Karowe diamond mine underground project, Botswana – update

Original announcement by miningweekly on

Company
Lucara Diamond Corp
Ticker
Unavailable
Exchange
Unavailable
Region
Botswana
Primary commodity
Diamond
Secondary commodities
None reported
Document categories
Resource update, Production
Extracted
2026-09-04 08:41:34 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Lucara Diamond Corp has updated its Karowe underground project in Botswana, supported by a 2025 feasibility study. The project includes 37.3 million tonnes of probable reserves at 12.2 cpht and is expected to reach full-scale underground production in the first half of 2028.

Reasoning: The update provides a comprehensive overview of the 2025 feasibility study, confirming significant probable reserves and a robust NPV for the transition to underground mining.

Positive factors

  • Probable reserves established for underground project
  • Strong NPV of $432.1-million
  • Project on schedule for 2028 production despite minor headframe delay
  • Mining licence secured until 2046

Negative factors

  • Six-week delay to production-shaft headframe construction noted

Facts used in scoring: 3

Classification and evidence

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The 2025 mineral reserve estimate is classified as probable reserves.

Evidence · text

“all classified as probable reserves”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document provides an update on the feasibility study and mineral reserve estimate.

Evidence · text

“Karowe diamond mine underground project, Botswana – update”

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Resource Estimates (3)

probablediamondTonnes: 37300000Grade: 12.2Grade Unit: cphtContained Metal: 4547000Contained Unit: ctView all details
Link to this fact

Identity

Commodity
diamond

Resource Data

Category
probable
Tonnes
37300000
Grade
12.2
Grade Unit
cpht
Contained Metal
4547000
Contained Unit
ct

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: Total probable reserves for the project are clearly stated.

Positive factors

  • Significant total reserve tonnage

Evidence · text

“2025 mineral reserve estimate, effective September 30, 2025, totals 37.3-million tonnes containing 4.547-million carats at 12.2 carats per hundred tonnes (cpht), all classified as probable reserves”
probablediamondTonnes: 28500000Grade: 12.9Grade Unit: cphtContained Metal: 3669000Contained Unit: ctView all details
Link to this fact

Identity

Commodity
diamond

Resource Data

Category
probable
Tonnes
28500000
Grade
12.9
Grade Unit
cpht
Contained Metal
3669000
Contained Unit
ct

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: Specific underground portion of the probable reserves is disclosed.

Positive factors

  • High-grade underground component

Evidence · text

“includes underground reserves of 28.5-million tonnes containing 3.669-million carats at 12.9 cpht”
probablediamondTonnes: 7600000Grade: 9.8Grade Unit: cphtContained Metal: 745000Contained Unit: ctView all details
Link to this fact

Identity

Commodity
diamond

Resource Data

Category
probable
Tonnes
7600000
Grade
9.8
Grade Unit
cpht
Contained Metal
745000
Contained Unit
ct

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-03T00:00:00.000Z

Reasoning: Stockpile reserves are clearly delineated from underground reserves.

Positive factors

  • Provides immediate feed via stockpiles

Evidence · text

“stockpile reserves of 7.6-million tonnes containing 745 000 ct at 9.8 cpht”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.