KLI: Annual Report to shareholders

Original announcement by asx on

Company
KILLI RESOURCES LIMITED
Ticker
KLI
Exchange
ASX
Region
Western Australia
Primary commodity
Iron ore
Secondary commodities
Gold, Copper, Silver, Molybdenum
Document categories
Resource update, Agreement transaction, Other
Extracted
2026-09-30 05:09:38 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Killi Resources Limited's 2026 Annual Report details the acquisition of the Lodestone Iron Ore Project in Western Australia, which hosts an Inferred Resource of 110 Mt at 33% DTR Mass Recovery, grading 69% Fe in concentrate. The company also strengthened its leadership team and completed capital raises, including a $4.2 million placement, to fund an aggressive 20,000-metre drilling program aimed at expanding the Lodestone resource and advancing its gold-copper exploration projects.

Reasoning: Killi Resources Limited's annual report highlights a transformational acquisition of the Lodestone Iron Ore Project, which includes an existing Inferred Resource and clear development pathway. This, combined with capital raises and board strengthening, positions the company for growth, despite some mixed early exploration results at other projects.

Positive factors

  • Acquisition of a significant iron ore project with an existing Inferred Resource
  • Strengthening of board and management with experienced executives
  • Successful capital raises to fund future exploration and development
  • Clear plans for aggressive exploration and resource growth at the newly acquired project

Negative factors

  • Drilling at Kaa (Mt Rawdon West) did not replicate strongest surface sampling results
  • Exploration inherently carries risk, as stated by the company

Facts used in scoring: 14

Classification and evidence

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource estimate for the Lodestone Iron Project is entirely classified as Inferred, indicating a lower level of geological confidence.

Evidence · table

“Inferred”

Context: 110

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The resource estimate clearly states a '0% DTR MR lower cut-off' for reporting, enabling transparency and comparability.

Evidence · table

“0% DTR MR lower cut-off”

Context: 110

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The resource estimate table explicitly uses 'JORC Category' for classification, indicating compliance with the JORC Code.

Evidence · table

“JORC Category”

Context: Inferred

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The Lodestone Iron Ore Project, including its Mineral Resource, was acquired by Killi Resources Limited during the reporting period, making this the first resource estimate for the project under Killi's ownership.

Evidence · text

“The Lodestone Iron Ore Project includes a substantial Mineral Resource”

Extracted facts

Stored fact records: 14. Some facts used in scoring do not have a stored record.

Resource Estimates (14)

inferredLodestone Iron Ore Project · iron_oreTonnes: 110000000Grade: 69Grade Unit: %View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:1112b32a66cd873b99ba
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
110000000
Grade
69
Grade Unit
%
Cutoff Grade
0
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This is a high-grade inferred iron ore resource, compliant with JORC standards, but its inferred category indicates lower geological confidence.

Positive factors

  • JORC compliant
  • high grade

Negative factors

  • inferred resource

Evidence · table

“69”

Context: 110

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 110000000Grade: 3.9Grade Unit: % SiO2View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:1112b32a66cd873b99ba
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
110000000
Grade
3.9
Grade Unit
% SiO2
Cutoff Grade
0
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported silica content is an important parameter for iron ore concentrate quality, indicating a relatively low impurity level for an inferred resource.

Negative factors

  • silica is a common impurity in iron ore

Evidence · table

“3.9”

Context: 110

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 110000000Grade: 0.08Grade Unit: % Al2O3View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:1112b32a66cd873b99ba
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
110000000
Grade
0.08
Grade Unit
% Al2O3
Cutoff Grade
0
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported alumina content is a key impurity for iron ore concentrate quality, showing a very low level for an inferred resource.

Negative factors

  • alumina is a common impurity in iron ore

Evidence · table

“0.08”

Context: 110

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · iron_oreTonnes: 110000000Grade: 69Grade Unit: %View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:1112b32a66cd873b99ba
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
110000000
Grade
69
Grade Unit
%
Cutoff Grade
10
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This is a high-grade inferred iron ore resource, compliant with JORC standards, but its inferred category indicates lower geological confidence.

Positive factors

  • JORC compliant
  • high grade

Negative factors

  • inferred resource

Evidence · table

“69”

Context: 110

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 110000000Grade: 3.9Grade Unit: % SiO2View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:1112b32a66cd873b99ba
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
110000000
Grade
3.9
Grade Unit
% SiO2
Cutoff Grade
10
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported silica content is an important parameter for iron ore concentrate quality, indicating a relatively low impurity level for an inferred resource.

Negative factors

  • silica is a common impurity in iron ore

Evidence · table

“3.9”

Context: 110

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 110000000Grade: 0.08Grade Unit: % Al2O3View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:1112b32a66cd873b99ba
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
110000000
Grade
0.08
Grade Unit
% Al2O3
Cutoff Grade
10
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported alumina content is a key impurity for iron ore concentrate quality, showing a very low level for an inferred resource.

Negative factors

  • alumina is a common impurity in iron ore

Evidence · table

“0.08”

Context: 110

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · iron_oreTonnes: 98000000Grade: 69Grade Unit: %View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:26c38a84ace9c4fc56f1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
98000000
Grade
69
Grade Unit
%
Cutoff Grade
20
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This is a high-grade inferred iron ore resource, compliant with JORC standards, but its inferred category indicates lower geological confidence.

Positive factors

  • JORC compliant
  • high grade

Negative factors

  • inferred resource

Evidence · table

“69”

Context: 98

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 98000000Grade: 3.9Grade Unit: % SiO2View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:26c38a84ace9c4fc56f1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
98000000
Grade
3.9
Grade Unit
% SiO2
Cutoff Grade
20
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported silica content is an important parameter for iron ore concentrate quality, indicating a relatively low impurity level for an inferred resource.

Negative factors

  • silica is a common impurity in iron ore

Evidence · table

“3.9”

Context: 98

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 98000000Grade: 0.07Grade Unit: % Al2O3View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:26c38a84ace9c4fc56f1
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
98000000
Grade
0.07
Grade Unit
% Al2O3
Cutoff Grade
20
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported alumina content is a key impurity for iron ore concentrate quality, showing a very low level for an inferred resource.

Negative factors

  • alumina is a common impurity in iron ore

Evidence · table

“0.07”

Context: 98

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · iron_oreTonnes: 77000000Grade: 69Grade Unit: %View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:98802e2f799bd333f42f
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
77000000
Grade
69
Grade Unit
%
Cutoff Grade
30
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This is a high-grade inferred iron ore resource, compliant with JORC standards, but its inferred category indicates lower geological confidence.

Positive factors

  • JORC compliant
  • high grade

Negative factors

  • inferred resource

Evidence · table

“69”

Context: 77

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 77000000Grade: 3.4Grade Unit: % SiO2View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
silicon_dioxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:98802e2f799bd333f42f
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
77000000
Grade
3.4
Grade Unit
% SiO2
Cutoff Grade
30
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported silica content is an important parameter for iron ore concentrate quality, indicating a relatively low impurity level for an inferred resource.

Negative factors

  • silica is a common impurity in iron ore

Evidence · table

“3.4”

Context: 77

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 77000000Grade: 0.05Grade Unit: % Al2O3View all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Commodity
aluminium_oxide
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:98802e2f799bd333f42f
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
77000000
Grade
0.05
Grade Unit
% Al2O3
Cutoff Grade
30
Cutoff Unit
% DTR MR

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The reported alumina content is a key impurity for iron ore concentrate quality, showing a very low level for an inferred resource.

Negative factors

  • alumina is a common impurity in iron ore

Evidence · table

“0.05”

Context: 77

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 13Lodestone Iron Ore ProjectView all details
Link to this fact

Identity

Project
Lodestone Iron Ore Project
Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Reporting standards
jorc
Resource group id
resource:608e03ec7730071545aa
Mining method
open_pit

Prior Estimate

Resource Date
2026-06-11

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The acquisition of an 80% interest in the Lodestone Iron Ore Project is a highly material and novel event, providing Killi with an existing resource and a clear pathway to production, funded partly by equity and a royalty.

Positive factors

  • Acquisition of a project with an existing resource
  • Strategic move to diversify and add a bulk commodity project
  • Vendors free carried until final investment decision

Evidence · text

“Killi has entered into agreement to acquire 80% of the issued capital of Yukon Resources Pty Ltd (ACN 609 082 591) (Yukon), the holder of the Lodestone Iron Ore Project. The consideration payable by Killi to the Vendors for the Acquisition comprises: (a) 92,727,273 fully paid ordinary shares in Killi (Consideration Shares), having a total value of $20,400,000 based on a deemed issue price of $0.22 per share; and (b) A 2.5% gross revenue production royalty.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 14View all details
Link to this fact

Identity

Region
australia_wa
Reported Region
Western Australia
Ticker
KLI

Resource scope

Reporting standards
jorc
Mining method
open_pit

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The capital raise provides significant funding for the company's operations and growth initiatives, demonstrating investor confidence.

Positive factors

  • Strengthens Killi’s balance sheet
  • Provides flexibility for quality opportunities
  • Reflects confidence in the Company’s growth

Evidence · text

“On 20 August 2026, the Company completes placement of Tranche 2 of 19,108,235 shares at $0.22, raising approximately $4.2 million.”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.