# Platinum Group Metals Ltd. Files Waterberg Independent Definitive Feasibility Study Update Technical Report

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/platinum-group-metals-ltd-files-waterberg-independent-definitive-feasibility-stu--040bbe32-8287-48ba-b325-0fd3c2ee3731

Original source: https://money.tmx.com/en/quote/PTM/news/7082621776817642/platinum-group-metals-ltd-files-waterberg-independent-definitive-feasibility-stu

Publisher: tmx

Original announcement: 2024-10-09T21:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Platinum Group Metals Ltd.

- Ticker: PTM

- Exchange: TSX

- Region: South Africa

- Primary commodity: Platinum

- Secondary commodities: Palladium, Nickel, Gold, Copper

- Document categories: Resource update

- Extracted: 2026-08-22 07:07:40 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Platinum Group Metals Ltd. has filed its Independent Definitive Feasibility Study \(DFS\) Technical Report for the Waterberg Project in South Africa. The report, prepared by multiple Qualified Persons, supports an updated independent mineral resource estimate effective August 31, 2024.

Reasoning: The company has filed its Definitive Feasibility Study \(DFS\) technical report, a major project milestone. While the document announces the filing of the report rather than providing new numeric resource totals in the text, it confirms the completion of the DFS and the associated updated mineral resource estimate.

- Positive factor: NI 43-101 compliance

- Positive factor: QP sign-off

- Positive factor: DFS milestone

Facts used in scoring: 0

## Classification and evidence

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The technical report was filed in compliance with National Instrument 43-101 Standards of Disclosure for Mineral Projects.

Evidence · text

> filed the associated technical report \(the " DFS Technical Report "\) in compliance with National Instrument 43-101 Standards of Disclosure for Mineral Projects

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Multiple Qualified Persons \(Michael Murphy, Charles Muller, and Gordon Cunningham\) are named as having prepared the report.

Evidence · text

> each being a Qualified Person within the meaning of NI 43-101

## Extracted facts

Stored fact records: 0. Some facts used in scoring do not have a stored record.

No stored fact records are available for this extraction.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
