# Pilot Mountain Tungsten Project, US

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/pilot-mountain-tungsten-project-us--74c2a8fe-e57f-4312-b007-02effe0f5faa

Original source: https://www.mining-technology.com/projects/pilot-mountain-tungsten-project-us/

Publisher: miningtechnology

Original announcement: 2026-10-08T04:45:44.532Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-08T04:46:46.404Z

Atlas analysis updated: 2026-10-08T04:46:46.404Z

- Company: Guardian Metal Resources

- Ticker: Unavailable

- Exchange: Unavailable

- Region: Nevada, US

- Primary commodity: Tungsten

- Secondary commodities: Silver, Zinc

- Document categories: Resource update

- Extracted: 2026-10-08 04:46:47 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Guardian Metal Resources has reported probable mineral reserves for the Pilot Mountain tungsten project in Nevada, estimated at 11.82 million tonnes. The reserves grade 0.17% tungsten trioxide, 9.28 g/t silver, and 0.28% zinc, supported by a completed Pre-Feasibility Study.

Reasoning: The document reports probable mineral reserves from a completed Pre-Feasibility Study \(PFS\) with significant contained metal scale.

- Positive factor: Probable reserves established

- Positive factor: Significant contained tungsten trioxide

- Positive factor: PFS completed

- Negative factor: Low tungsten grade \(0.17% WO3\)

Facts used in scoring: 3

## Classification and evidence

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document explicitly states probable mineral reserves of 11.82mt.

Evidence · text

> The probable mineral reserves at the Pilot Mountain tungsten project are estimated to be 11.82 million tonnes \(mt\)

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: The reserves are part of a completed Pre-Feasibility Study \(PFS\).

Evidence · text

> A pre-feasibility study \(PFS\) for the project was completed in June 2026

## Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

## Resource Estimates (3)

### probable

[Link to this fact](https://atlas-staging.minestarters.com/news/pilot-mountain-tungsten-project-us--74c2a8fe-e57f-4312-b007-02effe0f5faa#fact-resource-facts-0)

Pilot Mountain · tungsten

#### Identity

- Project: Pilot Mountain
- Commodity: tungsten
- Region: usa\_nv
- Reported Region: Nevada, US

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:efbc6edb497222143cbd
- Deposit or zone: Pilot Mountain
- Mining method: combined

#### Resource Data

- Category: probable
- Tonnes: 11820000
- Grade: 0.17
- Grade Unit: %
- Contained Metal: 20275
- Contained Unit: t

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-08T00:00:00.000Z

Reasoning: Probable reserve grade of 0.17% WO3 is relatively low but supported by large tonnage.

- Positive factor: Significant contained metal

- Negative factor: Low grade

Evidence · text

> The probable mineral reserves at the Pilot Mountain tungsten project are estimated to be 11.82 million tonnes \(mt\) grading 0.17% tungsten trioxide

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-staging.minestarters.com/news/pilot-mountain-tungsten-project-us--74c2a8fe-e57f-4312-b007-02effe0f5faa#fact-resource-facts-1)

Pilot Mountain · silver

#### Identity

- Project: Pilot Mountain
- Commodity: silver
- Region: usa\_nv
- Reported Region: Nevada, US

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:efbc6edb497222143cbd
- Deposit or zone: Pilot Mountain
- Mining method: combined

#### Resource Data

- Category: probable
- Tonnes: 11820000
- Grade: 9.28
- Grade Unit: g/t
- Contained Metal: 3529
- Contained Unit: koz

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-08T00:00:00.000Z

Reasoning: Silver reported as a byproduct in the reserve estimate.

- Positive factor: Significant silver byproduct

Evidence · text

> 9.28 grams per tonne silver ... with contained metals at ... 3,529koz of silver

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-staging.minestarters.com/news/pilot-mountain-tungsten-project-us--74c2a8fe-e57f-4312-b007-02effe0f5faa#fact-resource-facts-2)

Pilot Mountain · zinc

#### Identity

- Project: Pilot Mountain
- Commodity: zinc
- Region: usa\_nv
- Reported Region: Nevada, US

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:efbc6edb497222143cbd
- Deposit or zone: Pilot Mountain
- Mining method: combined

#### Resource Data

- Category: probable
- Tonnes: 11820000
- Grade: 0.28
- Grade Unit: %
- Contained Metal: 33396
- Contained Unit: t

#### Prior Estimate

- Resource Date: 2026-06-30

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-08T00:00:00.000Z

Reasoning: Zinc reported as a byproduct in the reserve estimate.

- Positive factor: Zinc byproduct

Evidence · text

> 0.28% zinc, with contained metals at ... 33,396t of zinc

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
