PSL: Annual Report to shareholders

Original announcement by asx on

Company
Paterson Resources Limited
Ticker
PSL
Exchange
ASX
Region
Western Australia
Primary commodity
Gold
Secondary commodities
Copper
Document categories
Resource update, Metallurgy, Other
Extracted
2026-09-30 09:28:33 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Paterson Resources Limited announced a significant update to its Grace Gold-Copper Project's Mineral Resource Estimate, increasing contained gold by 189.8% to 200,000 ounces at a higher grade of 1.79 g/t Au. Preliminary metallurgical test work indicates high gold recoveries of up to 96.7% using conventional processing. The company plans further drilling to upgrade the resource and advance a Scoping Study.

Reasoning: Paterson Resources Limited reported a substantial increase in its Grace Gold-Copper Project's Mineral Resource Estimate, with contained gold nearly tripling and average grade improving significantly. This is complemented by very high preliminary gold recoveries, indicating positive project economics, despite the resource remaining largely Inferred and the metallurgical work being preliminary.

Positive factors

  • Significant increase in contained gold (189.8%) and tonnage (117.6%) in the updated Mineral Resource Estimate.
  • Average resource grade improved by 32.6% in the updated MRE.
  • Preliminary metallurgical test work indicates exceptional gold recoveries of up to 96.7% using conventional processing.
  • The resource estimate is JORC 2012 compliant.

Negative factors

  • The updated MRE is still predominantly in the Inferred category, indicating lower geological confidence.
  • Metallurgical test work is preliminary, implying bench-scale, which has lower predictive power for commercial operations.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 3

Classification and evidence

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The MRE was significantly increased during the year to 3.46Mt @ 1.79g/t Au for 200,000oz of contained gold, representing a 189.8% increase in contained gold.

Evidence · text

“The MRE was significantly increased during the year to 3.46Mt @ 1.79g/t Au for 200,000oz of contained gold.”

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The updated MRE shows an increase of 1.87 Mt in tonnage compared to the prior estimate.

Evidence · table

“+1.87”

Context: Increase

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: The updated MRE shows an increase of 0.44 g/t Au in grade compared to the prior estimate.

Evidence · table

“+0.44”

Context: Increase

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The company is working towards establishing a JORC 2012 compliant resource and the MRE is presented in comparison to a JORC 2012 estimate.

Evidence · text

“working towards establishing a JORC 2012 compliant resource”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The prior resource was an Inferred Mineral Resource, and the drilling campaign is designed to 'extend the classification to a JORC 2012 Indicated MRE', implying the current MRE is still predominantly Inferred.

Evidence · text

“Inferred Mineral Resource of 1.59Mt @ 1.35g/t Au for 69,000oz”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Indicative recoveries up to 96.7% for gold mineralisation are considered exceptional for conventional processing.

Evidence · text

“indicative recoveries up to 96.7%”

Free Millingpositive

Simple, clean ore amenable to standard processing without oxidation.

Why it applies: Gold mineralisation is indicated to be amenable to conventional processing.

Evidence · text

“gold mineralisation is amenable to conventional processing”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The test work is described as 'Preliminary metallurgical test work', suggesting it is not yet at a pilot or locked-cycle scale.

Evidence · text

“Preliminary metallurgical test work”

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

inferredGrace Gold-Copper Project · goldTonnes: 1590000Grade: 1.35Grade Unit: g/tContained Metal: 69000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Grace Gold-Copper Project
Commodity
gold
Region
australia_wa
Reported Region
Paterson Province, Western Australia
Ticker
PSL

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:bae29d000ce882f1366e

Resource Data

Category
inferred
Tonnes
1590000
Grade
1.35
Grade Unit
g/t
Contained Metal
69000
Contained Unit
oz

Prior Estimate

Resource Date
2020-05-22

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2020-05-22T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This is a historical resource estimate provided for comparison with the new update.

Evidence · text

“The historic drilling has allowed the calculation of an Inferred Mineral Resource of 1.59Mt @ 1.35g/t Au for 69,000oz, as outlined in Table A (PSL ASX Announcement 22 May 2020 – Entitlement Issue Prospectus).”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 6.4 years before this release

inferredGrace Gold-Copper Project · goldTonnes: 3460000Grade: 1.79Grade Unit: g/tContained Metal: 200000Contained Unit: ozView all details
Link to this fact

Identity

Project
Grace Gold-Copper Project
Commodity
gold
Region
australia_wa
Reported Region
Paterson Province, Western Australia
Ticker
PSL

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:84716232c806e6a478bb
Resource basis
gross

Resource Data

Category
inferred
Tonnes
3460000
Grade
1.79
Grade Unit
g/t
Contained Metal
200000
Contained Unit
oz

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
1590000
Prior Grade
1.35
Prior Contained Metal
69000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The updated Mineral Resource Estimate shows a substantial increase in contained gold and tonnage, along with an improved average grade, representing significant growth for the project.

Positive factors

  • Significant increase in contained gold (189.8%) and tonnage (117.6%) compared to the prior estimate.
  • Average resource grade improved by 32.6% compared to the prior estimate.
  • The resource estimate is JORC 2012 compliant.

Negative factors

  • The updated MRE is still predominantly in the Inferred category, indicating lower geological confidence.

Evidence · table

“3.46”

Context: 2026 Updated MRE

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 3460000 against 1590000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.79 against 1.35 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 200000 against 69000 previously

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

Metallurgical Results (1)

Fact 1Grace Gold-Copper Project · goldRecovery: 96.7 %View all details
Link to this fact

Identity

Project
Grace Gold-Copper Project
Commodity
gold
Region
australia_wa
Reported Region
Paterson Province, Western Australia
Ticker
PSL

Test Work

Program Status
preliminary
Processing Route
conventional processing

Recovery

Recovery
96.7 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: Preliminary metallurgical test work shows very high gold recoveries, which is a strong positive indicator for the project's economic viability, although the preliminary nature of the tests warrants some caution.

Positive factors

  • Exceptional gold recovery of 96.7% is indicated, which is above the exceptional band for conventional processing.
  • Gold mineralisation is amenable to conventional processing, suggesting a free-milling ore type.

Negative factors

  • The test work is described as 'preliminary', implying it is likely bench-scale and may not fully represent commercial performance.

Evidence · text

“Preliminary metallurgical test work indicates gold mineralisation is amenable to conventional processing, with indicative recoveries up to 96.7%.”

Tags used in scoring

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 96.7% is at or above the exceptional band (95%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.