# Q2 Metals Announces Inferred Mineral Resource Estimate on the Cisco Lithium Project with 295 Million Tonnes Grading 1.36% Li?O

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/q2-metals-announces-inferred-mineral-resource-estimate-on-the-cisco-lithium-proj--d9411fd1-3b31-4a9b-8f56-d264faa851e7

Original source: https://orestocks.com/company/QTWO.V/press-releases/8465009748606132

Publisher: orestocks

Original announcement: 2026-04-21T03:28:43.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-01T04:13:19.709Z

Atlas analysis updated: 2026-10-01T04:13:19.709Z

- Company: Q2 Metals Corp.

- Ticker: QTWO.V

- Exchange: Unavailable

- Region: Quebec, Canada

- Primary commodity: Lithium

- Secondary commodities: Tantalum

- Document categories: Resource update

- Extracted: 2026-10-01 04:13:21 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Q2 Metals has announced its inaugural NI 43-101 Inferred Mineral Resource Estimate for the Cisco Lithium Project in Quebec, totaling 295 million tonnes at 1.36% Li2O. The resource includes both open-pit and underground components and is accompanied by a conceptual exploration target of up to 67 Mt.

Reasoning: The announcement of an inaugural 295 Mt lithium resource at a strong grade of 1.36% Li2O is a major milestone, though the lack of Indicated/Measured material means it is still early-stage.

- Positive factor: Inaugural MRE establishes a significant scale for the project

- Positive factor: High grade of 1.36% Li2O for a 295 Mt resource

- Positive factor: Large true thickness potential \(up to 450m\)

- Positive factor: Exploration target indicates significant upside beyond current MRE

- Negative factor: 100% Inferred category limits economic confidence

- Negative factor: Conceptual nature of the exploration target

Facts used in scoring: 2

## Classification and evidence

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The company announced its inaugural NI 43-101 Inferred Mineral Resource Estimate.

Evidence · text

> Inaugural National Instrument 43-101 Inferred Mineral Resource Estimate

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The entire resource is classified as Inferred.

Evidence · text

> Inferred Mineral Resource Estimate

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The resource was prepared in accordance with NI 43-101 standards.

Evidence · text

> prepared in accordance with National Instrument 43-101

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Todd McCracken, P.Geo., is named as the independent Qualified Person who reviewed and approved the technical information.

Evidence · text

> The independent Qualified Person \(“ QP ”... is Todd McCracken, P.Geo.

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-metals-announces-inferred-mineral-resource-estimate-on-the-cisco-lithium-proj--d9411fd1-3b31-4a9b-8f56-d264faa851e7#fact-resource-facts-0)

Cisco Lithium Project · lithium

#### Identity

- Project: Cisco Lithium Project
- Commodity: lithium
- Region: canada\_qc
- Reported Region: Quebec, Canada
- Ticker: QTWO.V

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Todd McCracken
- Resource group id: resource:8bd49828f5867ce5ed6c
- Deposit or zone: Cisco Lithium Deposit
- Mining method: combined

#### Resource Data

- Category: inferred
- Tonnes: 270455000
- Grade: 1.36
- Grade Unit: %
- Contained Metal: 3683000
- Contained Unit: t
- Cutoff Grade: 0.4
- Cutoff Unit: % Li 2 O

#### Prior Estimate

- Resource Date: 2026-04-20

#### Lab

- Laboratory: SGS Canada

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-04-21T00:00:00.000Z

Reasoning: High grade and large tonnage for an inaugural inferred resource.

- Positive factor: Strong grade for an open pit resource

- Negative factor: Inferred category only

Evidence · table

> 1.36

Context: 270,455,000

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-metals-announces-inferred-mineral-resource-estimate-on-the-cisco-lithium-proj--d9411fd1-3b31-4a9b-8f56-d264faa851e7#fact-resource-facts-1)

Cisco Lithium Project · lithium

#### Identity

- Project: Cisco Lithium Project
- Commodity: lithium
- Region: canada\_qc
- Reported Region: Quebec, Canada
- Ticker: QTWO.V

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Todd McCracken
- Resource group id: resource:59267fd1214115c2199b
- Deposit or zone: Cisco Lithium Deposit
- Mining method: combined

#### Resource Data

- Category: inferred
- Tonnes: 24203000
- Grade: 1.34
- Grade Unit: %
- Contained Metal: 326000
- Contained Unit: t
- Cutoff Grade: 0.7
- Cutoff Unit: % Li 2 O

#### Prior Estimate

- Resource Date: 2026-04-20

#### Lab

- Laboratory: SGS Canada

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-04-21T00:00:00.000Z

Reasoning: Significant underground component identified in the inaugural MRE.

- Positive factor: Provides underground upside to the project

- Negative factor: Inferred category only

Evidence · table

> 1.34

Context: 24,203,000

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
