# Granada Gold Mine to Present at the Precious Metals &amp; Critical Minerals Virtual Investor Conference October 15, 2026

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/granada-gold-mine-to-present-at-the-precious-metals-critical-minerals-virtual-in--7651ba97-52a3-4d4b-8911-ec8c9fed1ca7

Original source: https://money.tmx.com/en/quote/GGM/news/6817329466617090/granada-gold-mine-to-present-at-the-precious-metals-critical-minerals-virtual-in

Publisher: tmx

Original announcement: 2026-10-14T12:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-15T10:23:53.984Z

Atlas analysis updated: 2026-10-15T10:23:53.984Z

- Company: Granada Gold Mine Inc.

- Ticker: GGM

- Exchange: TSX

- Region: Quebec, Canada

- Primary commodity: Gold

- Secondary commodities: None reported

- Document categories: Other, Resource update

- Extracted: 2026-10-15 10:23:54 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Granada Gold Mine Inc. will present at the Precious Metals &amp; Critical Minerals Virtual Investor Conference on October 15, 2026. The release also provides details on the company's current mineral resource estimate, which includes 890,600 ounces of gold in Measured and Indicated categories.

Reasoning: The document is primarily an announcement of an upcoming investor conference presentation, but it contains a restatement of the current mineral resource estimate which serves as technical background.

- Positive factor: Substantial gold mineral resources delineated

- Positive factor: NI 43-101 technical report support

- Positive factor: Qualified Person sign-off

- Negative factor: No additional diamond drilling included in this update

- Negative factor: Inferred resources have lower confidence

Facts used in scoring: 2

## Classification and evidence

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The resource estimate is supported by an amended NI 43-101 technical report.

Evidence · text

> supported by the amended NI 43-101 technical report

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Claude Duplessis, P.Eng., is named as the independent Qualified Person.

Evidence · text

> prepared by independent Qualified Person Claude Duplessis, P.Eng.

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### indicated

[Link to this fact](https://atlas-staging.minestarters.com/news/granada-gold-mine-to-present-at-the-precious-metals-critical-minerals-virtual-in--7651ba97-52a3-4d4b-8911-ec8c9fed1ca7#fact-resource-facts-0)

Granada Gold Project · gold

#### Identity

- Project: Granada Gold Project
- Commodity: gold
- Region: canada\_qc
- Reported Region: Quebec, Canada
- Ticker: GGM

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Claude Duplessis
- Resource group id: resource:50f1db5fa473561ff7e3
- Deposit or zone: in-pit and underground
- Mining method: combined
- Ownership percent: 100 %
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 15982000
- Grade: 1.73
- Grade Unit: g/t
- Contained Metal: 890600
- Contained Unit: oz
- Cutoff Grade: 0.25
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-06-08

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-14T00:00:00.000Z

Reasoning: Standard indicated resource reporting for the project.

- Positive factor: Supported by NI 43-101 technical report

- Negative factor: No new drilling included in this update

Evidence · text

> Measured and Indicated Mineral Resources of 890,600 ounces of gold \(15,982,000 tonnes at 1.73 g/t Au\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/granada-gold-mine-to-present-at-the-precious-metals-critical-minerals-virtual-in--7651ba97-52a3-4d4b-8911-ec8c9fed1ca7#fact-resource-facts-1)

Granada Gold Project · gold

#### Identity

- Project: Granada Gold Project
- Commodity: gold
- Region: canada\_qc
- Reported Region: Quebec, Canada
- Ticker: GGM

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Claude Duplessis
- Resource group id: resource:0d302b82257c783dc217
- Deposit or zone: Granada Gold Project
- Mining method: combined
- Ownership percent: 100 %
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 20096000
- Grade: 1.34
- Grade Unit: g/t
- Contained Metal: 865500
- Contained Unit: oz
- Cutoff Grade: 1.4
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-06-08

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-14T00:00:00.000Z

Reasoning: Inferred resource reporting.

- Negative factor: Lower confidence category

Evidence · text

> Inferred Mineral Resources of 865,500 ounces \(20,096,000 tonnes at 1.34 g/t Au\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
