MKR: First Gold Revenues from Wonawinta
Original announcement by asx on
- Company
- Manuka Resources Limited
- Ticker
- MKR
- Exchange
- ASX
- Region
- Cobar Basin, NSW
- Primary commodity
- Gold
- Secondary commodities
- Silver
- Document categories
- Metallurgy, Production
- Extracted
- 2026-10-01 00:15:35 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Manuka Resources has received its first gold revenues following the restart of operations at the Wonawinta processing facility. The plant is currently ramping up processing of Mt Boppy material at approximately 1,750t/day with gold recoveries around 75%.
Reasoning: The announcement marks a major operational milestone with the transition from plant recommissioning to actual revenue generation.
Positive factors
- First gold revenues received
- Consistent processing for over five weeks
- Ramping up to 1,750t/day
- Transition to gold-silver producer underway
Facts used in scoring: 1
Classification and evidence
Production Milestonepositive · Story-specific tag
No canonical definition is currently available.
Why it applies: First gold revenues received following plant restart
Evidence · text
“First gold revenues received following the restart of operations at Wonawinta”
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: only one composite was tested
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Metallurgical Results (1)
mill routeWonawinta · goldRecovery: 75 %Head Grade: 1Head Grade Unit: g/tView all detailsHide details
Identity
- Project
- Wonawinta
- Commodity
- gold
- Region
- cobar basin, nsw
- Reported Region
- Cobar Basin, NSW
- Ticker
- MKR
Test Work
- Program Status
- optimization
- Test Type
- mill route
- Processing Route
- carbon in the leach circuit
- Sample
- Mt Boppy material (ROM and rock dumps)
Recovery
- Recovery
- 75 %
- Recovery Basis
- actual_test
- Head Grade
- 1
- Head Grade Unit
- g/t
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-30T00:00:00.000Z
Reasoning: Steady production metrics reported during ramp-up phase.
Positive factors
- Consistent processing achieved
- Ramping up to 1,750t/day
Evidence · text
“ramping up processing of Mt Boppy material... to a rate of 1,750t/day at a head grade of ~1.0 g/t Au, with recoveries of approximately 75%”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: 75% is below the weak band (80%)
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.