PTN: Annual Report to shareholders

Original announcement by asx on

Company
Patronus Resources Limited
Ticker
PTN
Exchange
ASX
Region
Northern Territory, Western Australia
Primary commodity
Gold
Secondary commodities
Uranium, Zinc, Lead, Copper, Silver
Document categories
Resource update, Drill results, Agreement transaction, Other, Capital raise
Extracted
2026-09-29 23:48:48 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Patronus Resources Limited's annual report highlights a year of significant exploration success, with multiple high-grade gold intercepts reported across its Northern Territory and Western Australian projects, including bonanza grades at Tally Ho and Guppy. The company also announced ultra high-grade uranium results at Thunderball and entered into strategic transactions, including the divestment of its uranium rights and the acquisition of full ownership in the Guppy-Benalla area. Patronus maintains a strong financial position with $65.1 million in cash and investments to support its ongoing exploration programs.

Reasoning: The annual report showcases strong exploration results with numerous high-grade gold and uranium intercepts, alongside strategic corporate actions to streamline the portfolio and maintain a robust financial position, indicating positive progress and future potential.

Positive factors

  • Multiple high-grade gold intercepts reported across several projects, including bonanza grades at Tally Ho and Guppy, indicating significant exploration success and potential for resource growth.
  • Ultra high-grade uranium intercept at Thunderball demonstrates exceptional prospectivity, even as the company strategically divests these rights.
  • Strategic divestment of uranium exploration rights allows the company to focus on core gold and base metals assets while retaining exposure to uranium upside.
  • Acquisition of 100% ownership in the Guppy-Benalla area consolidates control over a promising gold prospect.
  • Strong cash and liquid assets position of $65.1 million provides financial flexibility for ongoing exploration and strategic opportunities.

Negative factors

  • The divestment of uranium rights is subject to various conditions and approvals, introducing some uncertainty.
  • Resource estimates presented in the report are historical and not new updates, limiting their novelty and immediate impact on valuation.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 44

Classification and evidence

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The intercept of 12m @ 12.41g/t Au at Guppy is exceptionally high-grade, well above the deposit-type norm for orogenic gold.

Evidence · text

“CA25AC100: 12m @ 12.41g/t Au from 20m”

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The intercept of 10.76m @ 2.95% U3O8 at Thunderball is exceptionally high-grade, well above the deposit-type norm for uranium.

Evidence · text

“10.76m @ 2.95% U3O8 from 87m”

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The sub-interval of 3m @ 9.7% U3O8 at Thunderball is exceptionally high-grade, well above the deposit-type norm for uranium.

Evidence · text

“3m @ 9.7% U3O8 from 88m”

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: All reported drill intercepts are given as downhole widths with no true width or drill orientation information, meaning apparent width may overstate true thickness.

Evidence · text

“2.61m @ 6.38g/t Au from 454m”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: The release does not explicitly disclose QA/QC procedures for the new drill results, meaning lab certification, CP/QP sign-off, and assay protocols cannot be checked from this document.

Evidence · text

“The diamond drilling is focused on advancing brownfields targets with resource growth potential, and RC drilling is targeting the high-priority geochemical anomalies identified during the surface sampling programme outlined above.”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Drilling at Tally Ho confirmed potential to extend mineralisation at depth below the existing Mineral Resource, and identified new structural targets for follow-up drilling.

Evidence · text

“Collectively, the programme has demonstrated the potential for additional mineralisation at depth while also identifying new structural targets for follow-up drilling.”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Drilling at Merlin extended the mineralised corridor a further 1.5km north of existing resources, indicating significant step-out potential.

Evidence · text

“These results confirm that the mineralised corridor extends a further 1.5km north of the existing Resources at Mertondale 3-4 and Mertondale North.”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Drilling at Gargamel extended the known strike a further 500m south, demonstrating continuation of mineralisation into a newly identified shallow lode system.

Evidence · text

“Located immediately south of Merton’s Reward, drilling at the Gargamel Prospect intersected near-surface mineralisation and extended the known strike a further 500m south.”

First-Pass Drillingpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: First-pass Reverse Circulation (RC) drilling at Golden Dyke returned shallow gold from the Davies No.2 prospect, marking the first modern drilling there in more than 30 years.

Evidence · text

“First-pass Reverse Circulation (RC) drilling at Golden Dyke returned shallow gold from the Davies No.2 prospect – the first modern drilling there in more than 30 years.”

First-Pass Drillingpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The Guppy target was initially an early-stage conceptual target with AC and RC drilling representing initial systematic testing.

Evidence · text

“The Guppy target sits 6km south of the Cardinia East resource area and was initially an early-stage conceptual target based on gold-arsenic auger soils anomalism in an area rich with historical shafts, pits, and more recent prospector ‘scrape and detect’ workings.”

Historical Estimate Onlynegative · Story-specific tag

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The resource estimates for Fountain Head, Tally Ho, Glencoe, Iron Blow, Mt Bonnie, and Hayes Creek are explicitly stated as being extracted from prior ASX announcements dating back to 2017-2022.

Evidence · text

“The information in this table that relates to the Mineral Resources for Fountain Head and Tally Ho have been extracted from the ASX announcement of PNX Metals Limited (PNX) on 16 June 2020 titled “Mineral Resource Update at Fountain Head””

JORC Compliantpositive · Story-specific tag

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: All resource estimates are explicitly stated as being reported in accordance with JORC 2012.

Evidence · text

“Mineral Resources reported in accordance with JORC 2012 using a 0.4 g/t Au cut-off within AUD2,600 optimisation shells1.”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The resource estimates are JORC 2012 compliant, which requires sign-off by a Competent Person.

Evidence · text

“The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from any of the original announcements.”

Strategic Divestmentpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company entered into a binding term sheet to sell its uranium exploration rights to Greenvale Energy, allowing it to focus on core gold and base metals assets.

Evidence · text

“During the June 2026 Quarter, Patronus signed a binding term sheet to sell the uranium exploration rights in the Pine Creek region to ASX-listed uranium explorer Greenvale Energy (ASX:GRV)”

Strategic Divestmentpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: Patronus divested the non-core Desdemona Project to CGN Resources Limited, consistent with its core focus on the Cardinia Gold Project and Pine Creek Project.

Evidence · text

“Patronus has divested the non-core Desdemona Project in Western Australia to CGN Resources Limited (ASX: CGR).”

Strategic Acquisitionpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: Patronus acquired the remaining 20% interest in the Guppy-Benalla area, securing 100% ownership and removing joint venture constraints for a promising gold prospect.

Evidence · text

“During the reporting period, Patronus acquired the remaining 20% interest in the Guppy-Benalla area for $250,000 in cash, securing 100% ownership and removing joint venture constraints.”

Extracted facts

Stored fact records: 40. Some facts used in scoring do not have a stored record.

Drill Results (9)

TH26DD004Fountain Head · goldGrade: 2.28Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
TH26DD004
Project
Fountain Head
Commodity
gold
Region
australia_nt
Reported Region
australia_nt
Ticker
PTN

Geometry

Grade
2.28
Grade Unit
g/t
Intercept
1 m
From
235 m
To
236 m
Intercept Depth
235 m

Classification

Program
exploration
Sample Type
drill
Group ID
TH26DD004:235-236

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A moderate-grade but narrow gold intercept, contributing to the overall positive exploration results at Tally Ho.

Positive factors

  • Moderate-grade gold intercept (2.28 g/t Au) is strong for an orogenic gold deposit.

Negative factors

  • Narrow intercept length (1.0m) limits overall contained metal.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“1.0m @ 2.28g/t Au from 235m (TH26DD004)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

THRD069Fountain Head · goldGrade: 59.88Grade Unit: g/tIntercept: 15.2 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
THRD069
Project
Fountain Head
Commodity
gold
Region
australia_nt
Reported Region
australia_nt
Ticker
PTN

Geometry

Grade
59.88
Grade Unit
g/t
Intercept
15.2 m
From
139 m
To
154.2 m
Intercept Depth
139 m

Classification

Program
exploration
Sample Type
drill
Group ID
THRD069:139-154.2

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2018-06-14T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: An exceptional historical gold intercept that highlights the high-grade potential of the Tally Ho deposit, though it is not new information.

Positive factors

  • Bonanza grade gold intercept (59.88 g/t Au) over a significant width (15.2m) is an exceptional historical result for an orogenic gold deposit.

Negative factors

  • This is a historical result and not new information from this report.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“15.2m @ 59.88g/t from 139m (THRD069)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

FHRC106Fountain Head · goldGrade: 25.94Grade Unit: g/tIntercept: 3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
FHRC106
Project
Fountain Head
Commodity
gold
Region
australia_nt
Reported Region
australia_nt
Ticker
PTN

Geometry

Grade
25.94
Grade Unit
g/t
Intercept
3 m
From
117 m
To
120 m
Intercept Depth
117 m

Classification

Program
exploration
Sample Type
drill
Group ID
FHRC106:117-120

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2019-11-21T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: An exceptional historical gold intercept that highlights the high-grade potential of the Fountain Head area, though it is not new information.

Positive factors

  • Bonanza grade gold intercept (25.94 g/t Au) is an exceptional historical result for an orogenic gold deposit.

Negative factors

  • This is a historical result and not new information from this report.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“3m @ 25.94g/t from 117m (FHRC106)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

FHRC156Fountain Head · goldGrade: 9.22Grade Unit: g/tIntercept: 14 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
FHRC156
Project
Fountain Head
Commodity
gold
Region
australia_nt
Reported Region
australia_nt
Ticker
PTN

Geometry

Grade
9.22
Grade Unit
g/t
Intercept
14 m
From
17 m
To
31 m
Intercept Depth
17 m

Classification

Program
exploration
Sample Type
drill
Group ID
FHRC156:17-31

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2020-03-16T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A strong historical gold intercept that highlights the high-grade potential of the Fountain Head area, though it is not new information.

Positive factors

  • High-grade gold intercept (9.22 g/t Au) over a significant width (14m) is a strong historical result for an orogenic gold deposit.

Negative factors

  • This is a historical result and not new information from this report.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“14m @ 9.22g/t from 17m (FHRC156)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

TB25DD007Thunderball Uranium · uraniumGrade: 0.04Grade Unit: %Intercept: 4.2 mView all details
Link to this fact

Identity

Hole ID
TB25DD007
Project
Thunderball Uranium
Commodity
uranium
Region
australia_nt
Reported Region
australia_nt
Ticker
PTN

Geometry

Grade
0.04
Grade Unit
%
Intercept
4.2 m
From
128 m
To
132.2 m
Intercept Depth
128 m

Classification

Program
exploration
Sample Type
drill
Group ID
TB25DD007:128-132.2

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A weak-grade uranium intercept over a moderate width, providing geological information but with limited economic significance on its own.

Positive factors

  • Weak-grade uranium intercept (0.04% U3O8) over a moderate width (4.2m) contributes to understanding the mineralisation footprint.

Negative factors

  • Grade is at the lower end of economic viability for uranium.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“4.2m @ 0.04% (456ppm) U3O8 from 128m”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

TPCRD093Thunderball Uranium · uraniumGrade: 0.7Grade Unit: %Intercept: 13 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
TPCRD093
Project
Thunderball Uranium
Commodity
uranium
Region
australia_nt
Reported Region
australia_nt
Ticker
PTN

Geometry

Grade
0.7
Grade Unit
%
Intercept
13 m
From
135 m
To
148 m
Intercept Depth
135 m

Classification

Program
exploration
Sample Type
drill
Group ID
TPCRD093:135-148

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2025-07-21T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A strong historical uranium intercept that highlights the high-grade potential of the Thunderball deposit, though it is not new information.

Positive factors

  • Strong grade uranium intercept (0.70% U3O8) over a significant width (13m) is a strong historical result.

Negative factors

  • This is a historical result and not new information from this report.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“TPCRD093:13m @ 0.70% (7,045ppm) U3O8 from 135m”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

RO25AC098Cardinia East · goldGrade: 1.04Grade Unit: g/tIntercept: 8 mView all details
Link to this fact

Identity

Hole ID
RO25AC098
Project
Cardinia East
Commodity
gold
Region
australia_wa
Reported Region
australia_wa
Ticker
PTN

Geometry

Grade
1.04
Grade Unit
g/t
Intercept
8 m
From
16 m
To
24 m
Intercept Depth
16 m

Classification

Program
exploration
Sample Type
drill
Group ID
RO25AC098:16-24

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A moderate-grade gold intercept at shallow depth over a good width, contributing to the positive results at The Royals Prospect.

Positive factors

  • Moderate-grade gold intercept (1.04 g/t Au) over a good width (8m) is a good result for an orogenic gold deposit.
  • Shallow depth (from 16m) indicates potential for open-pit mining.

Negative factors

  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“RO25AC098: 8m @ 1.04g/t Au from 16m”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

X424AC016Cardinia East · goldGrade: 1.69Grade Unit: g/tIntercept: 4 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
X424AC016
Project
Cardinia East
Commodity
gold
Region
australia_wa
Reported Region
australia_wa
Ticker
PTN

Geometry

Grade
1.69
Grade Unit
g/t
Intercept
4 m
From
44 m
To
48 m
Intercept Depth
44 m

Classification

Program
exploration
Sample Type
drill
Group ID
X424AC016:44-48

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2025-04-28T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A good historical gold intercept at shallow depth, highlighting the potential of the X4 Prospect, though it is not new information.

Positive factors

  • Moderate-grade gold intercept (1.69 g/t Au) over a good width (4m) is a good historical result for an orogenic gold deposit.
  • Shallow depth (from 44m) indicates potential for open-pit mining.

Negative factors

  • This is a historical result and not new information from this report.
  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“X424AC016: 4m @ 1.69g/t Au, from 44m”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

MT25RC015Mertondale North · goldGrade: 1.43Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MT25RC015
Project
Mertondale North
Commodity
gold
Region
australia_wa
Reported Region
australia_wa
Ticker
PTN

Geometry

Grade
1.43
Grade Unit
g/t
Intercept
4 m
From
37 m
To
41 m
Intercept Depth
37 m

Classification

Program
exploration
Sample Type
drill
Group ID
MT25RC015:37-41

QA/QC

QP Signed
No

Compositing

Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A moderate-grade gold intercept at shallow depth over a good width, contributing to the positive results at Gargamel.

Positive factors

  • Moderate-grade gold intercept (1.43 g/t Au) over a good width (4m) is a good result for an orogenic gold deposit.
  • Shallow depth (from 37m) indicates potential for open-pit mining.

Negative factors

  • True width not disclosed, so apparent width may overstate true thickness.
  • QA/QC procedures not explicitly detailed in this document.

Evidence · text

“MT25RC015: 4m @ 1.43g/t Au from 37m”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Resource Estimates (31)

inferredFountain Head Gold Project · goldGrade: 1.4Grade Unit: g/tContained Metal: 234000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Fountain Head Gold Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:bf6e4c3a4b9d37de2463

Resource Data

Category
inferred
Grade
1.4
Grade Unit
g/t
Contained Metal
234000
Contained Unit
oz
Cutoff Grade
0.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2020-03-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2020-03-16T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant gold resource of moderate size, providing a baseline for the project but lacking novelty as it is not a new update.

Positive factors

  • A combined resource of 234,000oz gold at 1.4 g/t Au is a moderate-sized resource for an orogenic gold deposit.
  • Reported under JORC standards, indicating a degree of reliability.

Negative factors

  • This is a historical resource estimate, not a new update, limiting its novelty.
  • The resource is likely predominantly Inferred, given the context of exploration, which carries lower confidence.
  • The effective date is several years old, raising concerns about data currency.

Evidence · text

“Fountain Head area comprises the Fountain Head, Tally Ho and Glencoe Deposits and hosts a combined Mineral Resource of 234,000oz at 1.4 g/t.”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 6.5 years before this release

indicatedHayes Creek VMS Project · zincTonnes: 2080000Grade: 5.49Grade Unit: %Contained Metal: 119Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:cdb6821af3f9760a1dc3
Deposit or zone
Iron Blow

Resource Data

Category
indicated
Tonnes
2080000
Grade
5.49
Grade Unit
%
Contained Metal
119
Contained Unit
kt
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
13.39
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong zinc grades, providing a baseline for the project but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong zinc grade (5.49%) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“5.49”

Context: 2.08

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · leadTonnes: 2080000Grade: 0.91Grade Unit: %Contained Metal: 18Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:cdb6821af3f9760a1dc3
Deposit or zone
Iron Blow

Resource Data

Category
indicated
Tonnes
2080000
Grade
0.91
Grade Unit
%
Contained Metal
18
Contained Unit
kt
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
13.39
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with lead as a byproduct, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.91”

Context: 2.08

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · copperTonnes: 2080000Grade: 0.3Grade Unit: %Contained Metal: 7Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:cdb6821af3f9760a1dc3
Deposit or zone
Iron Blow

Resource Data

Category
indicated
Tonnes
2080000
Grade
0.3
Grade Unit
%
Contained Metal
7
Contained Unit
kt
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
13.39
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with copper as a byproduct, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.30”

Context: 2.08

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · silverTonnes: 2080000Grade: 143Grade Unit: g/tContained Metal: 9.9Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:cdb6821af3f9760a1dc3
Deposit or zone
Iron Blow

Resource Data

Category
indicated
Tonnes
2080000
Grade
143
Grade Unit
g/t
Contained Metal
9.9
Contained Unit
moz
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
13.39
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong silver grades, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong silver grade (143 g/t) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“143”

Context: 2.08

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · goldTonnes: 2080000Grade: 2.19Grade Unit: g/tContained Metal: 171Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:cdb6821af3f9760a1dc3
Deposit or zone
Iron Blow

Resource Data

Category
indicated
Tonnes
2080000
Grade
2.19
Grade Unit
g/t
Contained Metal
171
Contained Unit
koz
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
13.39
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong gold grades, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong gold grade (2.19 g/t) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“2.19”

Context: 2.08

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · zincTonnes: 450000Grade: 1.11Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad507ab25448d0529bd1
Deposit or zone
Iron Blow

Resource Data

Category
inferred
Tonnes
450000
Grade
1.11
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
4.38
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lower zinc grades, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • Lower zinc grade (1.11%) compared to the Indicated category.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.11”

Context: 0.45

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · leadTonnes: 450000Grade: 0.18Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad507ab25448d0529bd1
Deposit or zone
Iron Blow

Resource Data

Category
inferred
Tonnes
450000
Grade
0.18
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
4.38
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lead as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.18”

Context: 0.45

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · copperTonnes: 450000Grade: 0.07Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad507ab25448d0529bd1
Deposit or zone
Iron Blow

Resource Data

Category
inferred
Tonnes
450000
Grade
0.07
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
4.38
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with copper as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.07”

Context: 0.45

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · silverTonnes: 450000Grade: 27Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad507ab25448d0529bd1
Deposit or zone
Iron Blow

Resource Data

Category
inferred
Tonnes
450000
Grade
27
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
4.38
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lower silver grades, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • Lower silver grade (27 g/t) compared to the Indicated category.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“27”

Context: 0.45

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · goldTonnes: 450000Grade: 1.71Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad507ab25448d0529bd1
Deposit or zone
Iron Blow

Resource Data

Category
inferred
Tonnes
450000
Grade
1.71
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
4.38
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with gold as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.71”

Context: 0.45

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · zincTonnes: 1380000Grade: 3.96Grade Unit: %Contained Metal: 58Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5f4746755c22a2f15d93
Deposit or zone
Mt Bonnie

Resource Data

Category
indicated
Tonnes
1380000
Grade
3.96
Grade Unit
%
Contained Metal
58
Contained Unit
kt
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
9.87
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong zinc grades, providing a baseline for the project but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong zinc grade (3.96%) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“3.96”

Context: 1.38

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

indicatedHayes Creek VMS Project · leadTonnes: 1380000Grade: 1.15Grade Unit: %Contained Metal: 17Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5f4746755c22a2f15d93
Deposit or zone
Mt Bonnie

Resource Data

Category
indicated
Tonnes
1380000
Grade
1.15
Grade Unit
%
Contained Metal
17
Contained Unit
kt
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
9.87
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with lead as a byproduct, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.15”

Context: 1.38

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

indicatedHayes Creek VMS Project · copperTonnes: 1380000Grade: 0.23Grade Unit: %Contained Metal: 3Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5f4746755c22a2f15d93
Deposit or zone
Mt Bonnie

Resource Data

Category
indicated
Tonnes
1380000
Grade
0.23
Grade Unit
%
Contained Metal
3
Contained Unit
kt
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
9.87
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with copper as a byproduct, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.23”

Context: 1.38

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

indicatedHayes Creek VMS Project · silverTonnes: 1380000Grade: 128Grade Unit: g/tContained Metal: 6.3Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5f4746755c22a2f15d93
Deposit or zone
Mt Bonnie

Resource Data

Category
indicated
Tonnes
1380000
Grade
128
Grade Unit
g/t
Contained Metal
6.3
Contained Unit
moz
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
9.87
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong silver grades, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong silver grade (128 g/t) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“128”

Context: 1.38

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

indicatedHayes Creek VMS Project · goldTonnes: 1380000Grade: 1.41Grade Unit: g/tContained Metal: 69Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5f4746755c22a2f15d93
Deposit or zone
Mt Bonnie

Resource Data

Category
indicated
Tonnes
1380000
Grade
1.41
Grade Unit
g/t
Contained Metal
69
Contained Unit
koz
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
9.87
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with moderate gold grades, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Moderate gold grade (1.41 g/t) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.41”

Context: 1.38

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

inferredHayes Creek VMS Project · zincTonnes: 170000Grade: 2.11Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9b5250c5e6d53f9fd7d9
Deposit or zone
Mt Bonnie

Resource Data

Category
inferred
Tonnes
170000
Grade
2.11
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
6.73
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lower zinc grades, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • Lower zinc grade (2.11%) compared to the Indicated category.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“2.11”

Context: 0.17

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

inferredHayes Creek VMS Project · leadTonnes: 170000Grade: 0.87Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9b5250c5e6d53f9fd7d9
Deposit or zone
Mt Bonnie

Resource Data

Category
inferred
Tonnes
170000
Grade
0.87
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
6.73
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lead as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.87”

Context: 0.17

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

inferredHayes Creek VMS Project · copperTonnes: 170000Grade: 0.16Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9b5250c5e6d53f9fd7d9
Deposit or zone
Mt Bonnie

Resource Data

Category
inferred
Tonnes
170000
Grade
0.16
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
6.73
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with copper as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.16”

Context: 0.17

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

inferredHayes Creek VMS Project · silverTonnes: 170000Grade: 118Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9b5250c5e6d53f9fd7d9
Deposit or zone
Mt Bonnie

Resource Data

Category
inferred
Tonnes
170000
Grade
118
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
6.73
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with silver as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“118”

Context: 0.17

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

inferredHayes Creek VMS Project · goldTonnes: 170000Grade: 0.8Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9b5250c5e6d53f9fd7d9
Deposit or zone
Mt Bonnie

Resource Data

Category
inferred
Tonnes
170000
Grade
0.8
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
% Zn

Prior Estimate

Resource Date
2017-02-08

Metal Equivalent

Metal Eq. Grade
6.73
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-02-08T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with gold as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.80”

Context: 0.17

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.6 years before this release

indicatedHayes Creek VMS Project · zincTonnes: 3460000Grade: 4.88Grade Unit: %Contained Metal: 177Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:268a9ce4950c4c824858
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
indicated
Tonnes
3460000
Grade
4.88
Grade Unit
%
Contained Metal
177
Contained Unit
kt

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
11.99
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong zinc grades, providing a baseline for the project but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong zinc grade (4.88%) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“4.88”

Context: 3.46

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · leadTonnes: 3460000Grade: 1.01Grade Unit: %Contained Metal: 37Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:268a9ce4950c4c824858
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
indicated
Tonnes
3460000
Grade
1.01
Grade Unit
%
Contained Metal
37
Contained Unit
kt

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
11.99
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with lead as a byproduct, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.01”

Context: 3.46

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · copperTonnes: 3460000Grade: 0.27Grade Unit: %Contained Metal: 10Contained Unit: ktHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:268a9ce4950c4c824858
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
indicated
Tonnes
3460000
Grade
0.27
Grade Unit
%
Contained Metal
10
Contained Unit
kt

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
11.99
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with copper as a byproduct, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.27”

Context: 3.46

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · silverTonnes: 3460000Grade: 137Grade Unit: g/tContained Metal: 16Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:268a9ce4950c4c824858
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
indicated
Tonnes
3460000
Grade
137
Grade Unit
g/t
Contained Metal
16
Contained Unit
moz

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
11.99
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong silver grades, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong silver grade (137 g/t) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“137.00”

Context: 3.46

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

indicatedHayes Creek VMS Project · goldTonnes: 3460000Grade: 1.88Grade Unit: g/tContained Metal: 238Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:268a9ce4950c4c824858
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
indicated
Tonnes
3460000
Grade
1.88
Grade Unit
g/t
Contained Metal
238
Contained Unit
koz

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
11.99
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Indicated resource with strong gold grades, providing context but lacking novelty due to its age.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Strong gold grade (1.88 g/t) for a VMS deposit.
  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.88”

Context: 3.46

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · zincTonnes: 620000Grade: 1.39Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
zinc
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:628ce9344e682d275d85
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
inferred
Tonnes
620000
Grade
1.39
Grade Unit
%

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
5.03
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lower zinc grades, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • Lower zinc grade (1.39%) compared to the Indicated category.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.39”

Context: 0.62

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · leadTonnes: 620000Grade: 0.37Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
lead
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:628ce9344e682d275d85
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
inferred
Tonnes
620000
Grade
0.37
Grade Unit
%

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
5.03
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lead as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.37”

Context: 0.62

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · copperTonnes: 620000Grade: 0.1Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
copper
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:628ce9344e682d275d85
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
inferred
Tonnes
620000
Grade
0.1
Grade Unit
%

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
5.03
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with copper as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“0.10”

Context: 0.62

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · silverTonnes: 620000Grade: 52Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
silver
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:628ce9344e682d275d85
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
inferred
Tonnes
620000
Grade
52
Grade Unit
g/t

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
5.03
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with lower silver grades, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • Lower silver grade (52 g/t) compared to the Indicated category.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“52.00”

Context: 0.62

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

inferredHayes Creek VMS Project · goldTonnes: 620000Grade: 1.46Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Hayes Creek VMS Project
Commodity
gold
Region
australia_nt
Reported Region
Northern Territory
Ticker
PTN

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:628ce9344e682d275d85
Deposit or zone
Iron Blow + Mt Bonnie

Resource Data

Category
inferred
Tonnes
620000
Grade
1.46
Grade Unit
g/t

Prior Estimate

Resource Date
2017-05-03

Metal Equivalent

Metal Eq. Grade
5.03
Metal Eq. Unit
% ZnEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2017-05-03T00:00:00.000Z

Dates

Event date
2026-09-29T00:00:00.000Z

Reasoning: A historical JORC-compliant Inferred resource with gold as a byproduct, providing context but with limited confidence and novelty due to its age and category.

Positive factors

  • Reported under JORC standards, indicating reliability.
  • Metal equivalent assumptions are disclosed.

Negative factors

  • This is a historical resource estimate from 2017, limiting its novelty.
  • Inferred category carries lower geological confidence.
  • The effective date is significantly old, raising concerns about data currency.

Evidence · table

“1.46”

Context: 0.62

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.4 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.