Rainbow Rare Earths moves Uberaba project into pre-feasibility
Original announcement by proactiveinvestors on
- Company
- Rainbow Rare Earths Ltd
- Ticker
- RBW
- Exchange
- Unavailable
- Region
- Brazil
- Primary commodity
- Rare earths
- Secondary commodities
- Neodymium, Praseodymium
- Document categories
- Metallurgy, Agreement transaction
- Extracted
- 2026-09-07 07:32:49 UTC
Analysis by Minestarters Atlas
Minestarters Atlas analysis
Summary
Rainbow Rare Earths has commenced a Pre-Feasibility Study (PFS) for its Uberaba project in Brazil in collaboration with The Mosaic Company. The study aims to evaluate an on-site processing plant for phosphogypsum waste and includes the appointment of SRK Consulting to prepare a maiden JORC-compliant resource estimate.
Reasoning: The announcement marks a significant project milestone (moving to PFS) and involves a major industry partner (Mosaic), though it relies on a previous economic assessment rather than new assay results.
Positive factors
- Advancement to PFS stage
- Strategic partnership with Mosaic Company
- Strong economic indicators from previous assessment (NPV $916M)
- Proprietary technology application
Facts used in scoring: 1

Classification and evidence
QP/CP Signedpositive · Story-specific tag
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: SRK Consulting has been appointed to prepare the maiden JORC-compliant resource estimate.
Evidence · text
“SRK Consulting appointed to prepare its maiden JORC-compliant resource estimate”
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: only one composite was tested
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Metallurgical Results (1)
Fact 1rare_earthsHead Grade: 5100Head Grade Unit: ppmView all detailsHide details
Identity
- Commodity
- rare_earths
- Ticker
- RBW
Test Work
- Sample
- phosphogypsum waste feedstock
Recovery
- Head Grade
- 5100
- Head Grade Unit
- ppm
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-07T00:00:00.000Z
Reasoning: The grade is based on a previous model for the project feedstock.
Positive factors
- Significant feedstock volume (2.7Mt/y)
Evidence · text
“originally modelled at a head grade of roughly 5,100 parts per million total rare earth oxides”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.