HRN: Annual Report to shareholders
Original announcement by asx on
- Company
- Horizon Gold Limited
- Ticker
- HRN
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Gold
- Secondary commodities
- None reported
- Document categories
- Resource update, Drill results, Production
- Extracted
- 2026-09-22 23:28:41 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Horizon Gold Limited's Annual Report highlights a Definitive Feasibility Study (DFS) for its Gum Creek Gold Project in Western Australia, confirming robust economics for a 2.4Mtpa operation targeting 880,000 ounces of recovered gold over a ten-year mine life. The project boasts a maiden Ore Reserve of 728,400 ounces and an updated Mineral Resource Estimate (MRE) showing an 8% increase in total ounces and a 26% increase in gold grade. Additionally, the report details positive exploration drill results from multiple prospects, further expanding the project's potential.
Reasoning: The annual report details a highly positive DFS outcome, a significant MRE update with increased grade and ounces, a maiden Ore Reserve, and numerous strong exploration drill intercepts, all contributing to a clear path to production.
Positive factors
- Definitive Feasibility Study confirms robust economics for Gum Creek Gold Project.
- Maiden Ore Reserve of 728koz gold established.
- Mineral Resource Estimate increased by 8% in ounces and 26% in grade.
- Strong exploration results continue to expand understanding of project potential.
- Project targets 880,000 ounces recovered gold over 10-year mine life with low AISC.
Facts used in scoring: 115
Extracted facts
Stored fact records: 115. Some facts used in scoring do not have a stored record.
Drill Results (14)
HWWB001Gum Creek · goldGrade: 2.26Grade Unit: g/tIntercept: 72 mView all detailsHide details
Identity
- Hole ID
- HWWB001
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 2.26
- Grade Unit
- g/t
- Intercept
- 72 m
- From
- 18 m
- To
- 90 m
- Intercept Depth
- 18 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB001:18-90
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This intercept confirms mineralisation continuity at Howards with a good grade over a substantial width.
Positive factors
- Good grade over a significant width.
- Confirms continuity of mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“72m @ 2.26g/t Au from 18m including 18m @ 5.09g/t Au from 27m (HWWB001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“72m @ 2.26g/t Au from 18m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB001Gum Creek · goldGrade: 5.09Grade Unit: g/tIntercept: 18 mView all detailsHide details
Identity
- Hole ID
- HWWB001
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 5.09
- Grade Unit
- g/t
- Intercept
- 18 m
- From
- 27 m
- To
- 45 m
- Intercept Depth
- 27 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB001:27-45
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This high-grade sub-interval indicates a significant mineralised zone at Howards.
Positive factors
- High-grade sub-interval within a broader zone.
- Confirms strong mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“18m @ 5.09g/t Au from 27m (HWWB001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“18m @ 5.09g/t Au from 27m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB001Gum Creek · goldGrade: 1.23Grade Unit: g/tIntercept: 23 mView all detailsHide details
Identity
- Hole ID
- HWWB001
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 1.23
- Grade Unit
- g/t
- Intercept
- 23 m
- From
- 99 m
- To
- 122 m
- Intercept Depth
- 99 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB001:99-122
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This intercept confirms mineralisation continuity at Howards with a good grade over a moderate width.
Positive factors
- Good grade over a moderate width.
- Confirms continuity of mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“23m @ 1.23g/t Au from 99m including 3m @ 3.31g/t Au from 112m (HWWB001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“23m @ 1.23g/t Au from 99m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB001Gum Creek · goldGrade: 3.31Grade Unit: g/tIntercept: 3 mView all detailsHide details
Identity
- Hole ID
- HWWB001
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 3.31
- Grade Unit
- g/t
- Intercept
- 3 m
- From
- 112 m
- To
- 115 m
- Intercept Depth
- 112 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB001:112-115
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This high-grade sub-interval indicates a significant mineralised zone at Howards.
Positive factors
- High-grade sub-interval within a broader zone.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“3m @ 3.31g/t Au from 112m (HWWB001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“3m @ 3.31g/t Au from 112m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB001Gum Creek · goldGrade: 4.58Grade Unit: g/tIntercept: 39 mView all detailsHide details
Identity
- Hole ID
- HWWB001
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 4.58
- Grade Unit
- g/t
- Intercept
- 39 m
- From
- 133 m
- To
- 172 m
- Intercept Depth
- 133 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB001:133-172
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This high-grade intercept confirms strong mineralisation at Howards over a significant width.
Positive factors
- High-grade intercept over a significant width.
- Confirms strong mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“39m @ 4.58g/t Au from 133m including 17m @ 9.86g/t Au from 148m (HWWB001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“39m @ 4.58g/t Au from 133m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB001Gum Creek · goldGrade: 9.86Grade Unit: g/tIntercept: 17 mView all detailsHide details
Identity
- Hole ID
- HWWB001
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 9.86
- Grade Unit
- g/t
- Intercept
- 17 m
- From
- 148 m
- To
- 165 m
- Intercept Depth
- 148 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB001:148-165
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This very high-grade sub-interval highlights bonanza-grade mineralisation at Howards.
Positive factors
- Very high-grade sub-interval.
- Indicates bonanza-grade mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“17m @ 9.86g/t Au from 148m (HWWB001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: Grade of 9.86 g/t Au is well above the exceptional threshold for open pit gold (5 g/t).
Evidence · text
“9.86g/t Au”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“17m @ 9.86g/t Au from 148m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB002Gum Creek · goldGrade: 1.27Grade Unit: g/tIntercept: 124 mView all detailsHide details
Identity
- Hole ID
- HWWB002
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 1.27
- Grade Unit
- g/t
- Intercept
- 124 m
- From
- 7 m
- To
- 131 m
- Intercept Depth
- 7 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB002:7-131
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This intercept confirms mineralisation continuity at Howards with a good grade over an exceptional width.
Positive factors
- Good grade over an exceptional width.
- Confirms continuity of mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“124m @ 1.27g/t Au from 7m including 16m @ 2.97g/t Au from 88m (HWWB002)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“124m @ 1.27g/t Au from 7m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB002Gum Creek · goldGrade: 2.97Grade Unit: g/tIntercept: 16 mView all detailsHide details
Identity
- Hole ID
- HWWB002
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 2.97
- Grade Unit
- g/t
- Intercept
- 16 m
- From
- 88 m
- To
- 104 m
- Intercept Depth
- 88 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB002:88-104
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This good grade sub-interval indicates a significant mineralised zone at Howards.
Positive factors
- Good grade sub-interval within a broader zone.
- Confirms strong mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“16m @ 2.97g/t Au from 88m (HWWB002)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“16m @ 2.97g/t Au from 88m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB003Gum Creek · goldGrade: 1.08Grade Unit: g/tIntercept: 80 mView all detailsHide details
Identity
- Hole ID
- HWWB003
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 1.08
- Grade Unit
- g/t
- Intercept
- 80 m
- From
- 18 m
- To
- 98 m
- Intercept Depth
- 18 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB003:18-98
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This intercept confirms mineralisation continuity at Howards with a good grade over a substantial width.
Positive factors
- Good grade over a significant width.
- Confirms continuity of mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“80m @ 1.08g/t Au from 18m including 10m @ 2.12g/t Au from 83m (HWWB003)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“80m @ 1.08g/t Au from 18m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB003Gum Creek · goldGrade: 2.12Grade Unit: g/tIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- HWWB003
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 2.12
- Grade Unit
- g/t
- Intercept
- 10 m
- From
- 83 m
- To
- 93 m
- Intercept Depth
- 83 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB003:83-93
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This good grade sub-interval indicates a significant mineralised zone at Howards.
Positive factors
- Good grade sub-interval within a broader zone.
- Confirms strong mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“10m @ 2.12g/t Au from 83m (HWWB003)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“10m @ 2.12g/t Au from 83m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB003Gum Creek · goldGrade: 4.02Grade Unit: g/tIntercept: 38 mView all detailsHide details
Identity
- Hole ID
- HWWB003
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 4.02
- Grade Unit
- g/t
- Intercept
- 38 m
- From
- 112 m
- To
- 150 m
- Intercept Depth
- 112 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB003:112-150
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This high-grade intercept confirms strong mineralisation at Howards over a significant width.
Positive factors
- High-grade intercept over a significant width.
- Confirms strong mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“38m @ 4.02g/t Au from 112m including 21m @ 6.08g/t Au from 121m (HWWB003)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“38m @ 4.02g/t Au from 112m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
HWWB003Gum Creek · goldGrade: 6.08Grade Unit: g/tIntercept: 21 mView all detailsHide details
Identity
- Hole ID
- HWWB003
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 6.08
- Grade Unit
- g/t
- Intercept
- 21 m
- From
- 121 m
- To
- 142 m
- Intercept Depth
- 121 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- HWWB003:121-142
- Mining Method
- open_pit
Location
- Location
- Howards
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This very high-grade sub-interval highlights bonanza-grade mineralisation at Howards.
Positive factors
- Very high-grade sub-interval.
- Indicates bonanza-grade mineralisation.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“21m @ 6.08g/t Au from 121m (HWWB003)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: Grade of 6.08 g/t Au is well above the exceptional threshold for open pit gold (5 g/t).
Evidence · text
“6.08g/t Au”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“21m @ 6.08g/t Au from 121m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
KFDD003Gum Creek · goldGrade: 11.35Grade Unit: g/tIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- KFDD003
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 11.35
- Grade Unit
- g/t
- Intercept
- 4 m
- From
- 431 m
- To
- 435 m
- Intercept Depth
- 431 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- KFDD003:431-435
- Mining Method
- underground
Location
- Location
- Kingfisher
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This very high-grade intercept confirms the presence of high-grade gold shoots at Kingfisher.
Positive factors
- Very high-grade intercept.
- Confirms high-grade gold shoots.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“4m @ 11.35g/t Au from 431m including 1m @ 42.2g/t Au from 432m (KFDD003)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: Grade of 11.35 g/t Au is strong for underground gold (7 g/t).
Evidence · text
“11.35g/t Au”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“4m @ 11.35g/t Au from 431m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: Release includes QA/QC disclosure via Competent Person statement and JORC compliance.
Evidence · text
“The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: Refractory mineralisation with pyrrhotite and arsenopyrite is noted in the MRE, which applies to the project.
Evidence · text
“Due to the presence of pyrrhotite affecting oxygen and cyanide consumption, transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron, Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato, Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are classified as refractory.”
KFDD003Gum Creek · goldGrade: 42.2Grade Unit: g/tIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- KFDD003
- Project
- Gum Creek
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- HRN
Geometry
- Grade
- 42.2
- Grade Unit
- g/t
- Intercept
- 1 m
- From
- 432 m
- To
- 433 m
- Intercept Depth
- 432 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- KFDD003:432-433
- Mining Method
- underground
Location
- Location
- Kingfisher
- Loc. Source
- document
QA/QC
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks
Deleterious
- Deleterious Flag
- Yes
- Deleterious Elements
- pyrrhotite, arsenopyrite
Metal Equivalent
- Assumptions Disclosed
- No
Compositing
- Dilution Disclosed
- Yes
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Positive factors
- Exceptional bonanza-grade sub-interval.
Evidence · text
“1m @ 42.2g/t Au from 432m (KFDD003)”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Deleterious Elements Presentnegative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Why it applies: deleterious_flag is true
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "Our exploration results continue to demonstrate that our 2.3 million ounce Mineral Resource which is spread across 80 ki"
Resource Estimates (101)
indicatedGum Creek Gold Project · goldTonnes: 6661000Grade: 1.86Grade Unit: g/tContained Metal: 399Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a56cee6d626b6af727dc
- Deposit or zone
- Swan/Swift OC
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 6661000
- Grade
- 1.86
- Grade Unit
- g/t
- Contained Metal
- 399
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a substantial indicated resource for the Swan/Swift open pit, contributing significantly to the overall project.
Positive factors
- Significant indicated resource for open pit mining.
Evidence · table
“1.86”
Context: 6,661,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 335000Grade: 1.54Grade Unit: g/tContained Metal: 16.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:6a6db4798a1acf960356
- Deposit or zone
- Swan/Swift OC
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 335000
- Grade
- 1.54
- Grade Unit
- g/t
- Contained Metal
- 16.6
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource adds to the project's potential but has lower confidence than indicated resources.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.54”
Context: 335,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 6996000Grade: 1.85Grade Unit: g/tContained Metal: 415.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:ea62f3608157142e802a
- Deposit or zone
- Swan/Swift OC
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 6996000
- Grade
- 1.85
- Grade Unit
- g/t
- Contained Metal
- 415.6
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Swan/Swift open pit, combining indicated and inferred categories.
Positive factors
- Significant total resource for open pit mining.
Evidence · table
“1.85”
Context: 6,996,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 935000Grade: 4.45Grade Unit: g/tContained Metal: 133.7Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:81295e1dc4ba4396673f
- Deposit or zone
- Swan UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 935000
- Grade
- 4.45
- Grade Unit
- g/t
- Contained Metal
- 133.7
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a high-grade indicated resource for the Swan underground deposit, showing strong potential.
Positive factors
- High-grade indicated resource for underground mining.
Evidence · table
“4.45”
Context: 935,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 798000Grade: 3.9Grade Unit: g/tContained Metal: 100Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d76beced50be151664c6
- Deposit or zone
- Swan UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 798000
- Grade
- 3.9
- Grade Unit
- g/t
- Contained Metal
- 100
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Swan underground is high-grade but has lower confidence.
Positive factors
- Adds to overall high-grade resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“3.90”
Context: 798,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1733000Grade: 4.19Grade Unit: g/tContained Metal: 233.7Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a23a7ef3c951a444667b
- Deposit or zone
- Swan UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1733000
- Grade
- 4.19
- Grade Unit
- g/t
- Contained Metal
- 233.7
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total high-grade resource for the Swan underground deposit.
Positive factors
- Significant total high-grade resource for underground mining.
Evidence · table
“4.19”
Context: 1,733,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 35000Grade: 2.22Grade Unit: g/tContained Metal: 2.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:0c3466679e115c820922
- Deposit or zone
- Swift UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 35000
- Grade
- 2.22
- Grade Unit
- g/t
- Contained Metal
- 2.5
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A small indicated resource for the Swift underground deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“2.22”
Context: 35,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 813000Grade: 2.54Grade Unit: g/tContained Metal: 66.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:9caaa630934cc63da07c
- Deposit or zone
- Swift UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 813000
- Grade
- 2.54
- Grade Unit
- g/t
- Contained Metal
- 66.3
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Swift underground adds to the project's potential but has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“2.54”
Context: 813,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 848000Grade: 2.52Grade Unit: g/tContained Metal: 68.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:1ac825fc22249f4e0fd3
- Deposit or zone
- Swift UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 848000
- Grade
- 2.52
- Grade Unit
- g/t
- Contained Metal
- 68.8
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Swift underground deposit.
Positive factors
- Adds to total resource for underground mining.
Evidence · table
“2.52”
Context: 848,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 2759000Grade: 4.37Grade Unit: g/tContained Metal: 387.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:ccd22dd0a70524a0732d
- Deposit or zone
- Wilsons UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 2759000
- Grade
- 4.37
- Grade Unit
- g/t
- Contained Metal
- 387.4
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a substantial high-grade indicated resource for the Wilsons underground deposit.
Positive factors
- Significant high-grade indicated resource for underground mining.
Evidence · table
“4.37”
Context: 2,759,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 126000Grade: 3.16Grade Unit: g/tContained Metal: 12.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:e1302bb3c93264099006
- Deposit or zone
- Wilsons UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 126000
- Grade
- 3.16
- Grade Unit
- g/t
- Contained Metal
- 12.8
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Wilsons underground is high-grade but has lower confidence.
Positive factors
- Adds to overall high-grade resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“3.16”
Context: 126,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 2885000Grade: 4.31Grade Unit: g/tContained Metal: 400.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:c31b6a37cd4b0488954c
- Deposit or zone
- Wilsons UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2885000
- Grade
- 4.31
- Grade Unit
- g/t
- Contained Metal
- 400.2
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total high-grade resource for the Wilsons underground deposit.
Positive factors
- Significant total high-grade resource for underground mining.
Evidence · table
“4.31”
Context: 2,885,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 6095000Grade: 1.13Grade Unit: g/tContained Metal: 221.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d167e73e61a1b6b605f7
- Deposit or zone
- Howards
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 6095000
- Grade
- 1.13
- Grade Unit
- g/t
- Contained Metal
- 221.8
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a substantial indicated resource for the Howards deposit.
Positive factors
- Significant indicated resource.
Evidence · table
“1.13”
Context: 6,095,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 751000Grade: 0.97Grade Unit: g/tContained Metal: 23.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:e53f90216206e8504265
- Deposit or zone
- Howards
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 751000
- Grade
- 0.97
- Grade Unit
- g/t
- Contained Metal
- 23.5
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Howards adds to the project's potential but has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“0.97”
Context: 751,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 6846000Grade: 1.11Grade Unit: g/tContained Metal: 245.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:29f28519da0bbe45a6d1
- Deposit or zone
- Howards
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 6846000
- Grade
- 1.11
- Grade Unit
- g/t
- Contained Metal
- 245.3
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Howards deposit.
Positive factors
- Significant total resource.
Evidence · table
“1.11”
Context: 6,846,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 1139000Grade: 2.05Grade Unit: g/tContained Metal: 75.1Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:5036eeca92bc5a93029e
- Deposit or zone
- Kingfisher OC
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 1139000
- Grade
- 2.05
- Grade Unit
- g/t
- Contained Metal
- 75.1
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a good indicated resource for the Kingfisher open pit.
Positive factors
- Good indicated resource for open pit mining.
Evidence · table
“2.05”
Context: 1,139,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 79000Grade: 1.5Grade Unit: g/tContained Metal: 3.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:875d0150649d32d95bb1
- Deposit or zone
- Kingfisher OC
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 79000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 3.8
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Kingfisher open pit is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.50”
Context: 79,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1218000Grade: 2.01Grade Unit: g/tContained Metal: 78.9Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a35bcbdb3a5f7a26b840
- Deposit or zone
- Kingfisher OC
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1218000
- Grade
- 2.01
- Grade Unit
- g/t
- Contained Metal
- 78.9
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Kingfisher open pit.
Positive factors
- Good total resource for open pit mining.
Evidence · table
“2.01”
Context: 1,218,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 94000Grade: 2.71Grade Unit: g/tContained Metal: 8.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:aee81e7c44f22eba1b1c
- Deposit or zone
- Kingfisher UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 94000
- Grade
- 2.71
- Grade Unit
- g/t
- Contained Metal
- 8.2
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A small indicated resource for the Kingfisher underground deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“2.71”
Context: 94,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 949000Grade: 3.45Grade Unit: g/tContained Metal: 105.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:7ba3778c077dcbc185a6
- Deposit or zone
- Kingfisher UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 949000
- Grade
- 3.45
- Grade Unit
- g/t
- Contained Metal
- 105.3
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Kingfisher underground is high-grade but has lower confidence.
Positive factors
- Adds to overall high-grade resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“3.45”
Context: 949,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1043000Grade: 3.38Grade Unit: g/tContained Metal: 113.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:38078b22b72378d3cd9f
- Deposit or zone
- Kingfisher UG
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1043000
- Grade
- 3.38
- Grade Unit
- g/t
- Contained Metal
- 113.5
- Contained Unit
- koz
- Cutoff Grade
- 1.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total high-grade resource for the Kingfisher underground deposit.
Positive factors
- Adds to total high-grade resource for underground mining.
Evidence · table
“3.38”
Context: 1,043,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 2152000Grade: 1.6Grade Unit: g/tContained Metal: 110.6Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a5c5e5e3ec7815eaafa2
- Deposit or zone
- Heron
Resource Data
- Category
- inferred
- Tonnes
- 2152000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 110.6
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Heron, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.60”
Context: 2,152,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
indicatedGum Creek Gold Project · goldTonnes: 817000Grade: 1.27Grade Unit: g/tContained Metal: 33.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:0c763f9f908ddd1f1ce5
- Deposit or zone
- Eagle
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 817000
- Grade
- 1.27
- Grade Unit
- g/t
- Contained Metal
- 33.4
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Eagle deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.27”
Context: 817,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1202000Grade: 1.29Grade Unit: g/tContained Metal: 50Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:9809296da6e19483cb04
- Deposit or zone
- Eagle
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1202000
- Grade
- 1.29
- Grade Unit
- g/t
- Contained Metal
- 50
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Eagle adds to the project's potential but has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.29”
Context: 1,202,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 2019000Grade: 1.28Grade Unit: g/tContained Metal: 83.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:dfb018c4feb0637fee68
- Deposit or zone
- Eagle
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2019000
- Grade
- 1.28
- Grade Unit
- g/t
- Contained Metal
- 83.4
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Eagle deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.28”
Context: 2,019,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1481000Grade: 1.66Grade Unit: g/tContained Metal: 78.9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d9c8f95ec7801a2d29ca
- Deposit or zone
- Heron South
Resource Data
- Category
- inferred
- Tonnes
- 1481000
- Grade
- 1.66
- Grade Unit
- g/t
- Contained Metal
- 78.9
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Heron South, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.66”
Context: 1,481,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
indicatedGum Creek Gold Project · goldTonnes: 1947000Grade: 1.04Grade Unit: g/tContained Metal: 65.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:567c91eccd2b767bc493
- Deposit or zone
- Shiraz
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 1947000
- Grade
- 1.04
- Grade Unit
- g/t
- Contained Metal
- 65.4
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Shiraz deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.04”
Context: 1,947,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 372000Grade: 0.94Grade Unit: g/tContained Metal: 11.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:b0661630aa899235dfde
- Deposit or zone
- Shiraz
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 372000
- Grade
- 0.94
- Grade Unit
- g/t
- Contained Metal
- 11.2
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Shiraz is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“0.94”
Context: 372,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 2319000Grade: 1.03Grade Unit: g/tContained Metal: 76.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d713cc8634d52f268745
- Deposit or zone
- Shiraz
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2319000
- Grade
- 1.03
- Grade Unit
- g/t
- Contained Metal
- 76.6
- Contained Unit
- koz
- Cutoff Grade
- 0.4
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Shiraz deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.03”
Context: 2,319,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 557000Grade: 1.54Grade Unit: g/tContained Metal: 27.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:16f456b695e0ed570ad4
- Deposit or zone
- Wyooda
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 557000
- Grade
- 1.54
- Grade Unit
- g/t
- Contained Metal
- 27.5
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Wyooda deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.54”
Context: 557,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 718000Grade: 1.56Grade Unit: g/tContained Metal: 36.1Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:198d865c2e62d40ddd7f
- Deposit or zone
- Wyooda
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 718000
- Grade
- 1.56
- Grade Unit
- g/t
- Contained Metal
- 36.1
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Wyooda adds to the project's potential but has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.56”
Context: 718,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1275000Grade: 1.55Grade Unit: g/tContained Metal: 63.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:ae868f598cee23d42156
- Deposit or zone
- Wyooda
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1275000
- Grade
- 1.55
- Grade Unit
- g/t
- Contained Metal
- 63.6
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Wyooda deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.55”
Context: 1,275,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 921000Grade: 1.82Grade Unit: g/tContained Metal: 54Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:3e25a36c274c1f2310e0
- Deposit or zone
- Snook
Resource Data
- Category
- inferred
- Tonnes
- 921000
- Grade
- 1.82
- Grade Unit
- g/t
- Contained Metal
- 54
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2022-07-25
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-07-25T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Snook, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.82”
Context: 921,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 4.2 years before this release
indicatedGum Creek Gold Project · goldTonnes: 905000Grade: 1.31Grade Unit: g/tContained Metal: 38.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:70e49a3871f84d4bbb67
- Deposit or zone
- Toedter
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 905000
- Grade
- 1.31
- Grade Unit
- g/t
- Contained Metal
- 38.2
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Toedter deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.31”
Context: 905,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 99000Grade: 1.32Grade Unit: g/tContained Metal: 4.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:9a5280a3cacbe9a676e8
- Deposit or zone
- Toedter
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 99000
- Grade
- 1.32
- Grade Unit
- g/t
- Contained Metal
- 4.2
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Toedter is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.32”
Context: 99,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 1004000Grade: 1.31Grade Unit: g/tContained Metal: 42.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:49c39c54f3177eb668c4
- Deposit or zone
- Toedter
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1004000
- Grade
- 1.31
- Grade Unit
- g/t
- Contained Metal
- 42.4
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Toedter deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.31”
Context: 1,004,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 591000Grade: 1.38Grade Unit: g/tContained Metal: 26.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:58b6c5c953aa5bbec6ce
- Deposit or zone
- Hawk
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 591000
- Grade
- 1.38
- Grade Unit
- g/t
- Contained Metal
- 26.2
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Hawk deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.38”
Context: 591,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 167000Grade: 1.27Grade Unit: g/tContained Metal: 6.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:642414584aea74555c3a
- Deposit or zone
- Hawk
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 167000
- Grade
- 1.27
- Grade Unit
- g/t
- Contained Metal
- 6.8
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Hawk is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.27”
Context: 167,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 758000Grade: 1.35Grade Unit: g/tContained Metal: 33Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:0a7dcadbbc7b0ed675cd
- Deposit or zone
- Hawk
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 758000
- Grade
- 1.35
- Grade Unit
- g/t
- Contained Metal
- 33
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Hawk deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.35”
Context: 758,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 431000Grade: 1.49Grade Unit: g/tContained Metal: 20.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:e438b5652cca8e9b1d01
- Deposit or zone
- Specimen Well
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 431000
- Grade
- 1.49
- Grade Unit
- g/t
- Contained Metal
- 20.6
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Specimen Well deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.49”
Context: 431,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 114000Grade: 1.31Grade Unit: g/tContained Metal: 4.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:151e227687f98a582ee2
- Deposit or zone
- Specimen Well
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 114000
- Grade
- 1.31
- Grade Unit
- g/t
- Contained Metal
- 4.8
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Specimen Well is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.31”
Context: 114,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 545000Grade: 1.45Grade Unit: g/tContained Metal: 25.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:115937f459a99acc4786
- Deposit or zone
- Specimen Well
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 545000
- Grade
- 1.45
- Grade Unit
- g/t
- Contained Metal
- 25.4
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Specimen Well deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.45”
Context: 545,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 427000Grade: 1.42Grade Unit: g/tContained Metal: 19.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:80d824bdb0dd582945d0
- Deposit or zone
- Wedge
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 427000
- Grade
- 1.42
- Grade Unit
- g/t
- Contained Metal
- 19.5
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Wedge deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.42”
Context: 427,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 56000Grade: 2.83Grade Unit: g/tContained Metal: 5.1Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a693059b6132f9dcd80e
- Deposit or zone
- Wedge
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 56000
- Grade
- 2.83
- Grade Unit
- g/t
- Contained Metal
- 5.1
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Wedge is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“2.83”
Context: 56,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 483000Grade: 1.58Grade Unit: g/tContained Metal: 24.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:e9a54c4cb8edfb9bb0b1
- Deposit or zone
- Wedge
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 483000
- Grade
- 1.58
- Grade Unit
- g/t
- Contained Metal
- 24.6
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Wedge deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.58”
Context: 483,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 479000Grade: 1.42Grade Unit: g/tContained Metal: 21.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:118dbdb35edff0f32cb1
- Deposit or zone
- Camel Bore
Resource Data
- Category
- inferred
- Tonnes
- 479000
- Grade
- 1.42
- Grade Unit
- g/t
- Contained Metal
- 21.8
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2022-07-25
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-07-25T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Camel Bore, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.42”
Context: 479,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 4.2 years before this release
indicatedGum Creek Gold Project · goldTonnes: 318000Grade: 1.46Grade Unit: g/tContained Metal: 14.9Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:9f6ad32cf99025e5978d
- Deposit or zone
- Melbourne Bitter
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 318000
- Grade
- 1.46
- Grade Unit
- g/t
- Contained Metal
- 14.9
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Melbourne Bitter deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.46”
Context: 318,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 157000Grade: 1.27Grade Unit: g/tContained Metal: 6.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:0deed6aefdc8d6d88d59
- Deposit or zone
- Melbourne Bitter
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 157000
- Grade
- 1.27
- Grade Unit
- g/t
- Contained Metal
- 6.4
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Melbourne Bitter is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.27”
Context: 157,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 475000Grade: 1.39Grade Unit: g/tContained Metal: 21.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:680d44f7ce2fd93fdbb9
- Deposit or zone
- Melbourne Bitter
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 475000
- Grade
- 1.39
- Grade Unit
- g/t
- Contained Metal
- 21.3
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Melbourne Bitter deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.39”
Context: 475,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedGum Creek Gold Project · goldTonnes: 295000Grade: 1.52Grade Unit: g/tContained Metal: 14.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:722b45c12e9dace3f6b7
- Deposit or zone
- Hyperno-Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 295000
- Grade
- 1.52
- Grade Unit
- g/t
- Contained Metal
- 14.4
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Hyperno-Reliance deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.52”
Context: 295,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 183000Grade: 1.02Grade Unit: g/tContained Metal: 6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:cb4ed3b0696db7eced3b
- Deposit or zone
- Hyperno-Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 183000
- Grade
- 1.02
- Grade Unit
- g/t
- Contained Metal
- 6
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Hyperno-Reliance is small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.02”
Context: 183,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 478000Grade: 1.33Grade Unit: g/tContained Metal: 20.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:52f40752ba313d2677d1
- Deposit or zone
- Hyperno-Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 478000
- Grade
- 1.33
- Grade Unit
- g/t
- Contained Metal
- 20.4
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Hyperno-Reliance deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.33”
Context: 478,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 496000Grade: 1.25Grade Unit: g/tContained Metal: 20Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:f67c298df99bb8c12fd2
- Deposit or zone
- Kearrys
Resource Data
- Category
- inferred
- Tonnes
- 496000
- Grade
- 1.25
- Grade Unit
- g/t
- Contained Metal
- 20
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Kearrys, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.25”
Context: 496,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 326000Grade: 1.81Grade Unit: g/tContained Metal: 19Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:5fd0b64138576e7dc52c
- Deposit or zone
- Psi
Resource Data
- Category
- inferred
- Tonnes
- 326000
- Grade
- 1.81
- Grade Unit
- g/t
- Contained Metal
- 19
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2022-07-25
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-07-25T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Psi, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.81”
Context: 326,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 4.2 years before this release
indicatedGum Creek Gold Project · goldTonnes: 229000Grade: 1.53Grade Unit: g/tContained Metal: 11.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:981819cf6a9273c093f2
- Deposit or zone
- Deep South Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 229000
- Grade
- 1.53
- Grade Unit
- g/t
- Contained Metal
- 11.3
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: A moderate indicated resource for the Deep South Reliance deposit.
Positive factors
- Adds to indicated resource base.
Evidence · table
“1.53”
Context: 229,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 17000Grade: 0.91Grade Unit: g/tContained Metal: 0.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:2222421c4ccec5eebef7
- Deposit or zone
- Deep South Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 17000
- Grade
- 0.91
- Grade Unit
- g/t
- Contained Metal
- 0.5
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This inferred resource for Deep South Reliance is very small and has lower confidence.
Positive factors
- Adds to overall resource base.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“0.91”
Context: 17,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 246000Grade: 1.49Grade Unit: g/tContained Metal: 11.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:ea543f2c0d7acba204b6
- Deposit or zone
- Deep South Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 246000
- Grade
- 1.49
- Grade Unit
- g/t
- Contained Metal
- 11.8
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total resource for the Deep South Reliance deposit.
Positive factors
- Adds to total resource.
Evidence · table
“1.49”
Context: 246,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 251000Grade: 1.43Grade Unit: g/tContained Metal: 11.5Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:ca8c6fd5caf14dd9af9d
- Deposit or zone
- Orion
Resource Data
- Category
- inferred
- Tonnes
- 251000
- Grade
- 1.43
- Grade Unit
- g/t
- Contained Metal
- 11.5
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2022-07-25
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-07-25T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orion, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.43”
Context: 251,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 4.2 years before this release
inferredGum Creek Gold Project · goldTonnes: 305000Grade: 1.16Grade Unit: g/tContained Metal: 11.4Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:11858af4241682ec9035
- Deposit or zone
- Eagles Peak
Resource Data
- Category
- inferred
- Tonnes
- 305000
- Grade
- 1.16
- Grade Unit
- g/t
- Contained Metal
- 11.4
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Eagles Peak, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.16”
Context: 305,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 258000Grade: 1.25Grade Unit: g/tContained Metal: 10.4Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a398fb49a30d8e06d774
- Deposit or zone
- Wahoo
Resource Data
- Category
- inferred
- Tonnes
- 258000
- Grade
- 1.25
- Grade Unit
- g/t
- Contained Metal
- 10.4
- Contained Unit
- koz
- Cutoff Grade
- 0.8
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2022-07-25
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2022-07-25T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Wahoo, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.25”
Context: 258,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 4.2 years before this release
inferredGum Creek Gold Project · goldTonnes: 129000Grade: 1.33Grade Unit: g/tContained Metal: 5.5Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:686977c22b7221ed1445
- Deposit or zone
- Fangio
Resource Data
- Category
- inferred
- Tonnes
- 129000
- Grade
- 1.33
- Grade Unit
- g/t
- Contained Metal
- 5.5
- Contained Unit
- koz
- Cutoff Grade
- 0.6
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Fangio, providing context but not new information.
Positive factors
- Historical resource contributes to overall project understanding.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.33”
Context: 129,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
indicatedGum Creek Gold Project · goldTonnes: 26721000Grade: 1.9Grade Unit: g/tContained Metal: 1629.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:bac9921d140d037c69ad
- Deposit or zone
- Total
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 26721000
- Grade
- 1.9
- Grade Unit
- g/t
- Contained Metal
- 1629.3
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total indicated resource for the Gum Creek Gold Project.
Positive factors
- Significant indicated resource base for the entire project.
Evidence · table
“1.90”
Context: 26,721,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 11248000Grade: 1.86Grade Unit: g/tContained Metal: 672.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:471096f7355ae3d68f9f
- Deposit or zone
- Total
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 11248000
- Grade
- 1.86
- Grade Unit
- g/t
- Contained Metal
- 672.3
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total inferred resource for the Gum Creek Gold Project, adding to overall potential.
Positive factors
- Adds to overall resource base for the project.
Negative factors
- Inferred category has lower geological confidence.
Evidence · table
“1.86”
Context: 11,248,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 37969000Grade: 1.89Grade Unit: g/tContained Metal: 2301.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:b5af1be2346dec78375c
- Deposit or zone
- Total
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 37969000
- Grade
- 1.89
- Grade Unit
- g/t
- Contained Metal
- 2301.6
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2025-11-04
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total mineral resource for the Gum Creek Gold Project, combining all categories.
Positive factors
- Significant total resource for the Gum Creek Gold Project.
Evidence · table
“1.89”
Context: 37,969,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 800000Grade: 0.99Grade Unit: g/tContained Metal: 25Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:78b5c04448095b463f8f
- Deposit or zone
- Eagle
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 800000
- Grade
- 0.99
- Grade Unit
- g/t
- Contained Metal
- 25
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is part of the maiden Ore Reserve for the project, specifically for the Eagle deposit.
Positive factors
- Maiden Ore Reserve for Eagle deposit.
Evidence · table
“0.99”
Context: 0.8
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 700000Grade: 1.07Grade Unit: g/tContained Metal: 25Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:9555fd7f0f5eed025d1d
- Deposit or zone
- Hawk
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 700000
- Grade
- 1.07
- Grade Unit
- g/t
- Contained Metal
- 25
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is part of the maiden Ore Reserve for the project, specifically for the Hawk deposit.
Positive factors
- Maiden Ore Reserve for Hawk deposit.
Evidence · table
“1.07”
Context: 0.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 5800000Grade: 0.99Grade Unit: g/tContained Metal: 186Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:92e39d4925b9ce00774d
- Deposit or zone
- Howards
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 5800000
- Grade
- 0.99
- Grade Unit
- g/t
- Contained Metal
- 186
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a substantial part of the maiden Ore Reserve for the project, specifically for the Howards deposit.
Positive factors
- Significant maiden Ore Reserve for Howards deposit.
Evidence · table
“0.99”
Context: 5.8
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 300000Grade: 1.23Grade Unit: g/tContained Metal: 12Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:d84f80feb46bea6276cb
- Deposit or zone
- Hyperno-Reliance
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 300000
- Grade
- 1.23
- Grade Unit
- g/t
- Contained Metal
- 12
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is part of the maiden Ore Reserve for the project, specifically for the Hyperno-Reliance deposit.
Positive factors
- Maiden Ore Reserve for Hyperno-Reliance deposit.
Evidence · table
“1.23”
Context: 0.3
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 1500000Grade: 1.51Grade Unit: g/tContained Metal: 71Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:89f728161ba14455aa26
- Deposit or zone
- Kingfisher
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 1500000
- Grade
- 1.51
- Grade Unit
- g/t
- Contained Metal
- 71
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a significant part of the maiden Ore Reserve for the project, specifically for the Kingfisher deposit.
Positive factors
- Maiden Ore Reserve for Kingfisher deposit.
Evidence · table
“1.51”
Context: 1.5
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 8600000Grade: 1.42Grade Unit: g/tContained Metal: 392Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:118434960009c72f3fb9
- Deposit or zone
- Swan/Swift
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 8600000
- Grade
- 1.42
- Grade Unit
- g/t
- Contained Metal
- 392
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is the largest component of the maiden Ore Reserve, highlighting the economic viability of Swan/Swift.
Positive factors
- Largest maiden Ore Reserve for Swan/Swift deposits.
Evidence · table
“1.42”
Context: 8.6
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 500000Grade: 1.04Grade Unit: g/tContained Metal: 18Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:01f9f8267fd415319cae
- Deposit or zone
- Wedge
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 500000
- Grade
- 1.04
- Grade Unit
- g/t
- Contained Metal
- 18
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is part of the maiden Ore Reserve for the project, specifically for the Wedge deposit.
Positive factors
- Maiden Ore Reserve for Wedge deposit.
Evidence · table
“1.04”
Context: 0.5
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableGum Creek Gold Project · goldTonnes: 18200000Grade: 1.24Grade Unit: g/tContained Metal: 728Contained Unit: kozView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:2bcf58d60f56e00979de
- Deposit or zone
- Total Probable
- Mining method
- combined
- Ownership percent
- 100 %
Resource Data
- Category
- probable
- Tonnes
- 18200000
- Grade
- 1.24
- Grade Unit
- g/t
- Contained Metal
- 728
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This represents the total maiden Ore Reserve for the Gum Creek Gold Project, underpinning the DFS.
Positive factors
- Significant maiden Ore Reserve for the Gum Creek Gold Project.
Evidence · table
“1.24”
Context: 18.2
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredGum Creek Gold Project · goldTonnes: 12715000Grade: 1.06Grade Unit: g/tContained Metal: 434.1Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:39d11b3c972cd7e9ea57
- Deposit or zone
- Swan/Swift OC
Resource Data
- Category
- inferred
- Tonnes
- 12715000
- Grade
- 1.06
- Grade Unit
- g/t
- Contained Metal
- 434.1
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Swan/Swift OC from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.06”
Context: 12,715,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 527000Grade: 6.99Grade Unit: g/tContained Metal: 118.5Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:2a1a38d724be6a59841e
- Deposit or zone
- Swan UG
Resource Data
- Category
- inferred
- Tonnes
- 527000
- Grade
- 6.99
- Grade Unit
- g/t
- Contained Metal
- 118.5
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical high-grade resource estimate for Swan UG from May 2023, used for comparison.
Positive factors
- Historical high-grade resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“6.99”
Context: 527,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 138000Grade: 5.72Grade Unit: g/tContained Metal: 25.4Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:e414b7e5390b2f505593
- Deposit or zone
- Swift UG
Resource Data
- Category
- inferred
- Tonnes
- 138000
- Grade
- 5.72
- Grade Unit
- g/t
- Contained Metal
- 25.4
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical high-grade resource estimate for Swift UG from May 2023, used for comparison.
Positive factors
- Historical high-grade resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“5.72”
Context: 138,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 2267000Grade: 5.36Grade Unit: g/tContained Metal: 391Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:b7ed67852342bbb074eb
- Deposit or zone
- Wilsons UG
Resource Data
- Category
- inferred
- Tonnes
- 2267000
- Grade
- 5.36
- Grade Unit
- g/t
- Contained Metal
- 391
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical high-grade resource estimate for Wilsons UG from May 2023, used for comparison.
Positive factors
- Historical high-grade resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“5.36”
Context: 2,267,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 10200000Grade: 0.81Grade Unit: g/tContained Metal: 266.9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:6da2ac2884655a2052ac
- Deposit or zone
- Howards
Resource Data
- Category
- inferred
- Tonnes
- 10200000
- Grade
- 0.81
- Grade Unit
- g/t
- Contained Metal
- 266.9
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Howards from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“0.81”
Context: 10,200,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 890000Grade: 1.58Grade Unit: g/tContained Metal: 45.1Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:6d5ffb318348b806efd4
- Deposit or zone
- Kingfisher OC
Resource Data
- Category
- inferred
- Tonnes
- 890000
- Grade
- 1.58
- Grade Unit
- g/t
- Contained Metal
- 45.1
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Kingfisher OC from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.58”
Context: 890,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 1276000Grade: 3.31Grade Unit: g/tContained Metal: 135.7Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d96b0fcecca3b2210dc4
- Deposit or zone
- Kingfisher UG
Resource Data
- Category
- inferred
- Tonnes
- 1276000
- Grade
- 3.31
- Grade Unit
- g/t
- Contained Metal
- 135.7
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical high-grade resource estimate for Kingfisher UG from May 2023, used for comparison.
Positive factors
- Historical high-grade resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“3.31”
Context: 1,276,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 2152000Grade: 1.6Grade Unit: g/tContained Metal: 110.6Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:a5c5e5e3ec7815eaafa2
- Deposit or zone
- Heron
Resource Data
- Category
- inferred
- Tonnes
- 2152000
- Grade
- 1.6
- Grade Unit
- g/t
- Contained Metal
- 110.6
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Heron from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.60”
Context: 2,152,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 1481000Grade: 1.66Grade Unit: g/tContained Metal: 78.9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d9c8f95ec7801a2d29ca
- Deposit or zone
- Heron South
Resource Data
- Category
- inferred
- Tonnes
- 1481000
- Grade
- 1.66
- Grade Unit
- g/t
- Contained Metal
- 78.9
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Heron South from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.66”
Context: 1,481,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 3603000Grade: 0.68Grade Unit: g/tContained Metal: 78.9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:1fb12cd93eb9649011f3
- Deposit or zone
- Shiraz
Resource Data
- Category
- inferred
- Tonnes
- 3603000
- Grade
- 0.68
- Grade Unit
- g/t
- Contained Metal
- 78.9
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Shiraz from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“0.68”
Context: 3,603,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 1159000Grade: 1.85Grade Unit: g/tContained Metal: 68.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:212b4c5704db522a8c42
- Deposit or zone
- Eagle
Resource Data
- Category
- inferred
- Tonnes
- 1159000
- Grade
- 1.85
- Grade Unit
- g/t
- Contained Metal
- 68.8
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Eagle from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.85”
Context: 1,159,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 1292000Grade: 1.56Grade Unit: g/tContained Metal: 64.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:8a2167e287de82d69764
- Deposit or zone
- Wyooda
Resource Data
- Category
- inferred
- Tonnes
- 1292000
- Grade
- 1.56
- Grade Unit
- g/t
- Contained Metal
- 64.8
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Wyooda from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.56”
Context: 1,292,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 921000Grade: 1.82Grade Unit: g/tContained Metal: 54Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:1285c19f281d208312f6
- Deposit or zone
- Snook
Resource Data
- Category
- inferred
- Tonnes
- 921000
- Grade
- 1.82
- Grade Unit
- g/t
- Contained Metal
- 54
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Snook from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.82”
Context: 921,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 849000Grade: 1.26Grade Unit: g/tContained Metal: 34.4Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:bc20ea3ef1576223fdb0
- Deposit or zone
- Hawk
Resource Data
- Category
- inferred
- Tonnes
- 849000
- Grade
- 1.26
- Grade Unit
- g/t
- Contained Metal
- 34.4
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Hawk from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.26”
Context: 849,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 689000Grade: 1.54Grade Unit: g/tContained Metal: 34Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:f90be0643b231df9b668
- Deposit or zone
- Toedter
Resource Data
- Category
- inferred
- Tonnes
- 689000
- Grade
- 1.54
- Grade Unit
- g/t
- Contained Metal
- 34
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Toedter from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.54”
Context: 689,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 529000Grade: 1.5Grade Unit: g/tContained Metal: 25.5Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:fd42f22a35158241376b
- Deposit or zone
- Specimen Well
Resource Data
- Category
- inferred
- Tonnes
- 529000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 25.5
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Specimen Well from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.50”
Context: 529,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 487000Grade: 1.52Grade Unit: g/tContained Metal: 23.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:8b32bcf81f8613dd093a
- Deposit or zone
- Wedge
Resource Data
- Category
- inferred
- Tonnes
- 487000
- Grade
- 1.52
- Grade Unit
- g/t
- Contained Metal
- 23.8
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Wedge from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.52”
Context: 487,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 479000Grade: 1.42Grade Unit: g/tContained Metal: 21.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:438cc50054684ab7fc41
- Deposit or zone
- Camel Bore
Resource Data
- Category
- inferred
- Tonnes
- 479000
- Grade
- 1.42
- Grade Unit
- g/t
- Contained Metal
- 21.8
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Camel Bore from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.42”
Context: 479,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 496000Grade: 1.25Grade Unit: g/tContained Metal: 20Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:f67c298df99bb8c12fd2
- Deposit or zone
- Kearrys
Resource Data
- Category
- inferred
- Tonnes
- 496000
- Grade
- 1.25
- Grade Unit
- g/t
- Contained Metal
- 20
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Kearrys from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.25”
Context: 496,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 326000Grade: 1.81Grade Unit: g/tContained Metal: 19Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:d40d617865ce9729cbba
- Deposit or zone
- Psi
Resource Data
- Category
- inferred
- Tonnes
- 326000
- Grade
- 1.81
- Grade Unit
- g/t
- Contained Metal
- 19
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Psi from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.81”
Context: 326,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 445000Grade: 1.31Grade Unit: g/tContained Metal: 18.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:047f810b50462c5ad631
- Deposit or zone
- Hyperno-Reliance
Resource Data
- Category
- inferred
- Tonnes
- 445000
- Grade
- 1.31
- Grade Unit
- g/t
- Contained Metal
- 18.8
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Hyperno-Reliance from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.31”
Context: 445,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 362000Grade: 1.44Grade Unit: g/tContained Metal: 16.8Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:8457c6ae6141c1d3c326
- Deposit or zone
- Melbourne Bitter
Resource Data
- Category
- inferred
- Tonnes
- 362000
- Grade
- 1.44
- Grade Unit
- g/t
- Contained Metal
- 16.8
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Melbourne Bitter from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.44”
Context: 362,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 224000Grade: 1.62Grade Unit: g/tContained Metal: 11.7Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:3815170e5020eaec38cc
- Deposit or zone
- Deep South Reliance
Resource Data
- Category
- inferred
- Tonnes
- 224000
- Grade
- 1.62
- Grade Unit
- g/t
- Contained Metal
- 11.7
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Deep South Reliance from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.62”
Context: 224,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 305000Grade: 1.16Grade Unit: g/tContained Metal: 11.4Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:11858af4241682ec9035
- Deposit or zone
- Eagles Peak
Resource Data
- Category
- inferred
- Tonnes
- 305000
- Grade
- 1.16
- Grade Unit
- g/t
- Contained Metal
- 11.4
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Eagles Peak from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.16”
Context: 305,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 251000Grade: 1.43Grade Unit: g/tContained Metal: 11.5Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:3207acc8910fdf2afee6
- Deposit or zone
- Orion
Resource Data
- Category
- inferred
- Tonnes
- 251000
- Grade
- 1.43
- Grade Unit
- g/t
- Contained Metal
- 11.5
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orion from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.43”
Context: 251,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 258000Grade: 1.25Grade Unit: g/tContained Metal: 10.4Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:0f7f2631945fb1ac444c
- Deposit or zone
- Wahoo
Resource Data
- Category
- inferred
- Tonnes
- 258000
- Grade
- 1.25
- Grade Unit
- g/t
- Contained Metal
- 10.4
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Wahoo from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.25”
Context: 258,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 129000Grade: 1.33Grade Unit: g/tContained Metal: 5.5Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:686977c22b7221ed1445
- Deposit or zone
- Fangio
Resource Data
- Category
- inferred
- Tonnes
- 129000
- Grade
- 1.33
- Grade Unit
- g/t
- Contained Metal
- 5.5
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical resource estimate for Fangio from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.33”
Context: 129,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
inferredGum Creek Gold Project · goldTonnes: 44450000Grade: 1.5Grade Unit: g/tContained Metal: 2137.3Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Leigh Ryan
- Resource group id
- resource:b079d2bb5daf21343cc5
- Deposit or zone
- Total
Resource Data
- Category
- inferred
- Tonnes
- 44450000
- Grade
- 1.5
- Grade Unit
- g/t
- Contained Metal
- 2137.3
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2023-05-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-05-15T00:00:00.000Z
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: This is a historical total resource estimate for Gum Creek Gold Project from May 2023, used for comparison.
Positive factors
- Historical resource provides context for project evolution.
Negative factors
- This is a historical estimate, not new information.
Evidence · table
“1.50”
Context: 44,450,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.4 years before this release
Fact 101Gum Creek Gold Project · goldView all detailsHide details
Identity
- Project
- Gum Creek Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- HRN
Resource scope
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Auralia Mining Consulting Pty Ltd
- Resource group id
- resource:911f53d252fb8a23e0f3
- Mining method
- combined
- Ownership percent
- 100 %
Prior Estimate
- Resource Date
- 2026-07-22
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-22T00:00:00.000Z
Reasoning: The DFS results present a highly attractive economic profile for the Gum Creek Gold Project, demonstrating strong profitability and a clear path to production.
Positive factors
- DFS confirms robust project economics with a 10-year mine life.
- High gold production target of 880.1 koz.
- Low All-in Sustaining Cost (AISC) of A$2,995/oz.
- Strong NPV and IRR figures indicate high profitability.
- Short payback period of 23 months.
Evidence · table
“10.0”
Context: Life of Mine (LOM)
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.