IVG: Quarterly Activities Report and Cash Flow Report

Original announcement by asx on

Company
InVert Graphite Limited
Ticker
IVG
Exchange
ASX
Region
Tanzania
Primary commodity
Graphite
Secondary commodities
None reported
Document categories
Resource update, Agreement transaction, Capital raise, Metallurgy
Extracted
2026-10-20 23:11:32 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

InVert Graphite announced a maiden Inferred Mineral Resource of 32.2 Mt at 8.0% TGC for 2.56 Mt of contained graphite at its Kumba Deposit in Tanzania. The company also completed the acquisition of RapidGraphite Pty Ltd, securing outright ownership of the RapidPulse™ technology for converting graphite to battery-grade material. This was supported by a A$2.5 million placement, positioning the company to advance its vertically integrated graphite strategy.

Reasoning: The company announced a maiden JORC-compliant Inferred Mineral Resource for its Morogoro project, acquired a novel graphite processing technology, and completed a capital raise, all of which are significant milestones for its vertically integrated strategy.

Positive factors

  • Maiden resource estimate
  • Strategic acquisition of processing technology
  • Successful capital raise
  • Project located near surface
  • High graphite recovery in sighter test
  • JORC compliant

Negative factors

  • Resource is 100% Inferred
  • RapidPulse technology is TRL 4 (lab scale) and novel (risk)
  • Sighter metallurgy is historical

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 5

Classification and evidence

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The document announces a 'Maiden Mineral Resource Estimate' for the Kumba Deposit.

Evidence · text

“Maiden Mineral Resource Estimate”

All Inferrednegative

100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The resource estimate is explicitly stated as 'all Inferred'.

Evidence · text

“all Inferred”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource Estimate was 'prepared and reported in accordance with the JORC Code 2012'.

Evidence · text

“prepared and reported in accordance with the JORC Code 2012”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Competent Person for the MRE was Ms Elizabeth Haren.

Evidence · text

“The Competent Person was Ms Elizabeth Haren.”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The resource is 'Reported at a 4% TGC cut-off'.

Evidence · text

“Reported at a 4% TGC cut-off”

High Recoverypositive · Story-specific tag

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: The historical sighter test achieved a '95.5% recovery of graphite', which is exceptional for graphite flotation.

Evidence · text

“95.5% recovery of graphite”

Free Millingpositive · Story-specific tag

Simple, clean ore amenable to standard processing without oxidation.

Why it applies: The testwork indicated the potential to produce a product using a 'simple flowsheet'.

Evidence · text

“simple flowsheet”

Bench Scale Onlynegative · Story-specific tag

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The RapidPulse™ technology is stated to be at 'Technology Readiness Level (TRL) 4, having been validated at laboratory scale'.

Evidence · text

“RapidPulse™ is currently at Technology Readiness Level (TRL) 4, having been validated at laboratory scale”

Refractory Orenegative · Story-specific tag

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Why it applies: The RapidPulse™ process is described as a 'novel catalytic graphitisation process' for converting carbon into battery-grade graphite, implying a complex material or process.

Evidence · text

“RapidPulse™ is a novel catalytic graphitisation process”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("flotation")

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 2 distinct composites were tested

Extracted facts

Stored fact records: 5. Some facts used in scoring do not have a stored record.

Resource Estimates (3)

inferredMorogoro Project · graphiteTonnes: 32200000Grade: 8Grade Unit: %Contained Metal: 2560000Contained Unit: tView all details
Link to this fact

Identity

Project
Morogoro Project
Commodity
graphite
Region
tanzania
Reported Region
Tanzania
Ticker
IVG

Resource scope

Estimate type
resource
Effective date
2026-09-25T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Elizabeth Haren
Resource group id
resource:052a8f6bce0e38cdc965
Deposit or zone
Kumba Deposit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
32200000
Grade
8
Grade Unit
%
Contained Metal
2560000
Contained Unit
t
Cutoff Grade
4
Cutoff Unit
%

Prior Estimate

Resource Date
2026-08-31

Location

Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: This is a maiden JORC-compliant Inferred Mineral Resource for the Kumba Deposit, establishing a significant graphite inventory near surface, though entirely in the inferred category.

Positive factors

  • Maiden Resource
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed
  • Project located near surface

Negative factors

  • All Inferred

Evidence · table

“8.0”

Context: 32.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Fact 2View all details
Link to this fact

Identity

Region
tanzania
Reported Region
Tanzania
Ticker
IVG

Resource scope

Effective date
2026-09-25T00:00:00.000Z
Reporting standards
jorc
Ownership percent
100 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The successful completion of a A$2.5 million placement provides funding for ongoing activities, including the advancement of the RapidPulse™ technology.

Positive factors

  • Successful capital raise
  • Funds ongoing activities

Evidence · text

“A$2.5 million Placement was completed”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Fact 3View all details
Link to this fact

Identity

Region
tanzania
Reported Region
Tanzania
Ticker
IVG

Resource scope

Effective date
2026-09-25T00:00:00.000Z
Reporting standards
jorc
Ownership percent
100 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The acquisition of RapidGraphite Pty Ltd and its RapidPulse™ technology is a strategic move towards vertical integration, securing a novel process for battery-grade graphite production, though the technology is still at an early TRL.

Positive factors

  • Strategic acquisition of processing technology
  • Outright ownership of technology

Negative factors

  • Technology is novel and at TRL 4 (lab scale)

Evidence · text

“InVert Graphite completed the acquisition of RapidGraphite Pty Ltd (“RapidGraphite”).”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Metallurgical Results (2)

flotationMorogoro Project · graphiteRecovery: 95.5 %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Morogoro Project
Commodity
graphite
Region
tanzania
Reported Region
Tanzania
Ticker
IVG

Test Work

Program Status
preliminary
Test Type
flotation
Processing Route
flotation
Sample
test sample from Kumba

Recovery

Recovery
95.5 %
Recovery Basis
actual_test
Conc. Grade
98
Conc. Grade Unit
%

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-03-14T00:00:00.000Z

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: Historical sighter metallurgical testwork on Kumba material showed high graphite recovery and concentrate grade using a simple flowsheet, indicating good processing potential.

Positive factors

  • High Recovery
  • Free Milling

Evidence · text

“The test sample from Kumba gave a 95.5% recovery of graphite and a concentrate grade of over 98%”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

heat treatment processMorogoro Project · graphiteHead Grade: 97.5Head Grade Unit: %View all details
Link to this fact

Identity

Project
Morogoro Project
Commodity
graphite
Region
tanzania
Reported Region
Tanzania
Ticker
IVG

Test Work

Program Status
preliminary
Test Type
heat treatment process
Processing Route
RapidPulse™ heat treatment
Sample
Fine-grained material of <106μm

Recovery

Head Grade
97.5
Head Grade Unit
%
Conc. Grade
99
Conc. Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: Laboratory testing of the novel RapidPulse™ technology on Morogoro graphite successfully upgraded purity from 97.5% to 99%, demonstrating potential for battery-grade material, though this is at an early TRL.

Positive factors

  • Grade Improvement

Negative factors

  • Bench Scale Only
  • Novel Processing

Evidence · text

“Fine-grained material of <106μm and a purity of 97.5% Total Graphitic Carbon was processed through the RapidPulse™ heat treatment process to provide a 99% purity graphite”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.