃O₈
Intercept
0.3 m
From
143.05 m
To
143.35 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:143.05-143.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“55.6”

Context: 0.3

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 104Grade Unit: ppm eU₃O₈Intercept: 2.9 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
104
Grade Unit
ppm eU₃O₈
Intercept
2.9 m
From
144.55 m
To
147.45 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:144.55-147.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“104.0”

Context: 2.9

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-01Eureka · uraniumGrade: 129.9Grade Unit: ppm eU₃O₈Intercept: 1.6 mView all details
Link to this fact

Identity

Hole ID
SU26-01
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
129.9
Grade Unit
ppm eU₃O₈
Intercept
1.6 m
From
145.25 m
To
146.85 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-01:145.25-146.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“129.9”

Context: 1.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-02Eureka · uraniumGrade: 60.8Grade Unit: ppm eU₃O₈Intercept: 11.5 mView all details
Link to this fact

Identity

Hole ID
SU26-02
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
60.8
Grade Unit
ppm eU₃O₈
Intercept
11.5 m
From
14.55 m
To
26.05 m
Intercept Depth
14.55 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-02:14.55-26.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“60.8”

Context: 11.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-02Eureka · uraniumGrade: 65.3Grade Unit: ppm eU₃O₈Intercept: 0.9 mView all details
Link to this fact

Identity

Hole ID
SU26-02
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
65.3
Grade Unit
ppm eU₃O₈
Intercept
0.9 m
From
50.95 m
To
51.85 m
Intercept Depth
14.55 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-02:50.95-51.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“65.3”

Context: 0.9

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-02Eureka · uraniumGrade: 50.5Grade Unit: ppm eU₃O₈Intercept: 1.9 mView all details
Link to this fact

Identity

Hole ID
SU26-02
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
50.5
Grade Unit
ppm eU₃O₈
Intercept
1.9 m
From
54.75 m
To
56.65 m
Intercept Depth
14.55 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-02:54.75-56.65
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“50.5”

Context: 1.9

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-03Eureka · uraniumGrade: 56.3Grade Unit: ppm eU₃O₈Intercept: 1.4 mView all details
Link to this fact

Identity

Hole ID
SU26-03
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
56.3
Grade Unit
ppm eU₃O₈
Intercept
1.4 m
From
0.85 m
To
2.25 m
Intercept Depth
0.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-03:0.85-2.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“56.3”

Context: 1.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-03Eureka · uraniumGrade: 53Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-03
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
53
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
49.65 m
To
49.75 m
Intercept Depth
0.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-03:49.65-49.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“53.0”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 55.4Grade Unit: ppm eU₃O₈Intercept: 3.4 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
55.4
Grade Unit
ppm eU₃O₈
Intercept
3.4 m
From
0.95 m
To
4.35 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:0.95-4.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“55.4”

Context: 3.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 57.7Grade Unit: ppm eU₃O₈Intercept: 6.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
57.7
Grade Unit
ppm eU₃O₈
Intercept
6.2 m
From
8.95 m
To
15.15 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:8.95-15.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“57.7”

Context: 6.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 53Grade Unit: ppm eU₃O₈Intercept: 6.6 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
53
Grade Unit
ppm eU₃O₈
Intercept
6.6 m
From
16.65 m
To
23.25 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:16.65-23.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“53.0”

Context: 6.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 54Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
54
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
24.65 m
To
24.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:24.65-24.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“54.0”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 58.6Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
58.6
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
38.45 m
To
38.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:38.45-38.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“58.6”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 54Grade Unit: ppm eU₃O₈Intercept: 1.7 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
54
Grade Unit
ppm eU₃O₈
Intercept
1.7 m
From
39.55 m
To
41.25 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:39.55-41.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“54.0”

Context: 1.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 73.5Grade Unit: ppm eU₃O₈Intercept: 0.9 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
73.5
Grade Unit
ppm eU₃O₈
Intercept
0.9 m
From
46.25 m
To
47.15 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:46.25-47.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“73.5”

Context: 0.9

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 51.5Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.5
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
53.65 m
To
53.75 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:53.65-53.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.5”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 51.9Grade Unit: ppm eU₃O₈Intercept: 1.7 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.9
Grade Unit
ppm eU₃O₈
Intercept
1.7 m
From
55.85 m
To
57.55 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:55.85-57.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.9”

Context: 1.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 53.7Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
53.7
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
62.25 m
To
62.95 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:62.25-62.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“53.7”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 115.7Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
115.7
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
66.25 m
To
66.95 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:66.25-66.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“115.7”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 129.8Grade Unit: ppm eU₃O₈Intercept: 0.5 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
129.8
Grade Unit
ppm eU₃O₈
Intercept
0.5 m
From
66.35 m
To
66.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:66.35-66.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“129.8”

Context: 0.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 51.9Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.9
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
77.15 m
To
77.25 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:77.15-77.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.9”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 139.7Grade Unit: ppm eU₃O₈Intercept: 4.9 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
139.7
Grade Unit
ppm eU₃O₈
Intercept
4.9 m
From
80.05 m
To
84.95 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:80.05-84.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“139.7”

Context: 4.9

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 115.3Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
115.3
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
80.15 m
To
80.35 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:80.15-80.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“115.3”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 146.3Grade Unit: ppm eU₃O₈Intercept: 4.3 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
146.3
Grade Unit
ppm eU₃O₈
Intercept
4.3 m
From
80.55 m
To
84.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:80.55-84.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“146.3”

Context: 4.3

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 71Grade Unit: ppm eU₃O₈Intercept: 0.5 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
71
Grade Unit
ppm eU₃O₈
Intercept
0.5 m
From
102.25 m
To
102.75 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:102.25-102.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“71.0”

Context: 0.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 64Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
64
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
116.15 m
To
116.75 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:116.15-116.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“64.0”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 84.1Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
84.1
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
139.25 m
To
139.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:139.25-139.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“84.1”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 100.9Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
100.9
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
139.65 m
To
139.75 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:139.65-139.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“100.9”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 54.6Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
54.6
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
142.85 m
To
143.05 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:142.85-143.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“54.6”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 65.3Grade Unit: ppm eU₃O₈Intercept: 4.5 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
65.3
Grade Unit
ppm eU₃O₈
Intercept
4.5 m
From
147.85 m
To
152.35 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:147.85-152.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“65.3”

Context: 4.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 62.8Grade Unit: ppm eU₃O₈Intercept: 0.8 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
62.8
Grade Unit
ppm eU₃O₈
Intercept
0.8 m
From
164.55 m
To
165.35 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:164.55-165.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“62.8”

Context: 0.8

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 68.2Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
68.2
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
166.75 m
To
167.35 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:166.75-167.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“68.2”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 66.1Grade Unit: ppm eU₃O₈Intercept: 15.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
66.1
Grade Unit
ppm eU₃O₈
Intercept
15.2 m
From
170.75 m
To
185.95 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:170.75-185.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“66.1”

Context: 15.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 116.8Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
116.8
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
175.55 m
To
175.65 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:175.55-175.65
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“116.8”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 135.3Grade Unit: ppm eU₃O₈Intercept: 0.3 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
135.3
Grade Unit
ppm eU₃O₈
Intercept
0.3 m
From
176.55 m
To
176.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:176.55-176.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“135.3”

Context: 0.3

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 103.3Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
103.3
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
179.05 m
To
179.25 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:179.05-179.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“103.3”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 150.3Grade Unit: ppm eU₃O₈Intercept: 0.8 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
150.3
Grade Unit
ppm eU₃O₈
Intercept
0.8 m
From
180.85 m
To
181.65 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:180.85-181.65
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“150.3”

Context: 0.8

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 53.4Grade Unit: ppm eU₃O₈Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
53.4
Grade Unit
ppm eU₃O₈
Intercept
1 m
From
188.85 m
To
189.85 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:188.85-189.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“53.4”

Context: 1.0

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 68.6Grade Unit: ppm eU₃O₈Intercept: 0.5 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
68.6
Grade Unit
ppm eU₃O₈
Intercept
0.5 m
From
192.05 m
To
192.55 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:192.05-192.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“68.6”

Context: 0.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 55Grade Unit: ppm eU₃O₈Intercept: 0.3 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
55
Grade Unit
ppm eU₃O₈
Intercept
0.3 m
From
197.45 m
To
197.75 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:197.45-197.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“55.0”

Context: 0.3

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 86.6Grade Unit: ppm eU₃O₈Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
86.6
Grade Unit
ppm eU₃O₈
Intercept
1 m
From
199.15 m
To
200.15 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:199.15-200.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“86.6”

Context: 1.0

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-04Eureka · uraniumGrade: 103.8Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-04
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
103.8
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
199.55 m
To
199.75 m
Intercept Depth
0.95 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-04:199.55-199.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“103.8”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 51Grade Unit: ppm eU₃O₈Intercept: 0.5 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51
Grade Unit
ppm eU₃O₈
Intercept
0.5 m
From
0.65 m
To
1.15 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:0.65-1.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.0”

Context: 0.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 53.5Grade Unit: ppm eU₃O₈Intercept: 1.2 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
53.5
Grade Unit
ppm eU₃O₈
Intercept
1.2 m
From
15.55 m
To
16.75 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:15.55-16.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“53.5”

Context: 1.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 58.4Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
58.4
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
27.45 m
To
28.05 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:27.45-28.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“58.4”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 50.4Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
50.4
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
29.55 m
To
30.25 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:29.55-30.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“50.4”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 107.5Grade Unit: ppm eU₃O₈Intercept: 1.2 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
107.5
Grade Unit
ppm eU₃O₈
Intercept
1.2 m
From
35.15 m
To
36.35 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:35.15-36.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“107.5”

Context: 1.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 157.9Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
157.9
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
35.35 m
To
35.75 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:35.35-35.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“157.9”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-05Eureka · uraniumGrade: 108.4Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-05
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
108.4
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
36.05 m
To
36.15 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-05:36.05-36.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“108.4”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-06Eureka · uraniumGrade: 71.4Grade Unit: ppm eU₃O₈Intercept: 3 mView all details
Link to this fact

Identity

Hole ID
SU26-06
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
71.4
Grade Unit
ppm eU₃O₈
Intercept
3 m
From
1.35 m
To
4.35 m
Intercept Depth
1.35 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-06:1.35-4.35
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“71.4”

Context: 3.0

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-06Eureka · uraniumGrade: 143.3Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-06
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
143.3
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
1.35 m
To
1.95 m
Intercept Depth
1.35 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-06:1.35-1.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“143.3”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-06Eureka · uraniumGrade: 53.1Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-06
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
53.1
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
51.75 m
To
51.85 m
Intercept Depth
1.35 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-06:51.75-51.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“53.1”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-06Eureka · uraniumGrade: 55.6Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-06
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
55.6
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
52.35 m
To
52.55 m
Intercept Depth
1.35 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-06:52.35-52.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“55.6”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-07Eureka · uraniumGrade: 55Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-07
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
55
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
1.25 m
To
1.85 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-07:1.25-1.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“55.0”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-07Eureka · uraniumGrade: 57Grade Unit: ppm eU₃O₈Intercept: 5.7 mView all details
Link to this fact

Identity

Hole ID
SU26-07
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
57
Grade Unit
ppm eU₃O₈
Intercept
5.7 m
From
54.25 m
To
59.95 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-07:54.25-59.95
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“57.0”

Context: 5.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-07Eureka · uraniumGrade: 62.9Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-07
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
62.9
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
67.25 m
To
67.45 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-07:67.25-67.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“62.9”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-07Eureka · uraniumGrade: 66.2Grade Unit: ppm eU₃O₈Intercept: 0.5 mView all details
Link to this fact

Identity

Hole ID
SU26-07
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
66.2
Grade Unit
ppm eU₃O₈
Intercept
0.5 m
From
102.65 m
To
103.15 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-07:102.65-103.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“66.2”

Context: 0.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-07Eureka · uraniumGrade: 57.1Grade Unit: ppm eU₃O₈Intercept: 2 mView all details
Link to this fact

Identity

Hole ID
SU26-07
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
57.1
Grade Unit
ppm eU₃O₈
Intercept
2 m
From
106.45 m
To
108.45 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-07:106.45-108.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“57.1”

Context: 2.0

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-07Eureka · uraniumGrade: 56.8Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-07
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
56.8
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
118.45 m
To
118.85 m
Intercept Depth
1.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-07:118.45-118.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“56.8”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-08Eureka · uraniumGrade: 55.7Grade Unit: ppm eU₃O₈Intercept: 0.8 mView all details
Link to this fact

Identity

Hole ID
SU26-08
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
55.7
Grade Unit
ppm eU₃O₈
Intercept
0.8 m
From
1.65 m
To
2.45 m
Intercept Depth
1.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-08:1.65-2.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“55.7”

Context: 0.8

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-08Eureka · uraniumGrade: 51.2Grade Unit: ppm eU₃O₈Intercept: 1.4 mView all details
Link to this fact

Identity

Hole ID
SU26-08
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.2
Grade Unit
ppm eU₃O₈
Intercept
1.4 m
From
119.05 m
To
120.45 m
Intercept Depth
1.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-08:119.05-120.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.2”

Context: 1.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-08Eureka · uraniumGrade: 79.2Grade Unit: ppm eU₃O₈Intercept: 16.7 mView all details
Link to this fact

Identity

Hole ID
SU26-08
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
79.2
Grade Unit
ppm eU₃O₈
Intercept
16.7 m
From
123.35 m
To
140.05 m
Intercept Depth
1.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-08:123.35-140.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“79.2”

Context: 16.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-08Eureka · uraniumGrade: 218.2Grade Unit: ppm eU₃O₈Intercept: 1.2 mView all details
Link to this fact

Identity

Hole ID
SU26-08
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
218.2
Grade Unit
ppm eU₃O₈
Intercept
1.2 m
From
135.05 m
To
136.25 m
Intercept Depth
1.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-08:135.05-136.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“218.2”

Context: 1.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-08Eureka · uraniumGrade: 182.6Grade Unit: ppm eU₃O₈Intercept: 1 mView all details
Link to this fact

Identity

Hole ID
SU26-08
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
182.6
Grade Unit
ppm eU₃O₈
Intercept
1 m
From
137.25 m
To
138.25 m
Intercept Depth
1.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-08:137.25-138.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“182.6”

Context: 1.0

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-09Eureka · uraniumGrade: 91Grade Unit: ppm eU₃O₈Intercept: 6.5 mView all details
Link to this fact

Identity

Hole ID
SU26-09
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
91
Grade Unit
ppm eU₃O₈
Intercept
6.5 m
From
1.05 m
To
7.55 m
Intercept Depth
1.05 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-09:1.05-7.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“91.0”

Context: 6.5

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-09Eureka · uraniumGrade: 112.7Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-09
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
112.7
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
1.05 m
To
1.45 m
Intercept Depth
1.05 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-09:1.05-1.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“112.7”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-09Eureka · uraniumGrade: 123.5Grade Unit: ppm eU₃O₈Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
SU26-09
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
123.5
Grade Unit
ppm eU₃O₈
Intercept
0.6 m
From
1.95 m
To
2.55 m
Intercept Depth
1.05 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-09:1.95-2.55
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“123.5”

Context: 0.6

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-09Eureka · uraniumGrade: 121.3Grade Unit: ppm eU₃O₈Intercept: 1.2 mView all details
Link to this fact

Identity

Hole ID
SU26-09
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
121.3
Grade Unit
ppm eU₃O₈
Intercept
1.2 m
From
3.05 m
To
4.25 m
Intercept Depth
1.05 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-09:3.05-4.25
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“121.3”

Context: 1.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-09Eureka · uraniumGrade: 132.4Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-09
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
132.4
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
4.35 m
To
5.05 m
Intercept Depth
1.05 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-09:4.35-5.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“132.4”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-10Eureka · uraniumGrade: 99.9Grade Unit: ppm eU₃O₈Intercept: 2.4 mView all details
Link to this fact

Identity

Hole ID
SU26-10
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
99.9
Grade Unit
ppm eU₃O₈
Intercept
2.4 m
From
0.65 m
To
3.05 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-10:0.65-3.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“99.9”

Context: 2.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-10Eureka · uraniumGrade: 119.6Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-10
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
119.6
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
0.65 m
To
1.05 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-10:0.65-1.05
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“119.6”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-10Eureka · uraniumGrade: 108.8Grade Unit: ppm eU₃O₈Intercept: 0.7 mView all details
Link to this fact

Identity

Hole ID
SU26-10
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
108.8
Grade Unit
ppm eU₃O₈
Intercept
0.7 m
From
1.15 m
To
1.85 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-10:1.15-1.85
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“108.8”

Context: 0.7

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-10Eureka · uraniumGrade: 103.6Grade Unit: ppm eU₃O₈Intercept: 0.1 mView all details
Link to this fact

Identity

Hole ID
SU26-10
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
103.6
Grade Unit
ppm eU₃O₈
Intercept
0.1 m
From
2.05 m
To
2.15 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-10:2.05-2.15
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This sub-interval shows a higher grade within the broader mineralized zone, indicating a more concentrated area of uranium mineralization.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical assays, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined

Evidence · table

“103.6”

Context: 0.1

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-10Eureka · uraniumGrade: 60.7Grade Unit: ppm eU₃O₈Intercept: 0.4 mView all details
Link to this fact

Identity

Hole ID
SU26-10
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
60.7
Grade Unit
ppm eU₃O₈
Intercept
0.4 m
From
4.35 m
To
4.75 m
Intercept Depth
0.65 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-10:4.35-4.75
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“60.7”

Context: 0.4

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

SU26-11Eureka · uraniumGrade: 51.8Grade Unit: ppm eU₃O₈Intercept: 0.2 mView all details
Link to this fact

Identity

Hole ID
SU26-11
Project
Eureka
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
REE

Geometry

Grade
51.8
Grade Unit
ppm eU₃O₈
Intercept
0.2 m
From
7.25 m
To
7.45 m
Intercept Depth
7.25 m

Classification

Program
exploration
Sample Type
drill
Group ID
SU26-11:7.25-7.45
Mining Method
unknown

QA/QC

QP Signed
Yes
QA/QC Methods
standards

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
50
Cutoff Unit
ppm eU₃O₈
Dilution Disclosed
Yes
Max Dilution
1 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This intercept confirms the presence of uranium mineralization at a low grade, contributing to the overall understanding of the extensive system.

Positive factors

  • QA/QC procedures for gamma logging are disclosed
  • Qualified Person has reviewed and approved the technical information

Negative factors

  • Grades are radiometric estimates (eU₃O₈) and not direct chemical measurements, with potential for radioactive disequilibrium
  • True widths of mineralization have not been determined
  • Individual intercept grades are generally low compared to typical uranium thresholds

Evidence · table

“51.8”

Context: 0.2

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "MORE MINING NEWS New Mineralised VMS System Discovered at Storm Exploration's Gold Standard Project Outcrop Silver Annou"

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.