Mineros Delivers Record Q1 2026: Revenue of $291.8 Million and Adjusted EBITDA of $154.1 Million on Higher Production and Gold Prices
Original announcement by tmx on
- Company
- Mineros S.A.
- Ticker
- MSA
- Exchange
- TSX
- Region
- Unavailable
- Primary commodity
- Gold
- Secondary commodities
- Silver, Zinc, Copper
- Document categories
- Production, Resource update
- Extracted
- 2026-08-25 22:47:23 UTC
Analysis by Minestarters Atlas
Minestarters Atlas analysis
Summary
Mineros S.A. reported record Q1 2026 financial results, including $291.8 million in revenue and $154.1 million in Adjusted EBITDA, driven by higher gold prices and a 7% increase in gold production to 57,850 ounces. The company also saw a 109% increase in silver production and reported updated Mineral Reserves and Resources for its Porvenir, Guillermina, Leticia, San Antonio, and Luna Roja deposits, while advancing its exploration programs.
Reasoning: Mineros S.A. reported record Q1 2026 financial results, driven by higher gold prices and increased production, with costs tracking below guidance. The company also provided significant updates on its Mineral Reserves and Resources for several key projects and is actively advancing its exploration and development pipeline.
Positive factors
- Record Revenue and Earnings
- Higher Gold Production
- Increased Silver Production and Price
- Costs Tracking Below Guidance
- Strong Balance Sheet with Gold-Backed Assets
- Advanced Porvenir PFS with Compelling Economics
- Significant Resource Updates for Multiple Projects
- Ongoing Exploration and Development
Negative factors
- Increased Net Cash Used in Operating Activities
- Increased LTIFR at Nechí Property
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 59

Classification and evidence
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The scientific and technical information has been reviewed and approved by Luis Fernando Ferreira de Oliveira, MAusIMM CP (Geo), who is a qualified person within the meaning of National Instrument 43-101.
Evidence · text
“The scientific and technical information contained in this news release has been reviewed and approved by Luis Fernando Ferreira de Oliveira, MAusIMM CP (Geo), Mineral Resources and Reserves Manager for Mineros S.A., who is a qualified person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects .”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimates are stated to be compliant with National Instrument 43-101 standards.
Evidence · text
“The scientific and technical information contained in this news release has been reviewed and approved by Luis Fernando Ferreira de Oliveira, MAusIMM CP (Geo), Mineral Resources and Reserves Manager for Mineros S.A., who is a qualified person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects .”
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The Porvenir Project includes Proven Mineral Reserves, indicating a high level of confidence.
Evidence · text
“Proven Mineral Reserves: 650 kt averaging 3.50 g/t Au, 14.07 g/t Ag, 2.54% Zn and 0.50% Cu, containing 73 koz Au, 294 koz Ag, 36 Mlb Zn, and 7 Mlb Cu.”
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The Porvenir Project includes Probable Mineral Reserves, indicating a good level of confidence.
Evidence · text
“Probable Mineral Reserves: 5,827 kt averaging 2.79 g/t Au, 12.07 g/t Ag, 2.61% Zn and 0.35% Cu, containing 523 koz Au, 2,261 koz Ag, 336 Mlb Zn and 45 Mlb Cu.”
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The Guillermina and Leticia Deposits include Indicated Mineral Resources, indicating a reasonable level of geological confidence.
Evidence · text
“Indicated Mineral Resources of 1,763 kt grading 0.97 g/t Au, 27.33 g/t Ag, 0.21% Cu, and 6.61% Zn, containing 55 koz Au, 1,549 koz Ag, 8 Mlb Cu, and 257 Mlb Zn;”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The Guillermina, Leticia, and San Antonio Deposits, and Luna Roja include Inferred Mineral Resources, which is a speculative category with limited drilling.
Evidence · text
“Inferred Mineral Resources of 1,118 kt grading 1.44 g/t Au, 30.15 g/t Ag, 0.17% Cu, and 5.50% Zn, containing 52 koz Au, 1,084 koz Ag, 4 Mlb Cu, and 136 Mlb Zn.”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document provides updated Mineral Reserves and Resources for several projects as of December 31, 2025.
Evidence · text
“Updated Mineral Reserves for the Porvenir Project as of December 31, 2025:”
Extracted facts
Stored fact records: 0. Some facts used in scoring do not have a stored record.
No stored fact records are available for this extraction.
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.