Granada Gold Mine to Present at the Precious Metals & Critical Minerals Virtual Investor Conference October 15, 2026

Original announcement by tmx on

Company
Granada Gold Mine Inc.
Ticker
GGM
Exchange
TSX
Region
Quebec, Canada
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Other, Resource update
Extracted
2026-10-15 10:23:54 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Granada Gold Mine Inc. will present at the Precious Metals & Critical Minerals Virtual Investor Conference on October 15, 2026. The release also provides details on the company's current mineral resource estimate, which includes 890,600 ounces of gold in Measured and Indicated categories.

Reasoning: The document is primarily an announcement of an upcoming investor conference presentation, but it contains a restatement of the current mineral resource estimate which serves as technical background.

Positive factors

  • Substantial gold mineral resources delineated
  • NI 43-101 technical report support
  • Qualified Person sign-off

Negative factors

  • No additional diamond drilling included in this update
  • Inferred resources have lower confidence

Facts used in scoring: 2

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The resource estimate is supported by an amended NI 43-101 technical report.

Evidence · text

“supported by the amended NI 43-101 technical report”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Claude Duplessis, P.Eng., is named as the independent Qualified Person.

Evidence · text

“prepared by independent Qualified Person Claude Duplessis, P.Eng.”

Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

indicatedGranada Gold Project · goldTonnes: 15982000Grade: 1.73Grade Unit: g/tContained Metal: 890600Contained Unit: ozView all details
Link to this fact

Identity

Project
Granada Gold Project
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
GGM

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Claude Duplessis
Resource group id
resource:50f1db5fa473561ff7e3
Deposit or zone
in-pit and underground
Mining method
combined
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
15982000
Grade
1.73
Grade Unit
g/t
Contained Metal
890600
Contained Unit
oz
Cutoff Grade
0.25
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: Standard indicated resource reporting for the project.

Positive factors

  • Supported by NI 43-101 technical report

Negative factors

  • No new drilling included in this update

Evidence · text

“Measured and Indicated Mineral Resources of 890,600 ounces of gold (15,982,000 tonnes at 1.73 g/t Au)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

inferredGranada Gold Project · goldTonnes: 20096000Grade: 1.34Grade Unit: g/tContained Metal: 865500Contained Unit: ozView all details
Link to this fact

Identity

Project
Granada Gold Project
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
GGM

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Claude Duplessis
Resource group id
resource:0d302b82257c783dc217
Deposit or zone
Granada Gold Project
Mining method
combined
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
20096000
Grade
1.34
Grade Unit
g/t
Contained Metal
865500
Contained Unit
oz
Cutoff Grade
1.4
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: Inferred resource reporting.

Negative factors

  • Lower confidence category

Evidence · text

“Inferred Mineral Resources of 865,500 ounces (20,096,000 tonnes at 1.34 g/t Au)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.