Kobo Resources Extends Gold Mineralisation to the North at Kossou with Multiple High-Grade Drill Intercepts

Original announcement by orestocks on

Company
Kobo Resources Inc.
Ticker
KRI.V
Exchange
Unavailable
Region
Côte d’Ivoire
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Drill results, Resource update
Extracted
2026-09-03 12:28:42 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Kobo Resources announced high-grade gold drill results from its Kossou Gold Project in Côte d’Ivoire, extending mineralization at the Road Cut Zone to the north and at depth. Key intercepts include 1.0 m at 68.60 g/t Au and 5.0 m at 4.55 g/t Au. The drilling is part of a program aimed at resource definition for an inaugural Mineral Resource Estimate expected in Q4 2026.

Reasoning: Kobo Resources reported multiple high-grade gold intercepts, including a bonanza grade of 68.60 g/t Au over 1.0 m, which successfully extended mineralization at the Road Cut Zone. The drilling contributes to resource definition for an upcoming MRE, indicating positive progress, although true widths remain unknown.

Positive factors

  • High-grade gold intercepts, including bonanza grades
  • Extension of mineralization to the north and at depth
  • Progress towards an inaugural Mineral Resource Estimate (MRE)
  • Comprehensive QA/QC procedures disclosed and QP sign-off

Negative factors

  • True widths are unknown for reported intercepts
  • Many high-grade intercepts are narrow, leading to lower grade-thickness products

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 49

Classification and evidence

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The intercept of 1.0 m at 68.60 g/t Au in KDD0179 is an exceptionally high-grade zone, well above the deposit-type norm for gold.

Evidence · text

“1.0 m at 68.60 g/t Au”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: The drilling successfully extended the mineralised system to the north and at depth, with mineralization remaining open.

Evidence · text

“extends the mineralised system to the north and at depth where it remains open.”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The release includes detailed QA/QC procedures, mentioning certified standards, blanks, duplicates, and a Qualified Person sign-off.

Evidence · text

“QA/QC procedures for the drill program include insertion of a certificated standards every 20 samples, a blank every 20 samples and a duplicate sample every 20 samples. All QAQC control samples returned values within acceptable limits.”

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The drilling program is explicitly stated to be focused on 'resource definition' and advancing towards an inaugural MRE.

Evidence · text

“Current drilling is focused on expanding and defining mineralisation across Kossou as the Company continues resource definition and exploration drilling toward an inaugural Mineral Resource Estimate (“MRE”) expected in Q4 2026.”

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The document explicitly states that all intercepts are reported as downhole lengths and true widths are unknown.

Evidence · text

“All intercepts reported are downhole distances, true widths are unknown.”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The cut-off grade of 0.30 g/t Au used for reporting intervals is clearly stated.

Evidence · text

“Cut-off grade of 0.30 g/t Au over a minimum interval of 2.0 m.”

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: The rules for internal dilution (no more than 3.0 m of internal dilution grading less than 0.30 g/t Au) are clearly stated for reported intervals.

Evidence · text

“Intervals are reported with no more than 3.0 m of internal dilution grading less than 0.30 g/t Au, except where indicated with an asterisk (*).”

Extracted facts

Stored fact records: 49. Some facts used in scoring do not have a stored record.

Drill Results (49)

KDD0173Kossou Gold Project · goldGrade: 0.79Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.79
Grade Unit
g/t
Intercept
5 m
From
12 m
To
17 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows moderate gold grade over a narrow width, contributing to the overall understanding of mineralization but not a highlight.

Positive factors

  • Confirms gold mineralization within the target zone

Negative factors

  • Grade is moderate, below strong thresholds for gold

Evidence · table

“0.79”

Context: 5.00

KDD0173Kossou Gold Project · goldGrade: 2.04Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.04
Grade Unit
g/t
Intercept
2 m
From
49 m
To
51 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a narrow interval, indicating localized higher-grade mineralization.

Positive factors

  • Strong gold grade for the deposit type

Negative factors

  • Narrow intercept width

Evidence · table

“2.04”

Context: 2.00

KDD0173Kossou Gold Project · goldGrade: 7.75Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
7.75
Grade Unit
g/t
Intercept
2 m
From
55 m
To
57 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept features an exceptional gold grade over a narrow width, highlighting high-grade zones within the project and supporting the extension of mineralization.

Positive factors

  • Exceptional gold grade, indicating high-grade potential
  • Contributes to understanding mineralization outside principal shear structures

Negative factors

  • Narrow intercept width

Evidence · table

“7.75”

Context: 2.00

KDD0173Kossou Gold Project · goldGrade: 7.28Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
7.28
Grade Unit
g/t
Intercept
1 m
From
102 m
To
103 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows an exceptional gold grade over a very narrow interval, indicating high-grade vein potential.

Positive factors

  • Exceptional gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“7.28”

Context: 1.00

KDD0173Kossou Gold Project · goldGrade: 5.47Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
5.47
Grade Unit
g/t
Intercept
1 m
From
129 m
To
130 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows an exceptional gold grade over a very narrow interval, indicating high-grade vein potential.

Positive factors

  • Exceptional gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“5.47”

Context: 1.00

KDD0173Kossou Gold Project · goldGrade: 1.59Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.59
Grade Unit
g/t
Intercept
1 m
From
156 m
To
157 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a very narrow interval, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“1.59”

Context: 1.00

KDD0173Kossou Gold Project · goldGrade: 0.37Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.37
Grade Unit
g/t
Intercept
2 m
From
190 m
To
192 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade, indicating the presence of mineralization above the cut-off grade.

Positive factors

  • Weak gold grade, but above cut-off

Evidence · table

“0.37”

Context: 2.00

KDD0173Kossou Gold Project · goldGrade: 0.99Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.99
Grade Unit
g/t
Intercept
3 m
From
205 m
To
208 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a narrow width, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Evidence · table

“0.99”

Context: 3.00

KDD0173Kossou Gold Project · goldGrade: 4.88Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
4.88
Grade Unit
g/t
Intercept
1 m
From
214 m
To
215 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows an exceptional gold grade over a very narrow interval, indicating high-grade vein potential.

Positive factors

  • Exceptional gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“4.88”

Context: 1.00

KDD0173Kossou Gold Project · goldGrade: 0.43Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.43
Grade Unit
g/t
Intercept
5 m
From
233 m
To
238 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a moderate width, indicating the presence of mineralization above the cut-off grade within the interpreted Main Road Cut Shear.

Positive factors

  • Weak gold grade, but above cut-off

Evidence · table

“0.43”

Context: 5.00

KDD0173Kossou Gold Project · goldGrade: 1.79Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.79
Grade Unit
g/t
Intercept
1 m
From
244 m
To
245 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a very narrow interval, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“1.79”

Context: 1.00

KDD0173Kossou Gold Project · goldGrade: 3.75Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
3.75
Grade Unit
g/t
Intercept
1 m
From
295 m
To
296 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a very narrow interval, indicating localized higher-grade mineralization.

Positive factors

  • Strong gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“3.75”

Context: 1.00

KDD0173Kossou Gold Project · goldGrade: 2.5Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.5
Grade Unit
g/t
Intercept
4 m
From
307 m
To
311 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a moderate width, indicating significant mineralization outside the main shear structure.

Positive factors

  • Strong gold grade
  • Contributes to understanding mineralization outside principal shear structures

Evidence · table

“2.50”

Context: 4.00

KDD0173Kossou Gold Project · goldGrade: 3.01Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0173
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
3.01
Grade Unit
g/t
Intercept
1 m
From
346 m
To
347 m
Hole Depth
366 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228233
Northing
776467
Elevation
294 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a very narrow interval, confirming mineralization along the Contact Zone Fault.

Positive factors

  • Strong gold grade
  • Indicates mineralization along the Contact Zone Fault

Negative factors

  • Very narrow intercept width

Evidence · table

“3.01”

Context: 1.00

KDD0174Kossou Gold Project · goldGrade: 0.78Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0174
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.78
Grade Unit
g/t
Intercept
5 m
From
44 m
To
49 m
Hole Depth
242 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228299
Northing
776577
Elevation
272 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a narrow width, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Evidence · table

“0.78”

Context: 5.00

KDD0174Kossou Gold Project · goldGrade: 0.51Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0174
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.51
Grade Unit
g/t
Intercept
5 m
From
70 m
To
75 m
Hole Depth
242 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228299
Northing
776577
Elevation
272 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a moderate width, indicating the presence of mineralization above the cut-off grade.

Positive factors

  • Weak gold grade, but above cut-off

Evidence · table

“0.51”

Context: 5.00

KDD0174Kossou Gold Project · goldGrade: 1.61Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
KDD0174
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.61
Grade Unit
g/t
Intercept
3 m
From
98 m
To
101 m
Hole Depth
242 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228299
Northing
776577
Elevation
272 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a narrow width, confirming mineralization associated with the Main Road Cut Shear.

Positive factors

  • Moderate gold grade
  • Associated with the Main Road Cut Shear

Evidence · table

“1.61”

Context: 3.00

KDD0174Kossou Gold Project · goldGrade: 1.23Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0174
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.23
Grade Unit
g/t
Intercept
5 m
From
123 m
To
128 m
Hole Depth
242 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228299
Northing
776577
Elevation
272 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a moderate width, confirming mineralization associated with the Main Road Cut Shear.

Positive factors

  • Moderate gold grade
  • Associated with the Main Road Cut Shear

Evidence · table

“1.23”

Context: 5.00

KDD0174Kossou Gold Project · goldGrade: 1.93Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0174
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.93
Grade Unit
g/t
Intercept
2 m
From
137 m
To
139 m
Hole Depth
242 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228299
Northing
776577
Elevation
272 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a narrow width, confirming mineralization associated with the Main Road Cut Shear.

Positive factors

  • Moderate gold grade
  • Associated with the Main Road Cut Shear

Evidence · table

“1.93”

Context: 2.00

KDD0175Kossou Gold Project · goldGrade: 1.93Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
KDD0175
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.93
Grade Unit
g/t
Intercept
3 m
From
77 m
To
80 m
Hole Depth
261 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228260
Northing
776616
Elevation
288 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a narrow width, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Evidence · table

“1.93”

Context: 3.00

KDD0175Kossou Gold Project · goldGrade: 2.22Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0175
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.22
Grade Unit
g/t
Intercept
1 m
From
132 m
To
133 m
Hole Depth
261 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228260
Northing
776616
Elevation
288 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a very narrow interval, indicating localized higher-grade mineralization.

Positive factors

  • Strong gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“2.22”

Context: 1.00

KDD0175Kossou Gold Project · goldGrade: 2.25Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
KDD0175
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.25
Grade Unit
g/t
Intercept
7 m
From
166 m
To
173 m
Hole Depth
261 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228260
Northing
776616
Elevation
288 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a significant width, providing further evidence of mineralization continuity in the northern portion of the system.

Positive factors

  • Strong gold grade over a good width
  • Associated with V2 veins in unfoliated basalts

Evidence · table

“2.25”

Context: 7.00

KDD0175Kossou Gold Project · goldGrade: 6.5Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0175
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
6.5
Grade Unit
g/t
Intercept
2 m
From
187 m
To
189 m
Hole Depth
261 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228260
Northing
776616
Elevation
288 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows an exceptional gold grade over a narrow width, indicating high-grade mineralization near the Main Road Cut Shear.

Positive factors

  • Exceptional gold grade
  • Associated with V2 veins in sheared volcanic rocks proximal to the Main Road Cut Shear

Negative factors

  • Narrow intercept width

Evidence · table

“6.50”

Context: 2.00

KDD0175Kossou Gold Project · goldGrade: 0.58Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
KDD0175
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.58
Grade Unit
g/t
Intercept
4 m
From
232 m
To
236 m
Hole Depth
261 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228260
Northing
776616
Elevation
288 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a moderate width, confirming mineralization along the Contact Zone Fault.

Positive factors

  • Weak gold grade, but above cut-off
  • Indicates mineralization along the Contact Zone Fault

Evidence · table

“0.58”

Context: 4.00

KDD0175Kossou Gold Project · goldGrade: 1.77Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0175
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.77
Grade Unit
g/t
Intercept
1 m
From
232 m
To
233 m
Hole Depth
261 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228260
Northing
776616
Elevation
288 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows a moderate gold grade over a very narrow width, contributing to the overall mineralization picture within the broader interval.

Positive factors

  • Moderate gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“1.77”

Context: 1.00

KDD0176Kossou Gold Project · goldGrade: 2.07Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.07
Grade Unit
g/t
Intercept
2 m
From
94 m
To
96 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a narrow interval, indicating localized higher-grade mineralization.

Positive factors

  • Strong gold grade

Negative factors

  • Narrow intercept width

Evidence · table

“2.07”

Context: 2.00

KDD0176Kossou Gold Project · goldGrade: 1.05Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.05
Grade Unit
g/t
Intercept
1 m
From
100 m
To
101 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a very narrow interval, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“1.05”

Context: 1.00

KDD0176Kossou Gold Project · goldGrade: 0.65Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.65
Grade Unit
g/t
Intercept
3 m
From
189 m
To
192 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a narrow width, indicating the presence of mineralization above the cut-off grade.

Positive factors

  • Weak gold grade, but above cut-off

Evidence · table

“0.65”

Context: 3.00

KDD0176Kossou Gold Project · goldGrade: 0.64Grade Unit: g/tIntercept: 12 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.64
Grade Unit
g/t
Intercept
12 m
From
270 m
To
282 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a significant width, confirming mineralization within the principal structure of the Main Road Cut Shear at depth.

Positive factors

  • Weak gold grade over a significant width
  • Associated with the Main Road Cut Shear

Evidence · table

“0.64”

Context: 12.00

KDD0176Kossou Gold Project · goldGrade: 1.33Grade Unit: g/tIntercept: 8 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.33
Grade Unit
g/t
Intercept
8 m
From
288 m
To
296 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a good width, confirming mineralization within the principal structure of the Main Road Cut Shear at depth.

Positive factors

  • Moderate gold grade over a good width
  • Associated with the Main Road Cut Shear

Evidence · table

“1.33”

Context: 8.00

KDD0176Kossou Gold Project · goldGrade: 2.83Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.83
Grade Unit
g/t
Intercept
3 m
From
288 m
To
291 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows a strong gold grade over a narrow width, indicating a higher-grade zone within the broader interval.

Positive factors

  • Strong gold grade

Evidence · table

“2.83”

Context: 3.00

KDD0176Kossou Gold Project · goldGrade: 1.55Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.55
Grade Unit
g/t
Intercept
1 m
From
301 m
To
302 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a very narrow interval, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“1.55”

Context: 1.00

KDD0176Kossou Gold Project · goldGrade: 0.53Grade Unit: g/tIntercept: 3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
KDD0176
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.53
Grade Unit
g/t
Intercept
3 m
From
311 m
To
314 m
Hole Depth
395 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228159
Northing
776526
Elevation
295 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a narrow width, indicating the presence of mineralization above the cut-off grade.

Positive factors

  • Weak gold grade, but above cut-off

Evidence · table

“0.53”

Context: 3.00

KDD0177Kossou Gold Project · goldGrade: 0.95Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.95
Grade Unit
g/t
Intercept
2 m
From
9 m
To
11 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a narrow width, contributing to the overall mineralization picture.

Positive factors

  • Moderate gold grade

Negative factors

  • Narrow intercept width

Evidence · table

“0.95”

Context: 2.00

KDD0177Kossou Gold Project · goldGrade: 0.8Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.8
Grade Unit
g/t
Intercept
4 m
From
171 m
To
175 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a moderate width, indicating the presence of mineralization above the cut-off grade.

Positive factors

  • Weak gold grade, but above cut-off

Evidence · table

“0.80”

Context: 4.00

KDD0177Kossou Gold Project · goldGrade: 0.7Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.7
Grade Unit
g/t
Intercept
5 m
From
249 m
To
254 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a moderate width, confirming mineralization associated with the Main Road Cut Shear.

Positive factors

  • Weak gold grade, but above cut-off
  • Associated with the Main Road Cut Shear

Evidence · table

“0.70”

Context: 5.00

KDD0177Kossou Gold Project · goldGrade: 0.54Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.54
Grade Unit
g/t
Intercept
7 m
From
257 m
To
264 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a weak gold grade over a good width, confirming mineralization associated with the Main Road Cut Shear.

Positive factors

  • Weak gold grade, but above cut-off
  • Associated with the Main Road Cut Shear

Evidence · table

“0.54”

Context: 7.00

KDD0177Kossou Gold Project · goldGrade: 0.93Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
0.93
Grade Unit
g/t
Intercept
6 m
From
279 m
To
285 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade over a good width, confirming mineralization associated with the Main Road Cut Shear.

Positive factors

  • Moderate gold grade over a good width
  • Associated with the Main Road Cut Shear

Evidence · table

“0.93”

Context: 6.00

KDD0177Kossou Gold Project · goldGrade: 1.29Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
1.29
Grade Unit
g/t
Intercept
4 m
From
279 m
To
283 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows a moderate gold grade over a moderate width, indicating a higher-grade zone within the broader interval.

Positive factors

  • Moderate gold grade

Evidence · table

“1.29”

Context: 4.00

KDD0177Kossou Gold Project · goldGrade: 4.26Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
4.26
Grade Unit
g/t
Intercept
4 m
From
294 m
To
298 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a moderate width, providing further evidence of mineralization continuity at depth in the northern portion of the system.

Positive factors

  • Strong gold grade over a moderate width
  • Associated with V2 veins in sheared basalts

Evidence · table

“4.26”

Context: 4.00

KDD0177Kossou Gold Project · goldGrade: 5.47Grade Unit: g/tIntercept: 3.05 mView all details
Link to this fact

Identity

Hole ID
KDD0177
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
5.47
Grade Unit
g/t
Intercept
3.05 m
From
294.95 m
To
298 m
Hole Depth
354 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228168
Northing
776582
Elevation
287 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows an exceptional gold grade over a narrow width, indicating a high-grade zone within the broader interval.

Positive factors

  • Exceptional gold grade

Evidence · table

“5.47”

Context: 3.05

KDD0178Kossou Gold Project · goldGrade: 2.15Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0178
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.15
Grade Unit
g/t
Intercept
1 m
From
62 m
To
63 m
Hole Depth
131 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228612
Northing
775680
Elevation
291 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a very narrow interval, indicating localized higher-grade mineralization at the Kadie target.

Positive factors

  • Strong gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“2.15”

Context: 1.00

KDD0179Kossou Gold Project · goldGrade: 68.6Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
68.6
Grade Unit
g/t
Intercept
1 m
From
197 m
To
198 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept represents a bonanza gold grade over a narrow interval, significantly highlighting the high-grade potential of the V2 veining system.

Positive factors

  • Bonanza gold grade
  • Indicates high-grade V2 veining proximal to principal shear zones

Negative factors

  • Very narrow intercept width

Evidence · table

“68.60”

Context: 1.00

KDD0179Kossou Gold Project · goldGrade: 4.55Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
4.55
Grade Unit
g/t
Intercept
5 m
From
214 m
To
219 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows an exceptional gold grade over a good width, significantly extending mineralization at depth and contributing to the overall resource potential.

Positive factors

  • Exceptional gold grade over a good width
  • Extends mineralization below previous drilling and remains open at depth

Evidence · table

“4.55”

Context: 5.00

KDD0179Kossou Gold Project · goldGrade: 4.94Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
4.94
Grade Unit
g/t
Intercept
1 m
From
214 m
To
215 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows an exceptional gold grade over a very narrow width, indicating a high-grade zone within the broader interval.

Positive factors

  • Exceptional gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“4.94”

Context: 1.00

KDD0179Kossou Gold Project · goldGrade: 17.6Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
17.6
Grade Unit
g/t
Intercept
1 m
From
218 m
To
219 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows an exceptional gold grade over a very narrow width, representing a significant high-grade component within the broader interval.

Positive factors

  • Exceptional gold grade, well above bonanza threshold

Negative factors

  • Very narrow intercept width

Evidence · table

“17.60”

Context: 1.00

KDD0179Kossou Gold Project · goldGrade: 2.3Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
2.3
Grade Unit
g/t
Intercept
6 m
From
223 m
To
229 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows a strong gold grade over a good width, further extending mineralization at depth and contributing to the overall resource potential.

Positive factors

  • Strong gold grade over a good width
  • Extends mineralization below previous drilling and remains open at depth

Evidence · table

“2.30”

Context: 6.00

KDD0179Kossou Gold Project · goldGrade: 4.55Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
4.55
Grade Unit
g/t
Intercept
3 m
From
223 m
To
226 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This sub-interval shows an exceptional gold grade over a narrow width, indicating a higher-grade zone within the broader interval.

Positive factors

  • Exceptional gold grade

Evidence · table

“4.55”

Context: 3.00

KDD0179Kossou Gold Project · goldGrade: 4.01Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
KDD0179
Project
Kossou Gold Project
Commodity
gold
Region
côte d’ivoire
Reported Region
Côte d’Ivoire
Ticker
KRI.V

Geometry

Grade
4.01
Grade Unit
g/t
Intercept
1 m
From
251 m
To
252 m
Hole Depth
324 m

Classification

Program
mixed
Sample Type
drill

Location

Easting
228171
Northing
776637
Elevation
280 m
Azimuth
70 °
Dip
-50 °

QA/QC

QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Compositing

Cutoff Grade
0.3
Cutoff Unit
g/t
Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: This intercept shows an exceptional gold grade over a very narrow interval, indicating localized higher-grade mineralization.

Positive factors

  • Exceptional gold grade

Negative factors

  • Very narrow intercept width

Evidence · table

“4.01”

Context: 1.00

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.