LithiumBank Files NI 43-101 Resource Estimate Technical Report for the Boardwalk Lithium Brine Project, West-Central Alberta

Original announcement by tmx on

Company
LithiumBank Resources Corp.
Ticker
LBNK
Exchange
TSX
Region
West-Central Alberta
Primary commodity
Lithium
Secondary commodities
None reported
Document categories
Resource update
Extracted
2026-08-25 19:01:20 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

LithiumBank Resources Corp. has filed an updated NI 43-101 technical report for the Boardwalk lithium brine project in Alberta. The updated resource estimate shows a >30% increase in total lithium carbonate equivalent (LCE) tonnage and an ~18% increase in lithium grade compared to the previous estimate.

Reasoning: Significant expansion in both tonnage and grade for the Boardwalk project, supported by a formal NI 43-101 technical report and robust QA/QC disclosure.

Positive factors

  • Tonnage growth of >30% vs prior estimate
  • Grade improvement of ~18% vs prior estimate
  • NI 43-101 compliant technical report filed
  • QA/QC protocols and certified lab (AGAT) disclosed

Facts used in scoring: 3

Classification and evidence

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: Resource estimate increased by over 30% vs previous estimate.

Evidence · text

“increased by over 30% due to an increase in the lithium grade”

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: Lithium grade increased by approximately 18% from the previous resource estimate.

Evidence · text

“increase in lithium grade of approximately 18% from the previous resource estimate”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The company filed a formal NI 43-101 Resource Estimate Technical Report.

Evidence · text

“Files NI 43-101 Resource Estimate Technical Report”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Alex Haluszka, P. Geo. is named as the Qualified Person who reviewed and validated the data.

Evidence · text

“reviewed and validated by Alex Haluszka... a Qualified Person”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The resource estimation was completed using a cut-off of 50 mg/L Li.

Evidence · text

“cut-off of 50 mg/L Li”

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Resource Estimates (3)

measuredlithiumTonnes: 1671000Grade: 81.2Grade Unit: mg/L lithiumView all details
Link to this fact

Identity

Commodity
lithium
Ticker
LBNK

Resource Data

Category
measured
Tonnes
1671000
Grade
81.2
Grade Unit
mg/L lithium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-04-08T00:00:00.000Z

Reasoning: Measured category provides high geological confidence for the Leduc Fm reservoir.

Positive factors

  • High-grade measured resource

Evidence · table

“81.2”

Context: 1,671,000

indicatedlithiumTonnes: 3524000Grade: 81.8Grade Unit: mg/L lithiumView all details
Link to this fact

Identity

Commodity
lithium
Ticker
LBNK

Resource Data

Category
indicated
Tonnes
3524000
Grade
81.8
Grade Unit
mg/L lithium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-04-08T00:00:00.000Z

Reasoning: Indicated category provides reasonable geological confidence.

Positive factors

  • Large indicated resource volume

Evidence · table

“81.8”

Context: 3,524,000

inferredlithiumTonnes: 2777000Grade: 79Grade Unit: mg/L lithiumView all details
Link to this fact

Identity

Commodity
lithium
Ticker
LBNK

Resource Data

Category
inferred
Tonnes
2777000
Grade
79
Grade Unit
mg/L lithium

Review

Needs Review
No
Historical
No

Dates

Event date
2025-04-08T00:00:00.000Z

Reasoning: Inferred resource provides speculative geological continuity.

Positive factors

  • Expansion into Beaverhill Lake/Swan Hills

Negative factors

  • Inferred category has lower confidence

Evidence · table

“79.0”

Context: 2,777,000

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.