HAR: Phase 2 Underground Drilling at Lincoln Commenced

Original announcement by asx on

Company
Haranga Resources Limited
Ticker
HAR
Exchange
ASX
Region
Unavailable
Primary commodity
Gold
Secondary commodities
Uranium
Document categories
Resource update, Drill results
Extracted
2026-09-21 23:13:04 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Haranga Resources has commenced its Phase 2 underground diamond drilling programme at the Lincoln Gold Project. The 16-hole programme aims to improve geological confidence and support the potential reclassification of Inferred resources to Indicated resources for an upcoming Preliminary Feasibility Study.

Reasoning: The announcement marks the start of a strategic underground drilling campaign aimed at de-risking the Lincoln Gold Project for a future PFS, though no new assay results are provided.

Positive factors

  • Commencement of Phase 2 underground drilling to improve resource confidence
  • Successful completion of mine dewatering programme enabling access
  • Clear objective to upgrade Inferred resources to Indicated for PFS support

Negative factors

  • High proportion of gold (77%) currently held in Inferred category
  • Drilling results are not yet reported; this is a commencement announcement

Facts used in scoring: 6

Classification and evidence

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The Phase 2 programme aims to improve geological confidence and reclassify resources, which is characteristic of infill/definition drilling.

Evidence · text

“Improve geological confidence and knowledge of the Mineral Resources”

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The Lincoln project is described as having a recently defined maiden resource.

Evidence · text

“has recently defined its maiden mineral resource”

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Drill Results (1)

DDH0294LincolnView all details
Link to this fact

Identity

Hole ID
DDH0294
Project
Lincoln
Region
australia_vic
Reported Region
australia_vic
Ticker
HAR

Geometry

Hole Depth
230 m

Classification

Program
resource
Sample Type
drill
Mining Method
underground

Location

Location
XC11
Loc. Source
document

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-09-21T00:00:00.000Z

Reasoning: Hole has commenced drilling but no assay results are reported in this document.

Evidence · text

“drilling of DDH0294 commenced at XC11 on 17 September”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

Resource Estimates (5)

indicatedLincoln Gold Project · goldTonnes: 429000Grade: 6.6Grade Unit: g/tContained Metal: 91000Contained Unit: oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Lincoln Gold Project
Commodity
gold
Ticker
HAR

Resource scope

Estimate type
resource
Resource group id
resource:892abcdcdb1333fe9b6b
Deposit or zone
Lincoln-Comet
Resource basis
gross

Resource Data

Category
indicated
Tonnes
429000
Grade
6.6
Grade Unit
g/t
Contained Metal
91000
Contained Unit
oz au
Cutoff Grade
2
Cutoff Unit
g/t Au

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-25T00:00:00.000Z

Dates

Event date
2026-09-21T00:00:00.000Z

Reasoning: Restatement of the May 2026 resource estimate.

Evidence · table

“429,000”

Context: 429,000

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

inferredLincoln Gold Project · goldTonnes: 1068000Grade: 5.4Grade Unit: g/tContained Metal: 184000Contained Unit: oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Lincoln Gold Project
Commodity
gold
Ticker
HAR

Resource scope

Estimate type
resource
Resource group id
resource:022d77ae0f79052465a3
Deposit or zone
Lincoln-Comet
Resource basis
gross

Resource Data

Category
inferred
Tonnes
1068000
Grade
5.4
Grade Unit
g/t
Contained Metal
184000
Contained Unit
oz au
Cutoff Grade
2
Cutoff Unit
g/t Au

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-25T00:00:00.000Z

Dates

Event date
2026-09-21T00:00:00.000Z

Reasoning: Restatement of the May 2026 resource estimate.

Evidence · table

“1,068,000”

Context: 1,068,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

inferredLincoln Gold Project · goldTonnes: 961000Grade: 4.1Grade Unit: g/tContained Metal: 127000Contained Unit: oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Lincoln Gold Project
Commodity
gold
Ticker
HAR

Resource scope

Estimate type
resource
Resource group id
resource:d632d752b4ef9ca01608
Deposit or zone
Medean
Resource basis
gross

Resource Data

Category
inferred
Tonnes
961000
Grade
4.1
Grade Unit
g/t
Contained Metal
127000
Contained Unit
oz au
Cutoff Grade
2
Cutoff Unit
g/t Au

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-25T00:00:00.000Z

Dates

Event date
2026-09-21T00:00:00.000Z

Reasoning: Restatement of the May 2026 resource estimate.

Evidence · table

“961,000”

Context: 961,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

indicatedSaraya Uranium Project · uraniumTonnes: 4100000Grade: 740Grade Unit: ppm eU3O8Contained Metal: 6.7Contained Unit: mlbs eu3o8Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Saraya Uranium Project
Commodity
uranium
Ticker
HAR

Resource scope

Estimate type
resource
Resource group id
resource:cfadbf74ea235592ad7f
Deposit or zone
Saraya
Resource basis
gross

Resource Data

Category
indicated
Tonnes
4100000
Grade
740
Grade Unit
ppm eU3O8
Contained Metal
6.7
Contained Unit
mlbs eu3o8
Cutoff Grade
250
Cutoff Unit
ppm eU3O8

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-08-27T00:00:00.000Z

Dates

Event date
2026-09-21T00:00:00.000Z

Reasoning: Restatement of the August 2024 resource estimate.

Evidence · table

“4.1”

Context: 4.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

inferredSaraya Uranium Project · uraniumTonnes: 10400000Grade: 475Grade Unit: ppm eU3O8Contained Metal: 10.9Contained Unit: mlbs eu3o8Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Saraya Uranium Project
Commodity
uranium
Ticker
HAR

Resource scope

Estimate type
resource
Resource group id
resource:093b233606d959b7c9a5
Deposit or zone
Saraya
Resource basis
gross

Resource Data

Category
inferred
Tonnes
10400000
Grade
475
Grade Unit
ppm eU3O8
Contained Metal
10.9
Contained Unit
mlbs eu3o8
Cutoff Grade
250
Cutoff Unit
ppm eU3O8

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-08-27T00:00:00.000Z

Dates

Event date
2026-09-21T00:00:00.000Z

Reasoning: Restatement of the August 2024 resource estimate.

Evidence · table

“10.4”

Context: 10.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.