# INTERIM RESULTS FOR SIX MONTHS ENDED 30 JUNE 2026

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/interim-results-for-six-months-ended-30-june-2026--1c1ee026-2ae7-4e66-9d10-98d864da94b8

Original source: https://www.londonstockexchange.com/news-article/ZIOC/interim-results-for-six-months-ended-30-june-2026/17809115

Publisher: lse

Original announcement: 2026-09-29T05:00:05.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-09-29T15:20:03.770Z

Atlas analysis updated: 2026-09-29T15:20:03.770Z

- Company: Zanaga Iron Ore Company Limited

- Ticker: ZIOC

- Exchange: LSE

- Region: Republic of Congo

- Primary commodity: Iron ore

- Secondary commodities: None reported

- Document categories: Metallurgy, Capital raise, Agreement transaction, Other

- Extracted: 2026-09-29 15:20:04 UTC

Narrative sentiment: 0.70 · Bullish

## Minestarters Atlas summary

Zanaga Iron Ore Company Limited announced its unaudited interim results for the first half of 2026, highlighting a substantial increase in the Zanaga Project's NPV following an April 2026 economic update based on Direct Reduction Iron \(DRI\) product. The company successfully raised £5.6 million \(US$7.6 million\) through an equity placement and is progressing a strategic investment with Red Arc Minerals LLC, including a potential US$500 million government-backed financing. Additionally, the company commenced a bulk sampling program to confirm its revised DRI flowsheet at pilot scale, aiming to advance the project towards a Final Investment Decision.

Reasoning: The company reported strong progress on its iron ore project, including a significant NPV increase from an economic update based on DRI product, a successful equity raise, and ongoing strategic investment discussions, despite an increased interim loss.

- Positive factor: Significant increase in project NPV following economic update

- Positive factor: Successful equity raise providing funding for project advancement

- Positive factor: Positive laboratory test work confirming high-grade DRI product capability

- Positive factor: Progress on strategic investment and potential large-scale financing

- Positive factor: Identified substantial life-of-mine cash cost savings

- Negative factor: Continued operating loss for the period

- Negative factor: Extension of strategic investment transaction timetable

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 2

## Classification and evidence

**Free Milling**

Polarity: positive

Story-specific tag

Definition: Simple, clean ore amenable to standard processing without oxidation.

Why it applies: Positive test work results confirmed the ability to produce DRI-grade pellet feed concentrate with low impurities, indicating a clean ore amenable to standard processing.

Evidence · text

> Positive test work results confirming the ability of the Zanaga Iron Ore Project \(the "Zanaga Project" or the "Project"\) to produce DRI-grade pellet feed concentrate with low impurities

**Bench Scale Only**

Polarity: negative

Story-specific tag

Definition: Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The reported concentrate grades are from 'laboratory-scale DRI test work' and the bulk sampling program is designed to confirm the flowsheet at 'pilot scale', indicating the current results are not yet from pilot-scale testing.

Evidence · text

> Following successful laboratory-scale DRI test work completed in mid-2025, ZIOC commissioned detailed conceptual and feasibility-level designs to refine capital and operating cost estimates to ±20% accuracy.

**Mill Route**

Polarity: neutral

Story-specific tag

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: The project involves a 'pellet plant' and a 'concentrator complex', which are typical mill-based processing methods.

Evidence · text

> A feasibility study was completed to verify the likely costs to construct and operate both 2.5 Mtpa hot and 2.5 Mtpa cold pellet plants in the Republic of Congo.

**Single Domain Only**

Polarity: negative

Definition: Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Metallurgical Results (2)

### laboratory

[Link to this fact](https://atlas-staging.minestarters.com/news/interim-results-for-six-months-ended-30-june-2026--1c1ee026-2ae7-4e66-9d10-98d864da94b8#fact-metallurgical-facts-0)

Zanaga Project · iron\_ore

#### Identity

- Project: Zanaga Project
- Commodity: iron\_ore
- Region: republic of congo
- Reported Region: Republic of Congo
- Ticker: ZIOC

#### Test Work

- Program Status: scoping
- Test Type: laboratory
- Processing Route: pellet feed production
- Sample: Stage One \(hematite\) concentrate

#### Recovery

- Conc. Grade: 68.5
- Conc. Grade Unit: %Fe

#### Reagents

- Reagent Notes: 1.05 %SiO₂, 0.47 %Al₂O₃, 0.034 %P

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Laboratory test work confirmed the ability to produce high-grade DRI pellet feed concentrate from Stage One hematite with low impurities, which significantly increases the project's revenue potential.

- Positive factor: Confirms ability to produce high-grade DRI pellet feed

- Positive factor: Low impurity levels

- Positive factor: Increases project revenue potential

Evidence · text

> Stage One \(hematite\) concentrate grade results: 68.5 %Fe, 1.05 %SiO₂, 0.47 %Al₂O₃, 0.034 %P

### laboratory

[Link to this fact](https://atlas-staging.minestarters.com/news/interim-results-for-six-months-ended-30-june-2026--1c1ee026-2ae7-4e66-9d10-98d864da94b8#fact-metallurgical-facts-1)

Zanaga Project · iron\_ore

#### Identity

- Project: Zanaga Project
- Commodity: iron\_ore
- Region: republic of congo
- Reported Region: Republic of Congo
- Ticker: ZIOC

#### Test Work

- Program Status: scoping
- Test Type: laboratory
- Processing Route: pellet feed production
- Sample: Stage Two \(magnetite\) concentrate

#### Recovery

- Conc. Grade: 69.1
- Conc. Grade Unit: %Fe

#### Reagents

- Reagent Notes: 1.96 %SiO₂, 0.40 %Al₂O₃, 0.028 %P

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Laboratory test work confirmed the ability to produce high-grade DRI pellet feed concentrate from Stage Two magnetite with low impurities, which significantly increases the project's revenue potential.

- Positive factor: Confirms ability to produce high-grade DRI pellet feed

- Positive factor: Low impurity levels

- Positive factor: Increases project revenue potential

Evidence · text

> Stage Two \(magnetite\) concentrate grade results: 69.1 %Fe, 1.96 %SiO₂, 0.40 %Al₂O₃, 0.028 %P

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.