Summary

OzAurum has completed Stage 1 water bore construction and secured five key permits for the Mulgabbie North Gold Project. While record rainfall has delayed site works and plant transport, the company is preparing to commence fresh rock metallurgical testwork to evaluate project expansion.

Reasoning: The update provides significant de-risking via permitting and water supply, though operational timelines are hampered by weather and infrastructure issues.

Positive factors

  • Completion of production water bores for Stage 1
  • Five key permits approved including Works Approval
  • Potential for fresh rock expansion in Stages 2 and 3
  • Strong interest in Patricia Gold Project divestment

Negative factors

  • Record rainfall causing site civil works and plant transport delays
  • Road infrastructure (Pinjin Tropicana) in disrepair

Facts used in scoring: 1

Classification and evidence

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: The project is being developed via a low-capex heap leach pathway.

Evidence · text

“low-capex heap leach development pathway”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The metallurgical results are from a column leach test, which is a screening-level test.

Evidence · text

“The Competent Person considers these results to be indicative, but not an absolute measure”

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Metallurgical Results (1)

column leachMulgabbie North Gold Project · goldRecovery: 75 %Head Grade: 2.5Head Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mulgabbie North Gold Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
OZM

Test Work

Program Status
optimization
Test Type
column leach
Processing Route
heap leach
Sample
paleochannel column MNODH 022
Leach Time
552 hours

Recovery

Recovery
75 %
Recovery Basis
actual_test
Head Grade
2.5
Head Grade Unit
g/t

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-08T00:00:00.000Z

Dates

Event date
2026-10-13T00:00:00.000Z

Reasoning: Historical result from July 2026 showing 75% recovery in 23 days.

Positive factors

  • Rapid early recovery is commercially important

Evidence · text

“delivered ~75% recovery in 23 days (assay grade 2.50 g/t Au)”

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 75% is at or above the exceptional band (75%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.