Lomiko Metals Inc. Files a Positive Preliminary Feasibility Study For La Loutre Graphite Project on SEDAR

Original announcement by tmx on

Company
Lomiko Metals Inc.
Ticker
LMR
Exchange
TSX
Region
Quebec, Canada
Primary commodity
Graphite
Secondary commodities
None reported
Document categories
Resource update, Metallurgy
Extracted
2026-08-20 23:14:19 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Lomiko Metals has filed its Preliminary Feasibility Study (PFS) for the La Loutre Graphite Project in Quebec. The study reports probable reserves of 46.8 Mt at 4.79% Cg and demonstrates strong economics with an after-tax NPV of CA$617.4 M.

Reasoning: The filing of the PFS formalizes previously reported results, confirming strong economic viability with a 24.7% after-tax IRR and significant graphite reserves.

Positive factors

  • Declaration of probable reserves
  • Strong economic metrics (NPV/IRR)
  • High metallurgical recovery (93%)
  • Long mine life (28 years)

Negative factors

  • Results are a restatement of March 2026 news release

Facts used in scoring: 5

Atlas analysis — Lomiko Metals Inc.: Lomiko Metals Inc. Files a Positive Preliminary Feasibility Study For La Loutre Graphite Project on SEDAR. measured 215000 tonnes; indicated 69741000 tonnes; inferred 20279000 tonnes

Classification and evidence

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The PFS declares 46.8 Mt of probable reserves at 4.79% Cg.

Evidence · text

“The Project has probable mineral reserves... of 46.8 Mt at an average grade of 4.79% Cg”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: LOM average mill recovery is 93.0% for graphite.

Evidence · text

“Average LOM mill recovery of 93.0% Cg.”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The PFS was prepared in accordance with NI 43-101 standards.

Evidence · text

“prepared in accordance with National Instrument 43-101”

Extracted facts

Stored fact records: 5. Some facts used in scoring do not have a stored record.

Resource Estimates (5)

probablegraphiteTonnes: 46800000Grade: 4.79Grade Unit: % CgContained Metal: 2240000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Commodity
graphite
Ticker
LMR

Resource Data

Category
probable
Tonnes
46800000
Grade
4.79
Grade Unit
% Cg
Contained Metal
2240000
Contained Unit
t
Cutoff Grade
1.5

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-03-24T00:00:00.000Z

Dates

Event date
2026-05-08T00:00:00.000Z

Reasoning: Probable reserves established at a 1.5% cut-off.

Positive factors

  • Significant tonnage and grade

Negative factors

  • Restatement of prior results

Evidence · text

“The Project has probable mineral reserves... of 46.8 Mt at an average grade of 4.79% Cg”
measuredgraphiteTonnes: 215000Grade: 4.47Grade Unit: % CgContained Metal: 9700Contained Unit: ktView all details
Link to this fact

Identity

Commodity
graphite
Ticker
LMR

Resource Data

Category
measured
Tonnes
215000
Grade
4.47
Grade Unit
% Cg
Contained Metal
9700
Contained Unit
kt
Cutoff Grade
0.95

Review

Needs Review
No
Historical
No

Dates

Event date
2026-05-08T00:00:00.000Z

Reasoning: Measured resource component of the PFS.

Positive factors

  • High grade for measured category

Evidence · text

“a measured resource of 215 kt at a 4.47 % Cg grade for 9,7 kt of graphite”
indicatedgraphiteTonnes: 69741000Grade: 4.41Grade Unit: % CgContained Metal: 3075000Contained Unit: ktView all details
Link to this fact

Identity

Commodity
graphite
Ticker
LMR

Resource Data

Category
indicated
Tonnes
69741000
Grade
4.41
Grade Unit
% Cg
Contained Metal
3075000
Contained Unit
kt
Cutoff Grade
0.95

Review

Needs Review
No
Historical
No

Dates

Event date
2026-05-08T00:00:00.000Z

Reasoning: Indicated resource component of the PFS.

Positive factors

  • Large tonnage indicated resource

Evidence · text

“an indicated resource of 69,741 kt at a 4.41 % Cg grade for 3,075 kt of graphite”
inferredgraphiteTonnes: 20279000Grade: 3.53Grade Unit: % CgContained Metal: 716000Contained Unit: ktView all details
Link to this fact

Identity

Commodity
graphite
Ticker
LMR

Resource Data

Category
inferred
Tonnes
20279000
Grade
3.53
Grade Unit
% Cg
Contained Metal
716000
Contained Unit
kt
Cutoff Grade
0.95

Review

Needs Review
No
Historical
No

Dates

Event date
2026-05-08T00:00:00.000Z

Reasoning: Inferred resource component of the PFS.

Negative factors

  • Inferred category limits confidence

Evidence · text

“an inferred resource of 20,279 kt at a 3.53 % Cg grade for 716 kt of graphite”
Fact 5graphiteView all details
Link to this fact

Identity

Commodity
graphite
Ticker
LMR

Review

Needs Review
No
Historical
No

Dates

Event date
2026-05-08T00:00:00.000Z

Reasoning: Strong LOM average recovery reported in PFS.

Positive factors

  • High recovery (93%)

Evidence · text

“Average LOM mill recovery of 93.0% Cg.”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.