# JLL: McDermitt Drilling Program Underway

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/jll-mcdermitt-drilling-program-underway--1f21e7f0-a37f-415d-9432-cba218bd0f18

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03147684

Publisher: asx

Original announcement: 2026-10-01T23:37:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-02T00:12:37.660Z

Atlas analysis updated: 2026-10-02T00:12:37.660Z

- Company: Jindalee Lithium Limited

- Ticker: JLL

- Exchange: ASX

- Region: Oregon

- Primary commodity: Lithium

- Secondary commodities: Magnesium

- Document categories: Other, Resource update

- Extracted: 2026-10-02 00:12:38 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

Jindalee Lithium has commenced its Phase 1 drilling program at the McDermitt Lithium Project in Oregon, utilizing both RC and diamond rigs. The program focuses on high-priority infill drilling to support a future Feasibility Study and improve resource confidence, with results expected in Q1 2027.

Reasoning: The announcement confirms the start of a significant infill drilling program intended to support a Feasibility Study and potentially upgrade resource classification, though no new assay data is provided.

- Positive factor: commencement of major drilling program

- Positive factor: infill drilling targeting resource upgrade

- Positive factor: approvals received from BLM

- Negative factor: no assay results reported yet

Facts used in scoring: 3

## Classification and evidence

**Infill Drilling**

Polarity: neutral

Story-specific tag

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The release states 'Initial high-priority infill drilling is now underway'.

Evidence · text

> Initial high-priority infill drilling is now underway

## Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

## Resource Estimates (3)

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/jll-mcdermitt-drilling-program-underway--1f21e7f0-a37f-415d-9432-cba218bd0f18#fact-resource-facts-0)

McDermitt · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: McDermitt
- Commodity: lithium
- Region: oregon
- Reported Region: Oregon
- Ticker: JLL

#### Resource scope

- Estimate type: resource
- Resource group id: resource:93b1f2609265e2a91a23

#### Resource Data

- Category: indicated
- Tonnes: 1470000000
- Grade: 1420
- Grade Unit: ppm
- Contained Metal: 11.1
- Contained Unit: mt lce

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2023-02-27T00:00:00.000Z

#### Dates

- Event date: 2026-10-01T00:00:00.000Z

Reasoning: Historical indicated resource stated in the document for comparison.

Evidence · table

> 1,470

Context: 1,470

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.6 years before this release

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/jll-mcdermitt-drilling-program-underway--1f21e7f0-a37f-415d-9432-cba218bd0f18#fact-resource-facts-1)

McDermitt · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: McDermitt
- Commodity: lithium
- Region: oregon
- Reported Region: Oregon
- Ticker: JLL

#### Resource scope

- Estimate type: resource
- Resource group id: resource:b5af77855e40ff10846a

#### Resource Data

- Category: inferred
- Tonnes: 1540000000
- Grade: 1270
- Grade Unit: ppm
- Contained Metal: 10.4
- Contained Unit: mt lce

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2023-02-27T00:00:00.000Z

#### Dates

- Event date: 2026-10-01T00:00:00.000Z

Reasoning: Historical inferred resource stated in the document for comparison.

Evidence · table

> 1,540

Context: 1,540

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.6 years before this release

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/jll-mcdermitt-drilling-program-underway--1f21e7f0-a37f-415d-9432-cba218bd0f18#fact-resource-facts-2)

McDermitt · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: McDermitt
- Commodity: lithium
- Region: oregon
- Reported Region: Oregon
- Ticker: JLL

#### Resource scope

- Estimate type: resource
- Resource group id: resource:61a76fb7ddf6ef105b45

#### Resource Data

- Category: indicated
- Tonnes: 3000000000
- Grade: 1340
- Grade Unit: ppm
- Contained Metal: 21.5
- Contained Unit: mt lce

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2023-02-27T00:00:00.000Z

#### Dates

- Event date: 2026-10-01T00:00:00.000Z

Reasoning: Historical combined indicated and inferred resource stated in the document for comparison.

Evidence · table

> 3,000

Context: 3,000

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.6 years before this release

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
