Inventus Reports $1.16 Million in Gold Sales and 102% Return on Bulk Sample Cost at Pardo

Original announcement by tmx on

Company
Inventus Mining Corp.
Ticker
IVS
Exchange
TSX
Region
Ontario
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Metallurgy
Extracted
2026-08-21 18:49:13 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Inventus Mining Corp. reported successful results from its Trench 1 bulk sample at the Pardo Project, recovering 172 ounces of gold from 2,512 tonnes at an estimated 2.51 g/t gold. The campaign achieved an 85% metallurgical recovery using a CIL flowsheet, generating gold sales that exceeded direct costs by 102%.

Reasoning: The bulk sample demonstrated strong economics ($1.16M sales vs $578k cost) and solid recovery, though technical reliability was hampered by winter conditions.

Positive factors

  • Strong economic return on bulk sample
  • Proven gold recovery via CIL
  • Significant stockpiles ready for processing

Negative factors

  • Winter conditions impacted throughput and sampling reliability
  • Only 25% of bulk sample processed to date

Facts used in scoring: 1

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The bulk sample was processed using a conventional CIL flowsheet at a mill facility.

Evidence · text

“utilizing a conventional carbon in leach "CIL" flowsheet”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The results are from a bulk sample campaign rather than a full-scale commercial operation, though it provides operating data.

Evidence · text

“Trench 1 bulk sample at its 100%-owned Pardo "River of Gold" Project”

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Metallurgical Results (1)

CILgoldRecovery: 85 %Head Grade: 2.51Head Grade Unit: g/tView all details
Link to this fact

Identity

Commodity
gold
Ticker
IVS

Test Work

Program Status
optimization
Test Type
CIL
Processing Route
milled to P95 (>95% passing 74 um) through a two-stage cyclone overflow re-grind ball mill circuit and then directed into the CIL tanks
Sample
Trench 1 bulk sample (25% processed to date)

Recovery

Recovery
85 %
Recovery Basis
actual_test
Head Grade
2.51
Head Grade Unit
g/t

Reagents

Reagent Notes
Conventional carbon in leach (CIL) flowsheet; milled to P95 (>95% passing 74 um)

Lab

Laboratory
McEwen Mining's Stock Mill

Review

Needs Review
No
Historical
No

Dates

Event date
2026-03-18T00:00:00.000Z

Reasoning: 85% recovery is respectable for CIL, but the company noted winter conditions affected the reliability of the data.

Positive factors

  • Solid recovery for CIL

Negative factors

  • Winter conditions limited reliability of tailings sampling
  • Throughput reduced due to material freezing

Evidence · text

“estimated to have a head grade of 2.51 g/t gold and a metallurgical recovery of 85%”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.