# Koryx Copper Files Technical Report with Updated Mineral Resource Estimate for the Haib Copper Project, Southern Namibia

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/koryx-copper-files-technical-report-with-updated-mineral-resource-estimate-for-t--5927afec-4a08-44f7-b7e5-ffe20ab7894f

Original source: https://orestocks.com/company/KRY.V/press-releases/8930320996425380

Publisher: orestocks

Original announcement: 2026-05-09T00:26:17.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-01T03:53:03.149Z

Atlas analysis updated: 2026-10-01T03:53:03.149Z

- Company: Koryx Copper S.A.

- Ticker: KRY.V

- Exchange: TSXV

- Region: Namibia

- Primary commodity: Copper

- Secondary commodities: Molybdenum, Gold

- Document categories: Resource update, Other

- Extracted: 2026-10-01 03:53:03 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Koryx Copper has filed a new NI 43-101 Technical Report containing an updated Mineral Resource Estimate for the Haib Copper Project in Namibia. The company plans to conduct 50,000 metres of infill and growth drilling by the end of Summer 2026 to support a planned Pre-Feasibility Study in Q4 2026.

Reasoning: The company filed a new technical report with an updated MRE, providing a baseline for upcoming PFS and a significant drilling program, though it faces executive turnover.

- Positive factor: Updated MRE filed

- Positive factor: Planned 50,000m drilling campaign

- Positive factor: PFS planned for Q4 2026

- Negative factor: COO departure

- Negative factor: Previous PEA no longer current

Facts used in scoring: 0

## Classification and evidence

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The announcement specifically concerns the filing of a new technical report with an updated mineral resource estimate.

Evidence · text

> announces that it has publicly filed on SEDAR+ its new technical report with the updated mineral resource estimate \(“ MRE ”\)

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The technical report was authored by a named Qualified Person, Mr. J.C. Witley, who is registered with SACNASP.

Evidence · text

> Mr. Witley has the appropriate relevant qualifications and experience to be considered a “Qualified Person”

## Extracted facts

Stored fact records: 0. Some facts used in scoring do not have a stored record.

No stored fact records are available for this extraction.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
