# LPM: Lei Scoping Study Presentation

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/lpm-lei-scoping-study-presentation--6514d8c4-4e2e-4a99-9c96-b644bacbec43

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03154559

Publisher: asx

Original announcement: 2026-10-20T00:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-20T01:05:03.540Z

Atlas analysis updated: 2026-10-20T01:05:03.540Z

- Company: Lithium Plus Minerals Ltd

- Ticker: LPM

- Exchange: ASX

- Region: Unavailable

- Primary commodity: Lithium

- Secondary commodities: None reported

- Document categories: Other, Resource update, Metallurgy

- Extracted: 2026-10-20 01:05:04 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Lithium Plus Minerals has released a Scoping Study for its Lei DSO Lithium Project, highlighting strong post-tax economics with an IRR of 75.4%, an NPV8% of A$325.0 million, and a rapid payback period of 1.8 years. The study is underpinned by a 2026 Mineral Resource Estimate of 5.22 Mt at 1.50% Li₂O for 78.42 kt contained Li₂O, which represents a 34% increase in contained lithium. Positive metallurgical test work achieved 85.3% recovery to a 6.12% Li₂O concentrate, supporting a low-capital underground development and direct shipping ore \(DSO\) operation.

Reasoning: The Scoping Study outlines robust economics for the Lei Lithium Project, supported by a substantial resource base and positive metallurgical test work, indicating a viable development pathway despite the preliminary nature of the study and reliance on previously announced technical results.

- Positive factor: Strong project economics \(high IRR, low CAPEX, quick payback\)

- Positive factor: Significant increase in contained lithium in the MRE

- Positive factor: Positive metallurgical results

- Positive factor: High percentage of Indicated resources in early production years

- Positive factor: Established infrastructure and commercial pathways \(Darwin Port, Canmax MOU\)

- Positive factor: Clear pathway to DSO development

- Negative factor: Scoping Study is preliminary in nature

- Negative factor: Significant portion of the resource \(43%\) is Inferred

- Negative factor: Lithium prices are volatile

- Negative factor: Funding for development still needs to be secured

- Negative factor: Resource update and metallurgy results are re-stated from prior announcements

Facts used in scoring: 4

## Classification and evidence

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The document is a Scoping Study Presentation, which is a preliminary economic assessment.

Evidence · text

> Lei Scoping Study Presentation

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents a '2026 updated MRE' for the Lei Deposit.

Evidence · text

> 2026 updated MRE

**Tonnage Growth**

Polarity: positive

Definition: Significant tonnage increase \(≥15%\) vs prior estimate with grade maintained or improved.

Why it applies: The updated MRE shows a '34% increase in contained lithium to 78.42kt Li₂O'.

Evidence · text

> 34% increase in contained lithium to 78.42kt Li₂O

**Low Capex**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The study highlights 'Low upfront capital' and a 'Project capital cost estimate' of A$87.7 million.

Evidence · text

> Low upfront capital

**High IRR**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The Scoping Study reports an 'IRR \(AFTER TAX\)' of 75.4%.

Evidence · text

> IRR \(AFTER TAX\) 75.4

**Quick Payback**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The Scoping Study reports a 'PAYBACK PERIOD FROM FIRST PRODUCTION' of 1.8 years.

Evidence · text

> PAYBACK PERIOD FROM FIRST PRODUCTION 1.8 years

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: Of the Mineral Resources scheduled for extraction in the Scoping Study mine plan, 43% are classified as Inferred.

Evidence · text

> 43% are classified as Inferred

**Preliminary Study**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The Scoping Study is described as 'preliminary in nature and is based on low-level technical and economic assessments'.

Evidence · text

> The Study is preliminary in nature and is based on low-level technical and economic assessments

**Funding Required**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The company states that 'funding in the order of A$87.7 \(US$61\) million of project capital will likely be required'.

Evidence · text

> funding in the order of A$87.7 \(US$61\) million of project capital will likely be required

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a flotation route \("flotation"\)

**Gravity Route**

Polarity: neutral

Definition: Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route \("DMS"\)

**Single Domain Only**

Polarity: negative

Definition: Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

## Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/lpm-lei-scoping-study-presentation--6514d8c4-4e2e-4a99-9c96-b644bacbec43#fact-resource-facts-1)

Lei Deposit · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Lei Deposit
- Commodity: lithium
- Ticker: LPM

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:cdade04d92dd091811a8

#### Resource Data

- Category: indicated
- Tonnes: 2850000
- Grade: 1.49
- Grade Unit: % Li2O
- Contained Metal: 42.55
- Contained Unit: kt
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2026-07-15

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-20T00:00:00.000Z

Reasoning: The indicated resource shows a high-grade lithium deposit, providing a strong foundation for the project, though the figures are not new to this announcement.

- Positive factor: High-grade indicated resource

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Resource figures are re-stated from a prior announcement

Evidence · table

> 1.49

Context: 2.85

#### Tags used in scoring

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of the JORC Code \(2012\).

Evidence · text

> The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of the JORC Code \(2012\).

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/lpm-lei-scoping-study-presentation--6514d8c4-4e2e-4a99-9c96-b644bacbec43#fact-resource-facts-2)

Lei Deposit · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Lei Deposit
- Commodity: lithium
- Ticker: LPM

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:2479a41ddafa089f41a3

#### Resource Data

- Category: inferred
- Tonnes: 2370000
- Grade: 1.51
- Grade Unit: % Li2O
- Contained Metal: 35.88
- Contained Unit: kt
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2026-07-15

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-15T00:00:00.000Z

#### Dates

- Event date: 2026-10-20T00:00:00.000Z

Reasoning: The inferred resource adds to the overall contained lithium but carries lower geological confidence, and these figures are not new to this announcement.

- Positive factor: High-grade inferred resource

- Positive factor: JORC compliant

- Positive factor: QP signed

- Negative factor: Inferred classification implies lower geological confidence

- Negative factor: Resource figures are re-stated from a prior announcement

Evidence · table

> 1.51

Context: 2.37

#### Tags used in scoring

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of the JORC Code \(2012\).

Evidence · text

> The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of the JORC Code \(2012\).

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

## Metallurgical Results (1)

### DMS and flotation

[Link to this fact](https://atlas-staging.minestarters.com/news/lpm-lei-scoping-study-presentation--6514d8c4-4e2e-4a99-9c96-b644bacbec43#fact-metallurgical-facts-3)

Lei Deposit · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Lei Deposit
- Commodity: lithium
- Ticker: LPM

#### Test Work

- Test Type: DMS and flotation
- Processing Route: flotation
- Sample: high-grade sample

#### Recovery

- Recovery: 85.3 %
- Recovery Basis: actual\_test
- Conc. Grade: 6.12
- Conc. Grade Unit: % Li2O

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-10-16T00:00:00.000Z

#### Dates

- Event date: 2026-10-20T00:00:00.000Z

Reasoning: The metallurgical test work shows strong recovery and concentrate grade for lithium, supporting the project's viability, but these results were previously announced.

- Positive factor: High recovery for lithium

- Positive factor: High concentrate grade

- Negative factor: Metallurgical results are re-stated from a prior announcement

- Negative factor: Bench Scale Only \(implied by 'sample' and 'achieved'\)

Evidence · text

> Combined DMS and flotation on high-grade sample achieved 85.3% recovery to a 6.12% Li2O concentrate

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

**Gravity Route**

Polarity: neutral

Definition: Gravity separation forms a material part of the flowsheet.

Why it applies: processing\_route matches the gravity signal

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
