Metallurgical Optimisation Delivers High Recoveries 3 pages 362.0KB

Original announcement by asx on

Company
Aurora Energy Metals Limited
Ticker
1AE
Exchange
ASX
Region
southeast Oregon, USA
Primary commodity
Uranium
Secondary commodities
None reported
Document categories
Metallurgy
Extracted
2026-10-01 04:40:15 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Aurora Energy Metals Limited announced highly positive results from its metallurgical optimisation program for the Aurora Uranium Project. The program confirmed high uranium recoveries in the 82-86% range, while dramatically reducing initial acid addition and overall acid consumption, and halving leach duration. The testwork also simplified the flowsheet by demonstrating co-processing of clay and middlings, and eliminated the need for ferric sulphate, all of which are expected to significantly improve project economics.

Reasoning: The metallurgical optimisation program delivered high uranium recoveries (82-86%) while significantly reducing reagent consumption (acid, ferric sulphate), shortening leach times, and simplifying the processing flowsheet. These improvements are expected to materially enhance the project's economics and de-risk future studies.

Positive factors

  • Significantly reduced acid consumption (initial and overall)
  • Reduced leach duration by 50%
  • Elimination of ferric sulphate requirement
  • Simplified flowsheet by processing clay and middlings together
  • Demonstrated potential for further cost savings through leach solution recycling
  • High uranium recoveries consistently achieved

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 19

Classification and evidence

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: The optimisation program confirmed uranium recoveries in the high 80% range (82–86%), with several tests achieving over 88% and even 90% recovery, which is in the strong to exceptional band for uranium.

Evidence · text

“uranium recoveries in the high 80% range (82–86%) can be consistently achieved under optimised conditions”

Recovery Improvingpositive

Recovery improved versus a like-for-like prior test program on the same domain and route.

Why it applies: The program achieved recovery with significantly reduced initial acid addition (≈250–240 kg/t vs. >600 kg/t previously) and overall acid consumption (~70–90 kg/t), and leach duration was halved from 24 hours to ~12 hours.

Evidence · text

“Recovery achieved with significantly reduced initial acid addition (≈250–240 kg/t vs. >600 kg/t previously). Acid consumption lowered to ~70–90 kg/t, enhancing project economics. Leach duration reduced to ~12 hours”

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: Tests demonstrate no requirement for separate processing of clay and middlings, simplifying the flowsheet and reducing costs.

Evidence · text

“Tests demonstrate no requirement for separate processing of clay and middlings, simplifying flowsheet and reducing capital/operating costs.”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The metallurgical results are based on information compiled by Mr. Warren Hallam, a director of Aurora Energy Metals Limited and a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), who qualifies as a Competent Person.

Evidence · text

“The information in this announcement relating to Metallurgical Results is based on information compiled by Mr. Warren Hallam, BSc (Metallurgy), a director of Aurora Energy Metals Limited, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM)”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The testwork was conducted using atmospheric and pressure leach methods, which are typical for mill processing routes.

Evidence · table

“Atmospheric”

Context: M2 Middlings

Extracted facts

Stored fact records: 19. Some facts used in scoring do not have a stored record.

Metallurgical Results (19)

Atmospheric leachAurora Uranium Project · uraniumRecovery: 85 %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
preliminary
Test Type
Atmospheric leach
Processing Route
Atmospheric leach
Sample
clay and middlings fractions

Recovery

Recovery
85 %

Reagents

Acid
600 kg/t
Reagent Notes
High acid additions (>600 kg/t). Ferric sulphate likely used. Leach duration 24 hours.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-12-16T00:00:00.000Z

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This historical result established a strong basis for further work with high recoveries, but also highlighted opportunities for process optimization due to high reagent intensity and longer leach duration.

Positive factors

  • High recovery achieved

Negative factors

  • High acid consumption
  • Longer leach duration

Evidence · text

“recoveries of more than 85% from both clay and middlings fractions using atmospheric leach circuits at high acid additions (ASX release 16 December 2024)”
AtmosphericAurora Uranium Project · uraniumRecovery: 72.1 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M2 Middlings
Grind P80
600 µm
Leach Time
24 hours

Recovery

Recovery
72.1 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
51 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test shows reduced acid consumption and potential for further savings, but the recovery is not as high as the optimized range, indicating variability or sub-optimal conditions for this specific test.

Positive factors

  • Reduced acid consumption compared to prior tests
  • Potential for further cost savings through leach solution recycling

Negative factors

  • Recovery is lower than the high 80% range achieved in other optimized tests

Evidence · table

“721”

Context: M2 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 66.1 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M3 Middlings
Grind P80
300 µm
Leach Time
24 hours

Recovery

Recovery
66.1 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
61 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test shows reduced acid consumption but a lower recovery, suggesting that the grind size or other parameters were not optimal for achieving the highest recoveries in this specific test.

Positive factors

  • Reduced acid consumption compared to prior tests
  • Potential for further cost savings through leach solution recycling

Negative factors

  • Recovery is lower than the high 80% range achieved in other optimized tests

Evidence · table

“661”

Context: M3 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 70.1 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M4 Middlings
Grind P80
150 µm
Leach Time
24 hours

Recovery

Recovery
70.1 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
54 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test shows reduced acid consumption but a lower recovery, suggesting that the grind size or other parameters were not optimal for achieving the highest recoveries in this specific test.

Positive factors

  • Reduced acid consumption compared to prior tests
  • Potential for further cost savings through leach solution recycling

Negative factors

  • Recovery is lower than the high 80% range achieved in other optimized tests

Evidence · table

“701”

Context: M4 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 75.1 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M7 Middlings
Grind P80
600 µm
Leach Time
24 hours

Recovery

Recovery
75.1 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
27 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test shows very low acid consumption and potential for further savings, but the recovery is still below the optimized range, indicating that other parameters might need adjustment for higher recovery.

Positive factors

  • Reduced acid consumption compared to prior tests
  • Potential for further cost savings through leach solution recycling

Negative factors

  • Recovery is lower than the high 80% range achieved in other optimized tests

Evidence · table

“751”

Context: M7 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 89.1 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M10 Middlings
Grind P80
600 µm
Leach Time
24 hours

Recovery

Recovery
89.1 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
133 kg/t
Reagent Notes
Initial Acid Addition: 630 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test demonstrates a strong recovery in the high 80% range, aligning with the overall positive results of the optimization program.

Positive factors

  • High recovery achieved (strong band)
  • Potential for further cost savings through leach solution recycling

Evidence · table

“891”

Context: M10 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 90.1 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M11 Middlings
Grind P80
600 µm
Leach Time
24 hours

Recovery

Recovery
90.1 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
142 kg/t
Reagent Notes
Initial Acid Addition: 630 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test achieved an exceptional recovery of over 90%, demonstrating the high potential of the optimized process.

Positive factors

  • Exceptional recovery achieved (exceptional band)
  • Potential for further cost savings through leach solution recycling

Evidence · table

“901”

Context: M11 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 77.2 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M12 Middlings
Grind P80
600 µm
Leach Time
24 hours

Recovery

Recovery
77.2 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
69 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test shows reduced acid consumption and potential for further savings, but the recovery is still below the optimized range, indicating that other parameters might need adjustment for higher recovery.

Positive factors

  • Reduced acid consumption compared to prior tests
  • Potential for further cost savings through leach solution recycling

Negative factors

  • Recovery is lower than the high 80% range achieved in other optimized tests

Evidence · table

“772”

Context: M12 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 93.2 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M13 Middlings
Grind P80
600 µm
Leach Time
24 hours

Recovery

Recovery
93.2 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
43 kg/t
Reagent Notes
Initial Acid Addition: 400 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test achieved an exceptional recovery with very low acid consumption, highlighting the significant improvements from the optimization program.

Positive factors

  • Exceptional recovery achieved (exceptional band)
  • Very low acid consumption
  • Potential for further cost savings through leach solution recycling

Evidence · table

“932”

Context: M13 Middlings

AtmosphericAurora Uranium Project · uraniumRecovery: 89.2 %Head Grade: 381Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
M14 Middlings
Grind P80
600 µm
Leach Time
12 hours

Recovery

Recovery
89.2 %
Head Grade
381
Head Grade Unit
ppm U3O8

Reagents

Acid
33 kg/t
Reagent Notes
Initial Acid Addition: 250 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test demonstrates high recovery with significantly reduced acid consumption and leach duration, representing a key achievement of the optimization program.

Positive factors

  • High recovery achieved (strong band)
  • Very low acid consumption
  • Reduced leach duration (12 hours)
  • Potential for further cost savings through leach solution recycling

Evidence · table

“892”

Context: M14 Middlings

PressureAurora Uranium Project · uraniumRecovery: 45.3 %Head Grade: 350Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Pressure
Processing Route
Pressure leach
Sample
C5 Clay
Grind P80
38 µm
Leach Time
2 hours

Recovery

Recovery
45.3 %
Head Grade
350
Head Grade Unit
ppm U3O8

Reagents

Acid
44 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: Despite a very short leach duration and reduced acid consumption, the recovery for this pressure leach test on clay material is very low, indicating this specific condition is not optimal.

Positive factors

  • Very short leach duration (2 hours)
  • Reduced acid consumption compared to prior tests
  • Potential for further cost savings through leach solution recycling

Negative factors

  • Very low recovery (below weak band)

Evidence · table

“453”

Context: C5 Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 88.1 %Head Grade: 350Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
C6 Clay
Grind P80
38 µm
Leach Time
24 hours

Recovery

Recovery
88.1 %
Head Grade
350
Head Grade Unit
ppm U3O8

Reagents

Acid
-17 kg/t
Reagent Notes
Initial Acid Addition: 150 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test on clay material achieved a high recovery with exceptionally low acid consumption, indicating a very efficient process under these conditions.

Positive factors

  • High recovery achieved (strong band)
  • Very low acid consumption (negative value implies acid generation or very low consumption)
  • Potential for further cost savings through leach solution recycling

Evidence · table

“881”

Context: C6 Clay

PressureAurora Uranium Project · uraniumRecovery: 85.3 %Head Grade: 350Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Pressure
Processing Route
Pressure leach
Sample
C8 Clay
Grind P80
38 µm
Leach Time
2 hours

Recovery

Recovery
85.3 %
Head Grade
350
Head Grade Unit
ppm U3O8

Reagents

Acid
125 kg/t
Reagent Notes
Initial Acid Addition: 630 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This pressure leach test on clay achieved a high recovery in a very short leach duration, demonstrating efficient processing for this material type.

Positive factors

  • High recovery achieved (moderate band)
  • Very short leach duration (2 hours)
  • Potential for further cost savings through leach solution recycling

Evidence · table

“853”

Context: C8 Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 90.2 %Head Grade: 350Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
C9 Clay
Grind P80
38 µm
Leach Time
24 hours

Recovery

Recovery
90.2 %
Head Grade
350
Head Grade Unit
ppm U3O8

Reagents

Acid
51 kg/t
Reagent Notes
Initial Acid Addition: 630 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test on clay material achieved an exceptional recovery with very low acid consumption, demonstrating the high potential of the optimized atmospheric leach process.

Positive factors

  • Exceptional recovery achieved (exceptional band)
  • Very low acid consumption
  • Potential for further cost savings through leach solution recycling

Evidence · table

“902”

Context: C9 Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 82.2 %Head Grade: 389Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
MC15 Midds + Clay
Grind P80
600 µm
Leach Time
12 hours

Recovery

Recovery
82.2 %
Head Grade
389
Head Grade Unit
ppm U3O8

Reagents

Acid
84 kg/t
Reagent Notes
Initial Acid Addition: 270 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test successfully demonstrates high recovery from a combined middlings and clay sample with reduced acid consumption and leach duration, confirming the simplified flowsheet potential.

Positive factors

  • High recovery achieved (moderate band)
  • Reduced acid consumption
  • Reduced leach duration (12 hours)
  • Demonstrates co-processing of middlings and clay
  • Potential for further cost savings through leach solution recycling

Evidence · table

“822”

Context: MC15 Midds + Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 86.2 %Head Grade: 389Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
MC16 Midds + Clay
Grind P80
601 µm
Leach Time
12 hours

Recovery

Recovery
86.2 %
Head Grade
389
Head Grade Unit
ppm U3O8

Reagents

Acid
95 kg/t
Reagent Notes
Initial Acid Addition: 240 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test successfully demonstrates high recovery from a combined middlings and clay sample with significantly reduced acid consumption and leach duration, confirming the simplified flowsheet potential and strong project economics.

Positive factors

  • High recovery achieved (strong band)
  • Reduced acid consumption
  • Reduced leach duration (12 hours)
  • Demonstrates co-processing of middlings and clay
  • Potential for further cost savings through leach solution recycling

Evidence · table

“862”

Context: MC16 Midds + Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 84.2 %Head Grade: 389Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
MC17 Midds + Clay
Grind P80
602 µm
Leach Time
12 hours

Recovery

Recovery
84.2 %
Head Grade
389
Head Grade Unit
ppm U3O8

Reagents

Acid
64 kg/t
Reagent Notes
Initial Acid Addition: 240 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test successfully demonstrates high recovery from a combined middlings and clay sample with reduced acid consumption and leach duration, confirming the simplified flowsheet potential.

Positive factors

  • High recovery achieved (moderate band)
  • Reduced acid consumption
  • Reduced leach duration (12 hours)
  • Demonstrates co-processing of middlings and clay
  • Potential for further cost savings through leach solution recycling

Evidence · table

“842”

Context: MC17 Midds + Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 80.2 %Head Grade: 389Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
MC18 Midds + Clay
Grind P80
603 µm
Leach Time
12 hours

Recovery

Recovery
80.2 %
Head Grade
389
Head Grade Unit
ppm U3O8

Reagents

Acid
66 kg/t
Reagent Notes
Initial Acid Addition: 240 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test successfully demonstrates good recovery from a combined middlings and clay sample with reduced acid consumption and leach duration, confirming the simplified flowsheet potential.

Positive factors

  • High recovery achieved (weak band)
  • Reduced acid consumption
  • Reduced leach duration (12 hours)
  • Demonstrates co-processing of middlings and clay
  • Potential for further cost savings through leach solution recycling

Evidence · table

“802”

Context: MC18 Midds + Clay

AtmosphericAurora Uranium Project · uraniumRecovery: 83.2 %Head Grade: 389Head Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Aurora Uranium Project
Commodity
uranium
Region
southeast oregon, usa
Reported Region
southeast Oregon, USA
Ticker
1AE

Test Work

Program Status
optimization
Test Type
Atmospheric
Processing Route
Atmospheric leach
Sample
MC19 Midds + Clay
Grind P80
604 µm
Leach Time
12 hours

Recovery

Recovery
83.2 %
Head Grade
389
Head Grade Unit
ppm U3O8

Reagents

Acid
83 kg/t
Reagent Notes
Initial Acid Addition: 239 kg/t. No ferric sulphate required. Leach solution recycling demonstrated.

Lab

Laboratory
ALS Metallurgy Perth

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-10-14T00:00:00.000Z

Reasoning: This test successfully demonstrates high recovery from a combined middlings and clay sample with reduced acid consumption and leach duration, confirming the simplified flowsheet potential.

Positive factors

  • High recovery achieved (moderate band)
  • Reduced acid consumption
  • Reduced leach duration (12 hours)
  • Demonstrates co-processing of middlings and clay
  • Potential for further cost savings through leach solution recycling

Evidence · table

“832”

Context: MC19 Midds + Clay

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.