# Q2 logs 1.2% lithium at Cisco as PEA nears

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a

Original source: https://www.northernminer.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears/1003895525/

Publisher: northernminer

Original announcement: 2026-10-07T15:38:07.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-07T16:49:16.221Z

Atlas analysis updated: 2026-10-07T16:49:16.221Z

- Company: Q2 Metals

- Ticker: QTWO

- Exchange: Unavailable

- Region: Quebec

- Primary commodity: Lithium

- Secondary commodities: None reported

- Document categories: Drill results, Resource update

- Extracted: 2026-10-07 16:49:16 UTC

Narrative sentiment: 0.70 · Bullish

## Minestarters Atlas summary

Q2 Metals reported strong lithium drill results at the Cisco project in Quebec, including a 134.5m intercept at 1.2% Li2O that extends mineralization beyond the previous pit shell. The company is currently advancing toward a Preliminary Economic Assessment \(PEA\) expected this fall.

Reasoning: High-grade lithium intercepts reported that extend known mineralization by 100m outside the previous conceptual pit shell, supporting an upcoming PEA.

- Positive factor: Step-Out Extension

- Positive factor: Strong lithium grades

- Positive factor: Mineralization extended 100m

Facts used in scoring: 8

## Classification and evidence

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: Drilling extended known mineralization by 100 metres outside the conceptual pit shell.

Evidence · text

> extended known mineralization by 100 metres ahead of a preliminary economic assessment \(PEA\)

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The reported resource is entirely in the inferred category.

Evidence · text

> Cisco hosts 295 million inferred tonnes

## Extracted facts

Stored fact records: 8. Some facts used in scoring do not have a stored record.

## Drill Results (7)

### CS26-096

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-0)

Cisco · lithium

#### Identity

- Hole ID: CS26-096
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1.2
- Grade Unit: %
- Intercept: 134.5 m
- From: 11.8 m
- To: 146.3 m
- Intercept Depth: 11.8 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-096:11.8-146.3

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: Significant intercept extending mineralization 100m beyond the previous pit shell.

- Positive factor: Step-Out Extension

Evidence · text

> CS26-096 cut 134.5 metres grading 1.2% lithium oxide \(Li 2 O\) from 11.8 metres depth

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

### CS26-096

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-1)

Cisco · lithium

#### Identity

- Hole ID: CS26-096
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1.02
- Grade Unit: %
- Intercept: 101.6 m
- From: 11.8 m
- To: 113.4 m
- Intercept Depth: 11.8 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-096:11.8-113.4

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: High-grade sub-interval within the main intercept.

Evidence · text

> including 101.6 metres at 1.02% Li 2 O

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

### CS26-095

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-2)

Cisco · lithium

#### Identity

- Hole ID: CS26-095
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1.28
- Grade Unit: %
- Intercept: 70 m
- From: 162.8 m
- To: 232.8 m
- Intercept Depth: 162.8 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-095:162.8-232.8

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: Strong intercept confirming the main zone at the western margin.

Evidence · text

> CS26-095 that returned 70 metres at 1.28 % Li 2 O from 162.8 metres depth

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

### CS26-095

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-3)

Cisco · lithium

#### Identity

- Hole ID: CS26-095
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1
- Grade Unit: %
- Intercept: 31.3 m
- From: 162.8 m
- To: 194.1 m
- Intercept Depth: 162.8 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-095:162.8-194.1

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: High-grade sub-interval.

Evidence · text

> including 31.3 metres grading 1% Li 2 O

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

### CS26-095

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-4)

Cisco · lithium

#### Identity

- Hole ID: CS26-095
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1.33
- Grade Unit: %
- Intercept: 25.7 m
- From: 162.8 m
- To: 188.5 m
- Intercept Depth: 162.8 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-095:162.8-188.5

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: High-grade sub-interval.

Evidence · text

> and 25.7 metres at 1.33% Li 2 O

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

### CS26-094

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-5)

Cisco · lithium

#### Identity

- Hole ID: CS26-094
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1.53
- Grade Unit: %
- Intercept: 29.2 m
- From: 180.6 m
- To: 209.8 m
- Intercept Depth: 180.6 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-094:180.6-209.8

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: Strong grade intercept.

Evidence · text

> CS26-094 cut 29.2 metres grading 1.53% Li 2 O from 180.6 metres depth

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

### CS26-094

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-drill-facts-6)

Cisco · lithium

#### Identity

- Hole ID: CS26-094
- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: QTWO

#### Geometry

- Grade: 1.84
- Grade Unit: %
- Intercept: 19.3 m
- From: 180.6 m
- To: 199.9 m
- Intercept Depth: 180.6 m

#### Classification

- Program: mixed
- Sample Type: drill
- Group ID: CS26-094:180.6-199.9

#### Location

- Location: Main Zone
- Loc. Source: document

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: High-grade sub-interval.

Evidence · text

> and 19.3 metres at 1.84% Li 2 O

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "mixed"

## Resource Estimates (1)

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/q2-logs-1-2-lithium-at-cisco-as-pea-nears--f032e559-b41d-4174-8d3d-ede3b93aff1a#fact-resource-facts-7)

Cisco · lithium

#### Identity

- Project: Cisco
- Commodity: lithium
- Region: canada\_qc
- Reported Region: Quebec
- Ticker: QTWO

#### Resource scope

- Estimate type: resource
- Resource group id: resource:f3c5ccc7775250cfc288

#### Resource Data

- Category: inferred
- Tonnes: 295000000
- Grade: 1.36
- Grade Unit: % Li2O
- Contained Metal: 9900000
- Contained Unit: t lce

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-07T00:00:00.000Z

Reasoning: Large inferred resource reported in April.

- Positive factor: Large scale

- Negative factor: All Inferred

Evidence · text

> Cisco hosts 295 million inferred tonnes grading 1.36% Li 2 O for 9.9 million tonnes of lithium carbonate equivalent.

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
