# GT1: Annual Report to shareholders

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03145512

Publisher: asx

Original announcement: 2026-09-29T07:32:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-09-29T14:39:59.013Z

Atlas analysis updated: 2026-09-29T14:39:59.013Z

- Company: Green Technology Metals Limited

- Ticker: GT1

- Exchange: ASX

- Region: Ontario, Canada

- Primary commodity: Lithium

- Secondary commodities: Rubidium, Tantalum

- Document categories: Resource update, Metallurgy, Other

- Extracted: 2026-09-29 14:39:59 UTC

Narrative sentiment: 0.90 · Bullish

## Minestarters Atlas summary

Green Technology Metals Limited reported a pivotal year marked by significant de-risking milestones, including the successful production of battery-grade lithium hydroxide from Seymour spodumene concentrate with over 94% recovery. The company also announced a maiden JORC-compliant rubidium resource at Seymour, positioning it as a globally significant project, and identified tantalum as another potential byproduct. These achievements, coupled with strong government support and progress towards a Final Investment Decision for the Seymour project, underscore the company's advancement in building an integrated North American lithium business.

Reasoning: The company reported successful production of battery-grade lithium hydroxide, a maiden rubidium resource, and identified tantalum as a potential byproduct, all supported by strong government backing and progress towards a Final Investment Decision for the Seymour project, significantly de-risking its integrated North American lithium business.

- Positive factor: Successful production of battery-grade lithium hydroxide monohydrate with high recovery \(94%\) from Seymour spodumene concentrate, de-risking the integrated strategy.

- Positive factor: Maiden JORC-compliant rubidium resource estimate at Seymour \(8.3 Mt @ 0.27% Rb2O\), positioning it as globally significant and adding potential revenue streams.

- Positive factor: Identification of tantalum as an additional critical mineral stream for potential inclusion in the Seymour DFS flowsheet.

- Positive factor: Strong government support and funding \(C$5.47M from CMIF, C$500k grant from CMIF\) for critical minerals projects in Canada.

- Positive factor: Significant progress on permitting and environmental assessment for the Seymour project, with completion of EA process confirmed.

- Positive factor: DFS for Seymour targeted for completion in Q4 2026, with a focus on optimizing layout and reducing environmental impact and CAPEX.

- Negative factor: Lithium Conversion Facility PFS currently on hold, indicating a delay in the downstream strategy.

- Negative factor: DFS for Seymour required rework due to design improvements, potentially impacting timelines or costs.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 6

## Classification and evidence

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The Company elected to publish certain DFS components in accordance with the Canadian NI 43-101 Technical Reporting Standard, in addition to the ASX reporting framework, to meet the requirements of government funding agencies and financiers.

Evidence · text

> The Company elected to publish certain DFS components in accordance with the Canadian NI 43-101 Technical Reporting Standard, in addition to the ASX reporting framework, to meet the requirements of government funding agencies and financiers.

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The Mineral Resource estimates were reported by the Company in accordance with Listing Rule 5.8 on 3 April 2025 \(Root, updated\), 21 November 2023 \(Seymour, amended\) and 24 July 2025 \(Seymour Rubidium\).

Evidence · text

> The Mineral Resource estimates above were reported by the Company in accordance with Listing Rule 5.8 on 3 April 2025 \(Root, updated\), 21 November 2023 \(Seymour, amended\) and 24 July 2025 \(Seymour Rubidium\).

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: A strategic technical review of Seymour's geological database during the year identified a substantial rubidium resource, with a maiden JORC-compliant Mineral Resource of 8.3 million tonnes at 0.27% Rb₂O.

Evidence · text

> A strategic technical review of Seymour's geological database during the year identified a substantial rubidium resource, with a maiden JORC-compliant Mineral Resource of 8.3 million tonnes at 0.27% Rb₂O

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Seymour Lithium Project has an Indicated Resource of 6.1Mt @ 1.25% Li2O. The Root Lithium Project has an Indicated Resource of 10Mt @ 1.33% Li2O. The Seymour Rubidium Project has an Indicated Resource of 6.2Mt at 0.28% Rb₂O.

Evidence · text

> Resource: 10.3Mt @ 1.03% Li2O \(6.1Mt @ 1.25% Li2O Indicated\)

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Seymour Rubidium Project has an Inferred Resource of 2.1Mt at 0.25% Rb₂O.

Evidence · text

> 6.2Mt Indicated at 0.28% and 2.1Mt Inferred at 0.25%\)

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: The pilot program processed 600kg of concentrate, confirming EcoPro's flowsheet with overall recoveries averaging greater than 94% and producing a high-purity 56.5% LiOH.H₂O product with low impurities.

Evidence · text

> The pilot program processed 600kg of concentrate, confirming EcoPro's flowsheet with overall recoveries averaging greater than 94% and producing a high-purity 56.5% LiOH.H₂O product with low impurities.

**High Recovery**

Polarity: positive

Definition: Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Recoveries averaging greater than 94% for lithium hydroxide production is at or above the exceptional band for the mill/CIL processing route.

Evidence · text

> recoveries averaging greater than 94%

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: The concentrates from the mine are amenable to conversion using a standard sulphation roast flow sheet, which is a mill route.

Evidence · text

> proving our concentrates from the mine are amenable to conversion using a standard sulphation roast flow sheet.

**Byproduct Commodity**

Polarity: neutral

Definition: The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: Rubidium and tantalum are both on the United States Critical Minerals list and offer potential additional by-product revenue that would enhance Seymour's project economics.

Evidence · text

> Rubidium and tantalum are both on the United States Critical Minerals list and offer potential additional by-product revenue that would enhance Seymour's project economics

**Multi-Domain Tested**

Polarity: positive

Definition: Variability across ore domains \(oxide, transition, fresh\) has been addressed.

Why it applies: 2 distinct composites were tested

## Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

## Resource Estimates (4)

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc#fact-resource-facts-0)

Seymour Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Seymour Lithium Project
- Commodity: lithium
- Region: canada\_on
- Reported Region: Ontario, Canada
- Ticker: GT1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:3396dd5f7391971d70ed

#### Resource Data

- Category: indicated
- Tonnes: 6100000
- Grade: 1.25
- Grade Unit: % Li2O

#### Prior Estimate

- Resource Date: 2023-11-21

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2023-11-21T00:00:00.000Z

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: The indicated resource for Seymour Lithium provides a solid foundation for the project, though it is a restatement of a prior estimate.

- Positive factor: Indicated category provides reasonable geological confidence for future economic studies.

- Negative factor: This is a restatement of a prior estimate, not new information.

Evidence · text

> Resource: 10.3Mt @ 1.03% Li2O \(6.1Mt @ 1.25% Li2O Indicated\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**Stale Estimate**

Polarity: negative

Definition: Effective date is &gt;2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc#fact-resource-facts-1)

Root Lithium Project · lithium

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Root Lithium Project
- Commodity: lithium
- Region: canada\_on
- Reported Region: Ontario, Canada
- Ticker: GT1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:9d144267632748905033

#### Resource Data

- Category: indicated
- Tonnes: 10000000
- Grade: 1.33
- Grade Unit: % Li2O

#### Prior Estimate

- Resource Date: 2025-04-03

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2025-04-03T00:00:00.000Z

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: The indicated resource for Root Lithium provides a significant long-term feed for the company's strategy, though it is a restatement of a prior estimate.

- Positive factor: Indicated category provides reasonable geological confidence for future economic studies.

- Positive factor: Larger scale than Seymour project, offering long-term feed potential.

- Negative factor: This is a restatement of a prior estimate, not new information.

Evidence · text

> Resource: 20.1Mt @ 1.24% Li2O \(10Mt @ 1.33% Li2O Indicated\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc#fact-resource-facts-2)

Seymour Project \(North Aubry\) · rubidium

#### Identity

- Project: Seymour Project \(North Aubry\)
- Commodity: rubidium
- Region: canada\_on
- Reported Region: Ontario, Canada
- Ticker: GT1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:3b76876e5c37e942301a

#### Resource Data

- Category: indicated
- Tonnes: 6200000
- Grade: 0.28
- Grade Unit: % Rb2O
- Contained Metal: 17360
- Contained Unit: t

#### Prior Estimate

- Resource Date: 2025-07-24

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: The maiden indicated rubidium resource at Seymour is a significant positive, adding a new critical mineral stream with good grade and confidence.

- Positive factor: Maiden resource estimate for rubidium adds significant value and potential revenue stream.

- Positive factor: Indicated category provides reasonable geological confidence.

- Positive factor: High grade component \(0.40% Rb2O\) within the resource.

Evidence · text

> maiden JORC-compliant estimate of 8.3 million tonnes at 0.27% Rb₂O \(6.2Mt Indicated at 0.28% and 2.1Mt Inferred at 0.25%\), containing approximately 23,000 tonnes of Rubidium oxide \(RB2O\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc#fact-resource-facts-3)

Seymour Project \(North Aubry\) · rubidium

#### Identity

- Project: Seymour Project \(North Aubry\)
- Commodity: rubidium
- Region: canada\_on
- Reported Region: Ontario, Canada
- Ticker: GT1

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:1bf0d680f4edaf991621

#### Resource Data

- Category: inferred
- Tonnes: 2100000
- Grade: 0.25
- Grade Unit: % Rb2O
- Contained Metal: 5250
- Contained Unit: t

#### Prior Estimate

- Resource Date: 2025-07-24

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: The maiden inferred rubidium resource at Seymour is a positive, adding to the overall resource, though with lower confidence.

- Positive factor: Maiden resource estimate for rubidium adds significant value and potential revenue stream.

- Negative factor: Inferred category has lower geological confidence.

Evidence · text

> maiden JORC-compliant estimate of 8.3 million tonnes at 0.27% Rb₂O \(6.2Mt Indicated at 0.28% and 2.1Mt Inferred at 0.25%\), containing approximately 23,000 tonnes of Rubidium oxide \(RB2O\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

## Metallurgical Results (2)

### pilot plant

[Link to this fact](https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc#fact-metallurgical-facts-4)

Seymour Lithium Project · lithium

#### Identity

- Project: Seymour Lithium Project
- Commodity: lithium
- Region: canada\_on
- Reported Region: Ontario, Canada
- Ticker: GT1

#### Test Work

- Program Status: detailed
- Test Type: pilot plant
- Processing Route: standard sulphation roast flow sheet
- Sample: Seymour spodumene concentrate

#### Recovery

- Recovery: 94 %
- Recovery Basis: actual\_test
- Conc. Grade: 56.5
- Conc. Grade Unit: % LiOH.H₂O

#### Lab

- Laboratory: EcoPro's South Korean facility

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: Successful pilot-scale production of high-purity battery-grade lithium hydroxide with excellent recovery significantly de-risks the company's integrated strategy.

- Positive factor: High recovery \(94%\) achieved for battery-grade lithium hydroxide production.

- Positive factor: Pilot plant scale testing provides high confidence in results.

- Positive factor: Confirms technical viability of integrated mine-to-chemical strategy.

- Positive factor: Utilizes a standard sulphation roast flowsheet, indicating conventional processing.

Evidence · text

> In partnership with EcoPro Innovation, GT1 also successfully produced battery-grade lithium hydroxide monohydrate \(LiOH.H₂O\) from Seymour spodumene concentrate at EcoPro's South Korean facility. EcoPro processed 600kg of concentrate with recoveries averaging above 94% to achieve a high-purity 56.5% product, significantly de-risking the Company's integrated lithium strategy, and proving our concentrates from the mine are amenable to conversion using a standard sulphation roast flow sheet.

#### Tags used in scoring

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test\_type names pilot-scale work

**High Recovery**

Polarity: positive

Definition: Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 94% is at or above the exceptional band \(80%\)

### Fact 2

[Link to this fact](https://atlas-staging.minestarters.com/news/gt1-annual-report-to-shareholders--a4bcb82e-6468-439a-8186-b3eb2256dbfc#fact-metallurgical-facts-5)

Seymour Lithium Project · tantalum

#### Identity

- Project: Seymour Lithium Project
- Commodity: tantalum
- Region: canada\_on
- Reported Region: Ontario, Canada
- Ticker: GT1

#### Test Work

- Sample: feed grade

#### Recovery

- Head Grade: 160
- Head Grade Unit: ppm Ta₂O₅

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-29T00:00:00.000Z

Reasoning: The identification of tantalum as a potential byproduct stream adds value to the Seymour project, offering an additional revenue opportunity.

- Positive factor: Identification of an additional critical mineral stream adds potential value.

- Positive factor: Potential for inclusion in existing DFS flowsheet with minimal modification.

- Negative factor: This is a feed grade, not a resource estimate, and economic viability as a byproduct is still under assessment.

Evidence · text

> GT1 subsequently identified a second additional critical mineral stream for potential inclusion in the Seymour DFS flowsheet — tantalum, at a feed grade of approximately 160ppm Ta₂O₅.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
